Records from 1997 to 2004. Most recent: inspection, 11 April 2004.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 9
11 April 2004
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2045223
7 January 2004
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2014231
23 December 2002
Annual Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1722628
18 November 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1075889
5 October 2001
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1074523
15 June 2000
Uninspected Other
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1381930
28 January 2000
Uninspected Other
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1045569
21 August 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 762471
6 June 1997
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 200846
Fire Fighting
Issued 28 January 2000
Resolved
PROVIDE ONE ADDITIONAL B-IV TYPE EXTINGUISHER FOR THE HELIDECK.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Construction/Loadline
Issued 28 January 2000
Resolved
PROVIDE FLANGE BLANKS FOR SKIMMER TANK DISCHARGE PIPING ON BARGE DECK TO REDUCE RISK OF ACCIDENTAL DISCHARGE.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Documentation
Issued 28 January 2000
Resolved
SUBMIT FOR APPROVAL EMERGENCY EVACUATION PLAN TO [name withheld].
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Fire Fighting
Issued 28 January 2000
Resolved
PROPERLY NUMBER ALL FIRE HOSE STATIONS I.A.W. STATION BILL. OUTFIT EACH STATION WITH SPANNER, HOSE RACK, 50' HOSE, AND APPROVED COMBINATION NOZZLE.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Lifesaving
Issued 28 January 2000
Resolved
SECURE MOTOR TO PUMP COUPLING GUARDS THROUGHOUT AS NECESSARY. PROVIDE DEAD-MAN TYPE NOZZLE TO REFUELING STATION.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Engineering
Issued 28 January 2000
Resolved
RENEW SECTION OF FLEXIBLE FUEL OIL PIPING ON NO.2 MAIN GENERATOR. REMOVE PETCOCKS AND PROVIDE FLAME BOWL AND PLUG TO RACOR TYPE FILTERS ON MAIN ENGINES.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Fire Fighting
Issued 28 January 2000
Resolved
CROP AND RENEW FIREMAIN PIPING WHERE WASTED. HYDROSTATICALLY TEST TO 1.5 TIMES THE MAWP WHEN REPAIRS COMPLETED.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Electrical
Issued 28 January 2000
Resolved
PROPERLY SEAL ALL BULKHEAD PENETRATIONS THROUGHOUT WITH FIRE CAULK. SECURE ALL LOOSE ELECTRICAL WIRING WITH METAL BANDS IN HAZARDOUS AREAS AND LIVING QUARTERS.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Lifesaving
Issued 28 January 2000
Resolved
IN PAINT LOCKER, PROVIDE MEANS TO SECURE VENT AND MODIFY SHELVING TO PERMITTHE SPREAD OF CO2 WHEN ACTIVATED. POST OPERATING INSTRUCTIONS FOR FIXED GASSYSTEM.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Electrical
Issued 28 January 2000
Resolved
PROPERLY LABEL ALL MOTOR CONTROLLERS THROUGHOUT AS NECESSARY, ALONG WITH DISTRIBUTION PANELBOARDS.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Lifesaving
Issued 28 January 2000
Resolved
PROVIDE USCG APPROVED PFD LIGHTS FOR ALL LIFEJACKETS.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Fire Fighting
Issued 28 January 2000
Resolved
LABEL ALL GENERAL ALARMS AND CONTACT MAKERS AND MAKE ALL FIRE DAMPERS IN LIVING QUARTERS EASILY ACCESSIBLE.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Electrical
Issued 28 January 2000
Resolved
PROPERLY SECURE WIRING AT SHALE SHAKERS AND RENEW WIRING THAT IS CHAFFED. REPLACE MISSING FASTENER ON EXPLOSION PROOF FIXTURE ON DRILL FLOOR.
Condition: Unknown
Due 28 January 2000
Resolved 28 January 2000
Navigation
Issued 28 January 2000
Resolved
PROPERLY INSTALL FOGHORN AND OBSTRUCTION LIGHTS I.A.W. 33 CFR PART 67.
Condition: Unknown
Due 28 January 2000