Records from 2000 to 2005. Most recent: operational control imposed, 10 September 2005.
Inspection history · 12
10 September 2005
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2493233
10 September 2005
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2496549
5 September 2005
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2493916
5 September 2005
Type not recorded
No type recorded · USCGC HARRIET LANE (WMEC 903) · Activity 2522631
3 September 2005
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2495054
2 September 2005
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2481595
25 August 2005
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2474882
28 May 2005
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2381149
25 May 2005
PII Safety Exam · ISPS II Exam
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2368148
1 November 2004
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2232873
29 September 2000
Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 12345
27 September 2000
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 282574
Lifesaving › Lifeboat › Hull
Issued 25 May 2005
Resolved
Attest to repairs to port lifeboat hull starboard side prior to departing the Port of Hampton Roads.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 4 June 2005
Resolution: Received class report attesting to the permanent repairs.
Lifesaving › Lifeboat › Hull
Issued 25 May 2005
Resolved
Attest to repairs to starboard lifeboat hull port side prior to departing the Port of Hampton Roads.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 4 June 2005
Resolution: Received class report attesting to permanent repairs.
Deck/Cargo › Cargo Heating › General
Issued 25 May 2005
Resolved
Conduct repairs to deck steam line centerline inboard above cargo tank 1C - leaking at flange and bolt.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 28 June 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to the repairs.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 25 May 2005
No resolution recorded
Conduct repairs to portside hydraulic block distribution valve to cargo control valves-leaking at the block housing. Location: above cargo tank 2P.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 October 2005 — due date passed with no resolution recorded
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 25 May 2005
Resolved
Conduct repairs to cargo tank vent pipe to cargo tank 1C 5 feet inboard holed portside prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to the repairs.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 25 May 2005
Resolved
Repair cargo vent pipe to cargo tank 4C at deck level prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to the repairs.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 25 May 2005
Resolved
Conduct repairs to vent pipe to 4C cargo tank - attached to portside verticle tower - piped holed at 90 degree elbow. To be completed prior to vessel departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to the repairs.
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 25 May 2005
Resolved
Conduct repairs to port slop tank vent - holed 10 feet inboard. To be completed prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to the repairs.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 25 May 2005
Resolved
Replace CO2 flexloop line to pain store room number 19 prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 4 June 2005
Resolution: Received class report attesting to the replacement of the system.
Fire Fighting › Fire Main › Material
Issued 25 May 2005
Resolved
Conduct repairs to deck foam line dressor coupling located amidship prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received clas surveyors report attesting to the repairs.
Fire Fighting › Emergency Fire Pumps › Arrangement
Issued 25 May 2005
Resolved
Conduct repairs to emergency fire pump exhaust pipe.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to the repairs.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 25 May 2005
Resolved
Conduct U.T. guaging of cargo pump room sea chest and intake pipe due to signs of wastage prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to satisfactory findings.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 25 May 2005
No resolution recorded
Temporary repair to sea chest pipe starboard side at 90 degree elbow in cargo pump room carried out to the satisfaction of class surveyor. Permanent repairs cannot be completed at this time due to the complexity of piping and availability of materials. Final repairs to be carried out NLT 01AUG2005.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 August 2005 — due date passed with no resolution recorded
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 25 May 2005
No resolution recorded
Temporary repair to cargo pump room port side lower level stripping pipe at "T" connection carried out by welding to the satisfaction of the attending class surveyor. Permanent repairs to be carried out NLT 01AUG2005.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 August 2005 — due date passed with no resolution recorded
Lifesaving › Lifeboat › Propulsion Engine
Issued 25 May 2005
Resolved
Conduct repairs to port lifeboat keel coolers prior to departing the Port of Hampton Roads.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 4 June 2005
Resolution: Recieved class surveyors report attesting to the repairs and test of the keel coolers.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 25 May 2005
Resolved
Conduct U.T. guaging of starboard side tank top sea chest in engine room prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to satisfactory findings.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 25 May 2005
Resolved
Conduct U.T. guaging of port side tank top sea chest in engine room prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to satisfactory findings.
Engineering › Sea-water System (primary cooling) › Pump
Issued 25 May 2005
No resolution recorded
Temporary repair to the auxiliary saltwater intake pipe to main saltwater line port side forward of main diesel engine carried out by doubler patch to satisfaction of attending class surveyor. Permanent repairs to be carried out NLT 01AUG2005.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 August 2005 — due date passed with no resolution recorded
Communications › Alarms/Indicators › Rudder Angle Indicator
Issued 25 May 2005
Resolved
Conduct repairs/adjustment to helm system on the bridge. Reading not matching rudder indicator. Helm set at "O", rudder indicator of by 3 - 4 degress. To be conducted prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveryors report attesting to the repairs.
Engineering › Steering Gear System › Rudder Stock
Issued 25 May 2005
Resolved
Conduct repairs to rudder stock packing gland in steering gear room prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to the repairs.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 25 May 2005
Resolved
Replace reflective tape on numerous lifejackets on vessel that are in poor condition prior to departing the Port of Hampton Roads.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 1 June 2005
Resolution: Received class surveyors report attesting to the above requirement.
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 25 May 2005
Resolved
Procedures to ensure that this ship is maintained in conformity with provisions of the relevant rules and regulations and with any additional requirements which maybe established by the company, have not been established. Thereby, Conduct an external SMS exam audit within 72 hours by the RO or authorized classification society surveyor with the attendance of a Coast Guard Marine Inspector.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 30 May 2005
Resolved 4 June 2005
Resolution: SMS audit conducted with the presence of C.G. and DNV. Report in file.
Engineering › Lubricating Oil Service System › Tube
Issued 27 September 2000
Resolved
STANDARD DISCHARGE CONNECTION DOES NOT MEET SPECIFICATIONS IN MARPOL. FABRICATE OR PROCURE A CORRECT STANDARD DISCHARGE CONNECTION PRIOR TO RETURN U.S.
Condition: Unknown
Due 1 October 2000
Resolved 2 September 2005
Resolution: Old requirement cleared.
Fire Fighting › Fire Main › Condition
Issued 27 September 2000
Resolved
HOLE IN #2C-FOAM LINE FIXED WITH TEMPORARY PATCH ON PORT SIDE. REPAIR OR RENEW PRIOR TO RETURN U.S. AND PROVIDE CLASS REPORT.
Condition: Unknown
Due 1 October 2000
Resolved 2 September 2005
Resolution: Cleared old requirement.