Records from 2019 to 2026. Most recent: inspection, 25 February 2026.
Documentation record
Registered dimensions (L × B × D)68.0 ft × 16.0 ft × 5.8 ft
Registered tonnagegross 42 / net 33
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBENTZ BOATS LLC · LEWISTON, ID, UNITED STATES · built 2020
Hull materialAluminum
PropulsionJet Drive
Hull shapeShip
Hull configurationMonohull
Hailing portLake Powell, AZ
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 10 February 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it33 - Simplified, Net Ton
42 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 8
25 February 2026
COI Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8298671
22 April 2025
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8123437
22 April 2024
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7888720
16 June 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7718400
19 April 2023
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7663523
8 June 2022
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7476788
26 May 2021
Deficiency Check · COI Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7199518
6 November 2019
Construction Oversight · Inclining Experiment · Initial Certification · Plan Review "T" Boat · Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7057627
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 19 April 2023
Resolved
All personnel in a safety sensitive position are required to be enrolled in a drug and alcohol program. The deckhands required for the vessels operation are not enrolled in a DOT drug and alcohol program and were switched to a non DOT drug and alcohol program.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 24 October 2023
Resolution: 24OCT2023: Recieved documentation verifying the vessels are in compliance with 46CFR16.
00 defs issued / 01 cleared / 00 remain outstanding.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 May 2021
Resolved
Vessel wiring does not match the arrangement shown in the approved drawing, for example there are unprotected conductors wired to the positive terminal of all three starting batteries. Re-wire vessel to match drawing or submit amended drawing for approval prior to operating.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2021
Resolution: Received and updated A/C 1-line diagram for review and photos of added over current protection on the charging circuit.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 26 May 2021
Resolved
The vessel's audible and visual bilge alarms do not operate when the engine controls are turned off. The bilge alarm system must be modified such that the bilge alarms operate in all conditions.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2021
Resolution: Received evidence via email that the bilge alarm wiring had been rewired for proper operation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 May 2021
Resolved
At the time of inspection, the crew was unable to effectively operate the #2 bilge pump due to lack of familiarity with the system. Provide clear instructions and/or signage on the system to ensure the crew is able to operate the bilge/fire system in the event of an emergency.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2021
Resolution: Received photo evidence that signage was posted to explain the bilge/fire system's operation to the crew.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 26 May 2021
Resolved
The equalization piping arranged between voids 2 and 4 does not meet the requirements of MTN 2-95, specifically it is not arranged to prevent transfer of liquid between the two compartments in the intact condition. The design must be modified to match the arrangements in the forthcoming stability calculations, and a plan showing all components to include full-penetration welded bulkhead penetrations must be submitted for approval.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 August 2021
Resolution: Received photo evidence that the equalization piping has been removed and capped.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 May 2021
Resolved
The generator fuel filter is made with a plastic housing without a filter bowl. Replace the existing filter with one that is fitted with a steel bowl.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 May 2021
Resolved 18 August 2021
Resolution: Replaced plastic fuel filter with one of metal construction.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 May 2021
Resolved
Brass nuts are installed at the bulkhead penetration in the stainless steel main engine and generator fuel piping on the forward engineroom bulkhead. Non-ferrous fittings used in vital systems must be accompanied by provisions to prevent or mitigate the effects of galvanic corrosion. Replace brass nuts with stainless or propose another solution to mitigate galvanic corrosion.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 18 August 2021
Resolution: Replaced brass fittings with stainless steel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 May 2021
Resolved
Each bulkhead penetration must be accomplished using an acceptable metallic through-bulkhead fitting that is welded or otherwise attached to the bulkhead by an acceptable method. The AC piping bulkhead penetrations are currently made with plastic fittings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 18 August 2021
Resolution: Plastic bulkhead fittings replaced with metal fittings.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 26 May 2021
Resolved
The sealant in the stuffing tube on the port side of the forward engine room bulkhead has failed and is not watertight. Affect repairs to make the stuffing tube watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 18 August 2021
Resolution: Removed bulkhead fitting and sealed with plug.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 26 May 2021
Resolved
Penetrations in the collision bulkhead must be as high and as far inboard as practicable. The wiring penetration in the collision bulkhead is near the port sideshell and is not as far inboard as practicable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 18 August 2021
Resolution: Wires were removed and bulkhead was plugged.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 May 2021
Resolved
The part of the exhaust system between the engine manifold and the point of cooling water injection must be insulated. Add insulation from the turbo the the cooling water injection point on all engines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 18 August 2021
Resolution: Additional insulation added.
10 - Safety of Navigation › N/A - No Subsystem › Long-range identification and tracking system (LRIT)
Issued 26 May 2021
Resolved
Vessels greater than 65' in length engaged in commercial service must be outfitted with AIS. Either outfit the vessel with AIS or request a deviation under 33 CFR 164.55.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 12 July 2021
Resolution: Issued a letter allowing for a deviation from the AIS Requirements. Deviation located in local OCMI vessel files.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 May 2021
Resolved
Vessel wiring does not match the arrangement shown in the approved drawing. Re-wire vessel to match drawing or submit amended drawing for approval prior to operating, and have USCG Marine Inspector verify installation in person. To be completed by the vessel's next inspection.
Action required: 705 - Other - as specified
Resolved 29 April 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 17 September 2020
Resolved
Upon delivery, prior to the carriage of passengers, the Owner must make the vessel available to the cognizant OCMI and allow for a New to Zone Inspection.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 September 2021
Resolved 26 May 2021
Resolution: completed new-to-zone COI inspection