The 1 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Share this recordDownload vessel cardDownload QRMaury, US Coast Guard vessel record for AST MALTA, retrieved 18 September 2026. mauryrecords.com/v/psix-1597966.html
Documentation record
Tonnage as PSIX records it3415 - Convention (Subpart B), Gross Ton 5001 - Dead Weight, Metric Ton 6950 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Inspection history · 1
16 December 2019ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6874381
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 16 December 2019Resolved
Each transfer pipe system must not leak under static liquid pressure at least 1.5 times the maximum working pressure and tested annually or part of bi-annual or midperiod inspections. Vessel's bunker transfer manifold was tested with air and no records were available to show last hydrostatic test. Vessel must show proof of satisfactory hydrostatic test to 1.5 times the max allowable working pressure prior to bunkering in US waters.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 December 2019
Resolution: Received test report from last drydock in 2018 attesting to the satisfactory hydrostatic test of bunker piping.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.