MAURY USCG vessel records
← All vessels

AST MALTA

AST MALTA is a 1998 freight ship. The Coast Guard has recorded 1 inspection in 2019, along with 1 deficiency.

Records in 2019. Most recent: inspection, 16 December 2019.

Built
1998
Last inspected
16 December 2019
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 2016.

Inspection record

Last inspected 16 December 2019
Operational controls None recorded without a removal date
Years with a record 1 calendar year (2019)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9143398
9HA2174
1597966
Flag
MALTA
Maury page id
psix-1597966

Documentation record

Tonnage as PSIX records it3415 - Convention (Subpart B), Gross Ton
5001 - Dead Weight, Metric Ton
6950 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 1

16 December 2019 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6874381

Deficiency record · 1

14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 16 December 2019 Resolved
Each transfer pipe system must not leak under static liquid pressure at least 1.5 times the maximum working pressure and tested annually or part of bi-annual or midperiod inspections. Vessel's bunker transfer manifold was tested with air and no records were available to show last hydrostatic test. Vessel must show proof of satisfactory hydrostatic test to 1.5 times the max allowable working pressure prior to bunkering in US waters.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 December 2019
Resolution: Received test report from last drydock in 2018 attesting to the satisfactory hydrostatic test of bunker piping.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.