Records from 2018 to 2025. Most recent: inspection, 10 September 2025.
Documentation record
Registered dimensions (L × B × D)64.0 ft × 19.0 ft × 8.8 ft
Registered tonnagegross 71 / net 57
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMORAN IRON WORKS · ONAWAY, MI, UNITED STATES · built 2019
Hull materialAluminum
PropulsionDiesel
Hull shapeShip
Hull configurationMonohull
Hailing portMUNISING, MI
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 29 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it71 - Simplified, Gross Ton
12 - Dead Weight, Ton
57 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 11
10 September 2025
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8233295
5 June 2024
COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7915834
18 April 2024
Examination of Repairs
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7915802
7 November 2023
Internal Structural Exam · Hull Examination
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7831067
6 September 2023
Annual Inspection · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7796063
6 June 2022
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7480235
8 September 2021
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7317035
3 November 2020
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7089032
16 September 2020
Annual Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7064985
13 September 2019
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6811280
15 October 2018
Construction Oversight · Deficiency Check · Initial Certification · Simplified Stability Test
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6706557
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 6 June 2022
Resolved
Eng rm bilges have excessive trash and debris, must be properly cleaned.
Action required: 705 - Other - as specified
Due 9 June 2022
Resolved 9 June 2022
Resolution: corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 June 2022
Resolved
RLB needs retro-reflective tape applied.
Action required: 10 - Deficiency Rectified
Due 6 June 2022
Resolved 6 June 2022
Resolution: corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 8 September 2021
Resolved
Engine room access and egress points need to be appropriately labeled with emergency exit criteria.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2021
Resolved 6 September 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 September 2021
Resolved
High water alarm not functioning in the steering compartment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 September 2021
Resolved 21 September 2021
Resolution: Corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 September 2020
Resolved
Replace unapproved RLB light with approved light. Night/low visibility operations are not permitted until light is replaced to OCMI satisfaction.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 September 2020
Resolved 3 November 2020
Resolution: Recieved statement from credentialed Master attesting to light replacement.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 2 July 2019
Resolved
Update first aid kit with required equipment and put into watertight container. 46 CFR 184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 July 2019
Resolved 15 July 2019
Resolution: Owner replaced first aid kit.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 2 July 2019
Resolved
Simple instructions with a diagram must be posted at or near the fixed gas fire extinguishing system cylinders detailing alternative release methods. 46 CFR 185.612
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 July 2019
Resolved 17 July 2019
Resolution: Owner provided picture of instructions and diagram.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 July 2019
Resolved
Float light must have lanyard of at least 3-6ft securing aroudn the body of the ring life buoy, the landyard must be attached with a corrosion-resistant clip. 46 CFR 180.70
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 July 2019
Resolved 15 July 2019
Resolution: Owner replaced lanyard and secured it to buoy with a clip.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 July 2019
Resolved
Provide proof that the circuit breaker installed on the generator and shore tie feeder conform to the requirements of UL 489. 46 CFR 183.380(m)
Action required: 705 - Other - as specified
Due 9 August 2019
Resolved 16 September 2020
Resolution: corrected.