Records from 2019 to 2026. Most recent: inspection, 4 March 2026.
Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 March 2025
Resolved
No marine employer may engage or employ any individual to serve as a crew member unless the individual passes a chemical test for dangerous drugs for that employer. Pre-employment testing documentation not provided. Provided pre-employment documentation to the satisfaction of the attending Marine Inspector.
46 CFR 16.210(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2025
Resolved 27 March 2025
Resolution: Received email from vessel rep with attached pre-employment test documentation from the consortium for each employee; all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 March 2025
Resolved
Drug testing programs required by this part must be conducted in accordance with 49 CFR part 40, Procedures for Transportation Workplace Testing Programs. SAP list not provided as described by 49 CFR 40.287. Provide SAP list to the satisfaction of the attending Marine Inspector.
46 CFR 16.113(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 April 2025
Resolved 27 March 2025
Resolution: Received email from vessel rep with attached SAP list; all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 March 2025
Resolved
No marine employer may engage or employ any individual to serve as a crewmember unless the individual passes a chemical test for dangerous drugs for that employer. Snorkel guides are employed as crew and preform safety sensitive duties, but no proof of pre-employment test or enrollment a random testing program could be provided. Snorkel guides to provide satisfactory evidence that they have: 1) Passed a chemical test for dangerous drugs, required by this part, within the previous six months with no subsequent positive drug tests during the remainder of the six-month period; (2) During the previous 185 days been subject to a random testing program required by § 16.230 for at least 60 days and did not fail or refuse to participate in a chemical test for dangerous drugs required by this part; 3) Enroll them in company drug program and provide a pre-employment test result; or 4) Provide satisfactory evidence that they are enrolled in a random drug program administered by a disinterested third party and provide a pre-employment test result, to the satisfaction of the attending Marine Inspector by March 19 2025.
46 CFR 16.210
Action required: 705 - Other - as specified
Due 19 March 2025
Resolved 20 March 2025
Resolution: Received email with consortium confirmation of enrollment certificate of compliance; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 11 March 2025
Resolved
Except as allowed by paragraph (e) of this section, each vessel certificated to operate on a limited coastwise route in warm water must be provided with life floats of an aggregate capacity that will accommodate at least 50% of the total number of persons permitted on board. Vessel primary life saving is a [name withheld] apparatus rectangular with net platform. 1) Provide a life float in accordance with the regulation; 2) Request a special consideration in accordance with 46 CFR 175.5503; or 3) Permanently reduce the vessels COI route permitted to no more than 3 miles from shore. Vessel route reduce to no more than 3 miles from shore until resolved to the satisfaction of the attending Marine Inspector by March 28, 2024.
46 CFR 180.205(c)
Action required: 705 - Other - as specified
Resolved 17 July 2025
Resolution: Recieved email from vessel rep Brian of new life float with proper markings.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 11 March 2025
Resolved
The float-free link required by § 180.130(a)(1) must be certified to meet § 160.073 in subchapter Q of this chapter, or other standard specified by the Commandant. The float-free link was not certified. Replace with a Certified float-free link meeting § 160.073 in subchapter Q of this chapter. Vessel route reduce to no more than 3 miles from shore until resolved to the satisfaction of the attending Marine Inspector by March 28, 2024.
46 CFR 180.137(b)(1)
Action required: 705 - Other - as specified
Resolved 26 March 2025
Resolution: Attended vessel and inspected the float free link to be certified; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 11 March 2025
Resolved
The float-free link required by § 180.130(a)(1) must be secured to the painter at one end and to the vessel on the other end. Float-free link not secured to the vessel or properly secured to the apparatus. Secure new float-free link to the vessel and apparatus. Vessel route reduce to no more than 3 miles from shore until resolved to the satisfaction of the attending Marine Inspector by March 28, 2024.
46 CFR 180.137(3)
Action required: 705 - Other - as specified
Resolved 26 March 2025
Resolution: Attended the vessel and visually inspected the float-free link secured to a shackle and the shackle was secured to a fixed point on the vessel; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 March 2025
Resolved
Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light. Light missing. Provide a floating water light approved under approval series 161.010 or other standard specified by the Commandant. The floating water light must be attached around the body of the life float or buoyant apparatus by a 10 mm (3/8 inch) lanyard, resistant to deterioration from ultraviolet light, and at least 5.5 meters (18 feet) in length. Vessel route reduce to no more than 3 miles from shore until resolved to the satisfaction of the attending Marine Inspector.
46 CFR 180.175(d) and 46 CFR 180.175(f)(4)
Action required: 705 - Other - as specified
Resolved 26 March 2025
Resolution: Attended vessel to visually inspected and test the floating water light arrangement; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 March 2025
Resolved
Equipment specifications for life floats and buoyant apparatus. The equipment required for life floats and buoyant apparatus must meet the following specifications: each paddle must be of at least 1,220 millimeters (4 feet) in length, lashed to the life float to which it belongs and buoyant. Paddles were less than 4 feet in length. Replace with the correct length and be buoyant. Vessel route reduce to no more than 3 miles from shore until resolved to the satisfaction of the attending Marine Inspector by March 28, 2025.
46 CFR 180.175(f)(2)
Action required: 705 - Other - as specified
Resolved 26 March 2025
Resolution: Attended vessel and sighted two new four foot paddles with vessel name; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 11 March 2025
Resolved
The number of persons capacity must be marked or painted in clearly legible letters and numbers on each life float and buoyant apparatus. This number must: (1) Be the number of persons the device is equipped for; and (2) Not be greater than the number of persons the device is approved for as shown on its nameplate. Person capacity not marked or painted on apparatus. Mark or paint person capacity on the apparatus to the satisfaction of the attending Marine Inspector by March 28, 2025.
46 CFR 185.604(e)
Action required: 705 - Other - as specified
Resolved 26 March 2025
Resolution: Attended vessel and visually sighted the persons capacity clearly marked; all sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 11 March 2025
Resolved
Exhaust blower switches must be located outside of any space required to be ventilated by this section and must be of the type interlocked with the starting switch and the ignition switch so that the blowers are started before the engine starter motor circuit, or the engine ignition is energized. A red warning sign at the switch must state that the blowers must be operated prior to starting the engines for the time sufficient to ensure at least one complete change of air in the space served. Exhaust blower switch located at the operating console is not interlocked with the starting switch and the ignition switch. Interlock the exhaust blower switch with starting switch and the ignition switch to the satisfaction of the attending Marine Inspector.
46 CFR 182.460(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2025
Resolved 26 March 2025
Resolution: Atttended the vessel and witnessed the ventilation blowers energize when the starting switch was turned on; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 11 March 2025
Resolved
Procedures for checking the proper operation of a flammable vapor detection system must be posted at the primary operating station. Flammable vapor detection system procedures for checking the proper operation not posted at the primary operating station. Post procedures to the satisfaction of the attending Marine Inspector.
46 CFR 182.480(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2025
Resolved 26 March 2025
Resolution: Attended vessel and visully sighted procedures for checking the proper operation of a flammable vapor detection system must be posted at the primary operating station; all ssat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2025
Resolved
An operation and maintenance manual for the flammable vapor detection system must be kept onboard. No operation and maintenance manual for the flammable vapor detection was onboard. Place onboard the operation and maintenance manual for the flammable vapor detection to the satisfaction of the attending Marine Inspector.
46 CFR 182.480(h)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2025
Resolved 26 March 2025
Resolution: Attended vessel and verified the operation and maintenance manual for the flammable vapor detection system was onboard; all sat.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 11 March 2025
Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radiobeacon (EPIRB) installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Safety Radiotelephony Certificate expired. Provide a valid Safety Radiotelephony Certificate to the satisfaction of the attending Marine Inspector.
46 CFR 184.502
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2025
Resolved 20 March 2025
Resolution: Received email with the valid Safety Radiotelephony Certificate attached; all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 March 2025
Resolved
Nonmetallic piping must not be used in gasoline or diesel fuel systems. However, these parts are needed to comply with EPA emissions requirements for gasoline fuel systems, as such we find the use of these components to be acceptable provided, they are certified by the EPA. Starboard fuel fill cap was not part of the Perko deck fill, part number 0661G00CHREPA and EPA certified. Provide the correct Perko certified EPA fill cap to the satisfaction of the attending Marine Inspector.
46 CFR 182.720(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2025
Resolved 26 March 2025
Resolution: Attended vessel and inspected fuel fill cap EPA certified; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 March 2025
Resolved
Fuses must be of the cartridge type only and be listed by Underwriters Laboratories or another independent laboratory recognized by the Commandant. There is one automotive blade type fuse under the operating console for the NEMA electronics. The Blue Seas ML-RBS remote battery switches have one automotive blade type fuse in the port electrical space and two automotive blade type fuses in the starboard electrical space. Replace with a UL cartridge type fuse of the same ampere rating to the satisfaction of the attending Marine Inspector.
46 CFR 183.380(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2025
Resolved 26 March 2025
Resolution: Attended vessel and vissually confirmed the automotive blade fuses were replaced with a UL cartridge type fuse of the same ampere rating: all sat.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 11 March 2025
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible; (2) U.S. Coast Pilot or similar publication; (3) Coast Guard Light List; (4) Tide tables; and (5) Current tables, or a river current publication issued by the U.S. Army Corps of Engineers or a river authority. Extracts from the publications listed above for the areas to be transited may be provided instead of the complete publication. U.S. Coast Pilot [name withheld] List were not current editions. Also, the tide tables were not onboard. Provide the required publications.As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible; (2) U.S. Coast Pilot or similar publication; (3) Coast Guard Light List; (4) Tide tables; and (5) Current tables, or a river current publication issued by the U.S. Army Corps of Engineers or a river authority. Extracts from the publications listed above for the areas to be transited may be provided instead of the complete publication. U.S. Coast Pilot [name withheld] List were not current editions. Also, the tide tables were not onboard. Provide the required publications.
46 CFR 184.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2025
Resolved 26 March 2025
Resolution: Attended vessel and visually confirmed the required nautical publications were current and onboard. Also, confirmed new chart and electronic chart plotter program had been updated; all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 March 2025
Resolved
EAP education program: Each EAP education program must include at least the following elements: display and distribution of informational material; display and distribution of a community service hot-line telephone number for crewmember. Service hot-line numbers were not posted. Post service hot-line numbers on board vessel to the satisfaction of the attending Marine Inspector.
46 CFR 16.401(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 March 2025
Resolved 26 March 2025
Resolution: Attended vessel and visually sighted the service hot-line numbers were posted on board vessel; all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 March 2025
Resolved
EAP education program: Each EAP education program must include at least the following elements: display and distribution of the employer's policy regarding drug and alcohol use in the workplace. Company’s drug policy was not onboard vessel. Place a signed copy of the company’s drug policy on board vessel to the satisfaction of the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 March 2025
Resolved 26 March 2025
Resolution: Attended vessel and confirmed the company drug program was posted; all sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 March 2025
Resolved
A vessel to which this subchapter applies may not be operated without having on board a valid U.S. Coast Guard Certificate of Inspection. Vessel's COI expired on 28FEB25 and is no longer valid.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 March 2025
Resolution: Vessel completed DD and COI exam MISLE activity 8077435
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 April 2024
Resolved
The following spaces must be equipped with a fixed gas fire extinguishing system in compliance with 181.410: A space containing propulsion machinery. Fireboy for port and stbd fuel tank space inoperable. Deficiency cleared prior to completion of inspection.
46 CFR 181.400 (a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 April 2024
Resolution: Conducted satisfactory fireboy test.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 8 April 2024
Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. The vessels EPIRB registration has expired.
46 CFR 180.64
Action required: 10 - Deficiency Rectified
Resolved 8 April 2024
Resolution: Recieved new EPIRB registration form from operator.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 April 2024
Resolved
A vessel not required to have a power driven fire pump by 181.300 must have at least three 2 1/2 gallon buckets, with an attached lanyard satisfactory to the cognizant [name withheld] attached to buckets inadequate in length. Replace with longer lanyards in order to retrieve water from over the side of the vessel.
46 CFR 181.610
Action required: 10 - Deficiency Rectified
Resolved 8 April 2024
Resolution: Replaced with longer lanyards.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 April 2024
Resolved
Connections must be made to the battery terminals with permanent type connectors. Connections on batteries made with non permanent connectors.
46 CFR 183.350 (d)
Action required: 10 - Deficiency Rectified
Resolved 8 April 2024
Resolution: Replaced wing nut with permanent type connection.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 7 February 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 February 2023
Resolution: Publications provided.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 February 2023
Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Ventilation duct closures were not readily available, provide readily available closure devices. 46 CFR 182.465(h)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 February 2023
Resolution: Vent plugs provided to secure vent opening.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 February 2023
Resolved
Each portable fire extinguisher on a vessel must be of an approved type. Bracket for 01 fire extinguisher was broken. Replace with USCG approved bracket as referenced on each label. 46CFR 181.500(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 February 2023
Resolution: Bracket replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 February 2023
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Retro reflective tape on life
float was faded. Replace retro reflective tape. 46 CFR 176.808(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 February 2023
Resolution: Retro tape replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 January 2022
Resolved
Vessel required to have one 24" ring lifebuoy fitted with 60' lifeline and floating water light attached with a corrosion resistant clip to allow quick disconnect. Ring lifebouy found cracked and faded. Provide serviceable ring lifebuoy onboard vessel and properly arranged.
46 CFR 180.70
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2022
Resolved 27 January 2022
Resolution: vessel replaced ring buoy, all sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 February 2021
Resolved
The owner, managing operator, or a qualified servicing facility as applicable shall conduct inspections and test of portable, semi-portable, and fixed gas fire extinguishing systems. Vessel has not had Fireboys serviced within the last year. Vessel must provide servicing report and complete operational test of Fireboy ventilation shutdowns and engine override to the satisfaction of the attending marine inspector.
46 CFR 176.810(b)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 19 February 2021
Resolution: Vessel provided annual servicing report to the attending MI.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 18 February 2021
Resolved
The numbers of persons capacity must be marked or painted in clearly legible letters and numbers on each life float and buoyant apparatus. Life float is not clearly marked with the persons capacity.
46 CFR 185.604(e)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 February 2021
Resolved 19 February 2021
Resolution: Vessel stenciled persons capacity on lifefloat to the satisfaction of the MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 February 2020
Resolved
A space containing machinery powered by, or fuel tanks for, gasoline must have a ventilation system that complies with this section for enclosed space: vessel does not meet the requirements for start ignition interlock with exhaust blower motor, required supply and exhaust ventilation duct system and has inline exhaust blower within ventilation duct.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 March 2020
Resolved 12 March 2020
Resolution: Witnessed satisfactory installation and testing of ignition interlock to powered exhaust ventilation blower and required shutdown on simulated fixed extinguishing system release. All satisfactory.