Records from 2001 to 2011. Most recent: inspection, 7 August 2011.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 7 August 2011
Resolved
Provide proof of a valid COFR prior to entry into US waters
Action required: 15 - Rectify deficiencies by next port
Resolved 31 May 2013
Resolution: Vessel obtained a valid COFR
Lifesaving › Inflatable Liferafts › Servicing
Issued 7 August 2011
Resolved
Provide current life raft servicing certificate
Action required: 15 - Rectify deficiencies by next port
Resolved 11 June 2013
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 7 August 2011
Resolved
Provide fire servicing report for CO2 system
Action required: 15 - Rectify deficiencies by next port
Resolved 11 June 2013
Communications › Audible Communications › Horn/Whistle
Issued 7 August 2011
Resolved
Repair ships whistle
Action required: 15 - Rectify deficiencies by next port
Resolved 11 June 2013
Fire Fighting › Firemans Outfit › Quantity
Issued 7 August 2011
Resolved
Provide class attestation of a complete fire locker
Action required: 15 - Rectify deficiencies by next port
Resolved 11 June 2013
Lifesaving › Rescue Boat › Carriage Requirement
Issued 7 August 2011
Resolved
Provide service report for rescue boat cable
Action required: 15 - Rectify deficiencies by next port
Resolved 11 June 2013
Accommodation/Occupational Safety › Occupational Safety
Issued 20 November 2003
Resolved
Replace belt guards on front of main propulsion engines. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Action required: 15 - Rectify deficiencies by next port
Resolved 12 March 2004
Fire Fighting › Fire Hoses › Condition
Issued 20 November 2003
Resolved
Provide an Approval Letter for Vessel Response Plan prior to 15FEB03. LEGACY COMPONENT DESC: Vessel Response Plan
Action required: 15 - Rectify deficiencies by next port
Resolved 11 June 2013
Resolution: Hose provided
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 20 November 2003
Resolved
Post operating instruction for engine room fixed CO2 system at the remote operating site where CO2 bottles are stored.
Action required: 15 - Rectify deficiencies by next port
Resolved 12 March 2004
Electrical › Electrical Distribution System (service)
Issued 20 November 2003
Resolved
Replace or properly repair exposed wires located in stbd chain locker. LEGACY COMPONENT DESC: Cable
Action required: 15 - Rectify deficiencies by next port
Resolved 12 March 2004
Documentation › Logs/Records
Issued 14 November 2002
Resolved
Provide Garbage Logbook entries prior to next U.S. Port. LEGACY COMPONENT DESC: Garbage Recordkeeping
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 22 April 2003
Documentation › Safety/Response Plans/Programs
Issued 14 November 2002
Resolved
Provide a written shipboard Waste Management Plan prior to next U.S. Port. LEGACY COMPONENT DESC: Waste Management Plan
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 22 April 2003
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 14 November 2002
Resolved
Properly service portable CO2 fire extinguisher located on the bridge prior to next U.S. Port. LEGACY COMPONENT DESC: Service
Action required: 15 - Rectify deficiencies by next port
Resolved 22 April 2003
Engineering › Fuel Oil Service System
Issued 14 November 2002
Resolved
Pressure test all fuel oil and cargo oil pipelines to 1 1/2 times the Maximum Allowable Working Pressure prior to next U.S. Port. LEGACY COMPONENT DESC: Piping
Action required: 15 - Rectify deficiencies by next port
Resolved 22 April 2003
Engineering › Bilge Water Management System
Issued 14 November 2002
Resolved
Provide bilge slops fixed piping from bilge pump to main deck to a Standard Discharge Connection prior to 15DEC02. Include a means of stopping the pump. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Due 15 December 2002
Resolved 22 April 2003
Documentation › Logs/Records
Issued 14 November 2002
Resolved
Provide an Oil Record Book with Part II (Cargo / Ballast Operations), prior to next U.S. Port. LEGACY COMPONENT DESC: Oil Record Book
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 22 April 2003
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 14 November 2002
Resolved
Provide an Approval Letter for Vessel Response Plan prior to 15FEB03. LEGACY COMPONENT DESC: Vessel Response Plan
Condition: Unknown
Due 30 April 2004
Resolved 11 June 2013
Documentation › Safety/Response Plans/Programs
Issued 14 November 2002
Resolved
Provide an approved Shipboard Oil Pollution Emergency Plan (SOPEP) prior to 15FEB03. LEGACY COMPONENT DESC: SOPEP
Condition: Unknown
Due 15 February 2003
Resolved 22 April 2003
Documentation › Certificates/Documents
Issued 14 November 2002
Resolved
Provide Form A supplement to IOPP Certificate prior to next U.S. Port. LEGACY COMPONENT DESC: IOPP Certificate
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolved 22 April 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 29 January 2002
Resolved
By-pass fuel line (hose) at the pressure relief valve must be fixed piping. LEGACY COMPONENT DESC: Piping
Condition: Improper Installation
Due 28 February 2002
Resolved 15 February 2002
Navigation › Piloting/Steering › Maneuvering Information Fact Sheet
Issued 17 November 2001
Resolved
Provide and post maneuvering fact sheet in the pilothouse.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Lifesaving › Visual Distress Signals Launcher
Issued 17 November 2001
Resolved
Renew Search and Rescue Transponder in pilot house (expired in 1998).
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Lifesaving
Issued 17 November 2001
Resolved
Renew battery in EPIRB (expired Nov01).
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Navigation
Issued 17 November 2001
Resolved
Vessel missing RPM/Speed table in pilothouse.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Navigation
Issued 17 November 2001
Resolved
Vessel missing steering gear block diagram and instructions in the pilothouse.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Lifesaving
Issued 17 November 2001
Resolved
Provide two (2) additional hand held SOLAS approved distress flares prior to next U.S. port.
Condition: Unknown
Due 18 November 2001
Resolved 29 January 2002
Engineering
Issued 17 November 2001
Resolved
Install 21-gallon fixed oil containment around all main deck fuel oil and lube oil tank vents. Also, install fixed containment or portable containment around cargo piping manifolds.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Documentation
Issued 17 November 2001
Resolved
Provide and maintain an oil record book for machinery spaces and a 2nd oil record book for cargo.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Documentation
Issued 17 November 2001
Resolved
Provide on board, or make available, MSDS sheets for all hazardous materials carried, including diesel oil cargo.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Lifesaving
Issued 17 November 2001
Resolved
Provide vessel's name stenciled on every personal flotation device on board.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Navigation
Issued 17 November 2001
Resolved
Show proper operation of signal lamp on bridge.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Lifesaving
Issued 17 November 2001
Resolved
Provide retro-reflective tape on ring life buoy where missing.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Documentation
Issued 17 November 2001
Resolved
Complete and submit for USCG approval a Vessel Response Plan, prior to conducting any cargo operations in the United States.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Engineering
Issued 17 November 2001
Resolved
Provide oil transfer procedures on board prior to any bunkering or cargo operations in the United States.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Deck/Cargo
Issued 17 November 2001
Resolved
Install a pressure gauge in cargo piping after the cargo pump.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002
Deck/Cargo
Issued 17 November 2001
Resolved
Install cargo piping pressure relief valve at the cargo pump.
Condition: Unknown
Due 31 January 2002
Resolved 29 January 2002