MAURY USCG vessel records
← All vessels

ROYAL

ROYAL is a 2020 passenger vessel (inspected). The Coast Guard has recorded 7 inspections since 2019, most recently in March 2026, along with 9 deficiencies.

Records from 2019 to 2026. Most recent: inspection, 3 March 2026.

Built
2020
Last inspected
3 March 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

WDL4095
1586321
Flag
UNITED STATES
Maury page id
psix-1586321

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspections, by type

Years with a record 7 calendar years (2019–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Registered dimensions (L × B × D)45.0 ft × 15.0 ft × 6.0 ft
Registered tonnagegross 27 / net 21
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderALUMA MARINE · HARVEY, LA, UNITED STATES · built 2020
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 20 November 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it27 - Simplified, Gross Ton
21 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 7

3 March 2026 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8312743
3 April 2025 Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8094897
12 March 2024 Internal Structural Exam · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7868907
4 May 2023 Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7671884
7 April 2022 Annual Inspection · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7412968
8 February 2021 Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7137422
1 August 2019 Internal Structural Exam · COI Inspection · Hull Examination · Plan Review "T" Boat · Initial Certification · Simplified Stability Test · Deficiency Check · Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6815162

Deficiency record · 9

14 - Pollution Prevention › 141 - MARPOL Annex I › Oil fuel tank protection
Issued 4 May 2023 Resolved
Shutoff valves must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. Port engine weather deck shutoff valve found inoperable when tested. Replace or repair. 46 CFR 182.455(b)(4)
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 4 May 2023
Resolved 4 May 2023
Resolution: Vessel replaced pull cable for shutoff valve connection. Tested and found sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 May 2023 Resolved
A suitable warning device, visual or audible, must be installed at the operating station to indicate any reduction in normal water flow in the exhaust cooling system. Exhaust cooling temperature sensor on the starboard engine found disconnected. Replace or reconnect. 46 CFR 182.425(b)(5)
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 4 May 2023
Resolved 4 May 2023
Resolution: Vessel replaced temperature sensor. Tested and found sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 May 2023 Resolved
A pre-engineered fixed gas fire extinguishing system must: (4) Be installed in accordance with the manufacturer's instructions. S-hook for automatic activation found disconnected. Reconnect s-hook in accordance with manufacturer's instructions. 46 CFR 181.420(a)(4)
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 4 May 2023
Resolved 4 May 2023
Resolution: Vessel reconnected s-hook in accordance with manufacturer's instructions.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 7 April 2022 Resolved
Repairs or alterations to the hull that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. The vessel had repair the two (2) forward Port/Starboard bits and aft port bit repaired and re-welded. MI inspected welds using visual and air lance. 46 CFR 176.700(a)
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 7 April 2022
Resolved 7 April 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 April 2022 Resolved
Shutoff valves installed so as to close against the flow of fuel. Port side fuel shut off valve was inoperable. 46 CFR 182.455(b)(4)
Action required: 10 - Deficiency Rectified
Due 7 April 2022
Resolved 7 April 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 April 2022 Resolved
Cocks are prohibited except for the solid bottom type with tapered plugs and union bonnets. The vessel's Raccor fuel filters did not have a plug after the drain petcock. Repaired to the satisfaction of the MI.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 7 April 2022
Resolved 7 April 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 February 2021 Resolved
Exhaust gas must not leak from the piping or any connections. Auxiliary generator had a 3" crack in exhaust system. ROYAL shall replace or repair the damaged pipe to the satisfaction of the Coast Guard Marine Inspector. Exhaust leak was corrected on the spot.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 10 March 2021
Resolved 10 March 2021
Resolution: vessel rep welding crack on exhaust. see pictures in documents
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 8 February 2021 Resolved
When the exhaust cooling water system is separate from the engine cooling water system, a suitable warning device must be installed. Exhaust flow/temperature warning was damaged on stbd MDE. 46CFR182.425(b)(5)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2021
Resolved 26 March 2021
Resolution: Witnessed proper instalation of new sensor.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 February 2021 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Multiple flexible hoses on both MDE's has chafing and damage. Vessel shall replace flexible hoses and/or install chafing gear on each hose as necessary to the satisfaction of the attending marine inspector prior to carriage of cargo or passengers. 182.100
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 April 2021
Resolved 26 March 2021
Resolution: Verified repair of hoses and installation of chaffing gear.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.