MAURY USCG vessel records
← All vessels

MOLLY SCHULTE

MOLLY SCHULTE is a 2018 freight ship. The Coast Guard has recorded 7 inspections since 2019, most recently in March 2021, along with 1 deficiency and 2 operational controls.

Records from 2019 to 2021. Most recent: inspection, 16 March 2021.

Built
2018
Last inspected
16 March 2021
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 16 March 2021
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 3 calendar years (2019–2021)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9743485
9V3436
1544626
Flag
SINGAPORE
Maury page id
psix-1544626

Documentation record

Tonnage as PSIX records it30205 - Dead Weight, Ton
41235 - Displacement, Ton
10014 - Convention (Subpart B), Net Ton
27279 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 7

16 March 2021 Explosive Handling Operation-Commercial
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7164755
2 April 2020 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6934746
26 March 2019 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6649909
23 March 2019 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6643057
22 March 2019 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6647298
21 March 2019 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6646720
18 March 2019 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6644913

Deficiency record · 1

01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 23 March 2019 Resolved
001-Each transfer pipe system used for the transfer of oil or liquid hazardous material to or from a vessel with the capacity of 250 barrels or more must not leak under static liquid pressure at least 1.5 times the MAWP anually. The MAWP of the bunker line is 6 bar. Chief engineer conducted the bunker line test with air at 5 bar. Must conduct a hydrostatic test at 1.5 times MAWP prior to bunkering in the united states.
Action required: 705 - Other - as specified
Due 23 March 2019
Resolved 26 March 2019
Resolution: PSC NOLA recieved proper documentaion satisfying the requirement.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.