Records from 2019 to 2025. Most recent: inspection, 25 November 2025.
Inspection history · 8
25 November 2025
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8273810
24 February 2025
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8082534
26 November 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7829448
2 November 2023
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7819466
18 November 2022
PSC B · COC-CHEM & TVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7593061
12 November 2021
Administrative Inspection · COC-CHEM & TVE Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7347361
4 June 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6968073
2 November 2019
Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6845860
04 - Emergency Systems › N/A - No Subsystem › Emergency towing arrangements and procedures
Issued 24 February 2025
Resolved
For tankers constructed on or after 1 July 2002, Emergency towing arrangments design and construction and prototype testing of emergency towing arrangements shall be approved by the administration. PSCO observed emergency towing arrangements do not have current approval from administration. Cite 74SOLAS(20)II-1/3-4.1.2.2 40 a.c.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 November 2025
Resolution: PSC NOLA RECIEVED A CLASS REPORT FROM BV SATISFYING THE REQUIRMENT.
14 - Pollution Prevention › 148 - Ballast Water › Sediments
Issued 24 February 2025
Resolved
The master, owner, operator, agent, or person in charge of any vessel equipped with ballast water tanks that operates in the waters of the United States must rinse anchors and anchor chains when the anchor is retrieved to remove organisms and sediments at their place of origin. PSCO observed starboard side anchor covered in sediment. Cite 33CFR151.2050(e) 40 a.c.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 November 2025
Resolution: PSC NOLA RECIEVED A CLASS REPORT FROM BV SATISFYING THE REQUIREMENT.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 February 2025
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter diameter and is at least 25.4 millimeters long. It must be located at the top of the flange face midway between bolt holes, and inline with the bolt hole pattern. PSCO observed all vapor connection flanges are missing permanent studs. Cite 46CFR39.2001(j) 40 a.c.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 25 November 2025
Resolution: PSC NOLA RECIEVED A CLASS REPORT FROM BV SATISFYING THE REQUIREMENT.
14 - Pollution Prevention › 148 - Ballast Water › Extraordinary Condition Claims
Issued 18 November 2022
Resolved
The master, owner, operator, agent, or person in charge of a vessel equipped with ballast tanks that operates in the waters of the United States must employ one of the authorized ballast water management methods listed in 33 CFR 151.2025(a). Vessel’s ballast water management system is inoperable. Vessel has been granted an extraordinary circumstance to employ the ballast water management method listed in 33 CFR 151.2025(a)(3) to conduct cargo operations while in the Sector New Orleans COTP Zone. In accordance with 33 CFR 151.2040(b)(3), the vessel must discharge only that amount of ballast water operationally necessary to ensure the safety and stability of the vessel for cargo operations.
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 9 November 2023
Resolution: Inspection team verified BWMS was in full working order during exam.