Records from 2020 to 2026. Most recent: inspection, 28 January 2026.
Inspection history · 12
28 January 2026
Bulk Liquid Transfer Monitor
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8303096
16 December 2025
COC-GAS Annual · PSC C
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8282770
28 August 2024
COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7991068
25 September 2023
PSC B · COC-GAS Annual · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7797302
28 September 2022
ISPS Exam · Ballast Water Examination · PSC B · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7567835
10 November 2021
Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7348762
19 April 2021
PSC B · COC-GAS Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7174575
19 April 2021
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 7180437
18 April 2021
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7178633
23 June 2020
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7000498
13 February 2020
Administrative Inspection · COC-GAS Renew · Deficiency Check · PSC A
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6906488
13 February 2020
Special
Type not classified · Liquefied Gas Carrier National Center of Expertise · Activity 6909381
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 19 April 2021
Resolved
Gas detection equipment shall be designed, installed and tested in accordance with recognized standards and shall be suitable for the cargoes to be carried in accordance with column "F" of CH 19 of IGC. Vessel does not have span gas on baord for testing and calibrarion of gas detection system.
74 SOALS (14) VII/13.1 IGC 2016 13.6.3
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 31 July 2021
Resolved 19 April 2021
Resolution: Span gas was delivered to the vessel according to attestation by atending class surveyor. See class report in documents.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 19 April 2021
Resolved
Emergency generating set arranged tobe automatically started ahall be equipped with starting devices approved by the administration witha stored energy capability of at least three consecutive starts. A second source of emergency starting shall be provided for an additional three starts within 30 minutes unless manual starting can be demonstrated to be effective. Secondary means of starting, spring loaded hand crank, was inoperable.
74 SOLAS (14) II-1/44.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 April 2021
Resolved 19 April 2021
Resolution: Vessel had new starter delivered to vessel to replace. As well, Class attended vsl and provided necessary documentation attesting to the repair and condition of the starting arrangements. See class report in documents.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 April 2021
Resolved
Electrical installations shall be in accordance with recognized standards (IEC 60092-502). Vessel has improperly installedlight fixture by compressor on deck.
74 SOLAS (14) VII/13.1 IGC 2016 10.2.2
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 31 July 2021
Resolved 10 November 2021
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 February 2020
Resolved
Electrical installations shall be in accordance with recognized standards(IEC 60092-502:1999). PSCO observed 05 electrical lighting fixtures while conducting the cargo exam deck walk without the devices capable of maintaining the integrity of the closure. - 74SOLAS(14) VII/13.1, IGC CODE 2016 10.2.2
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 24 February 2020
Resolution: Class report received attesting to the installation of certified safe electrical installations.
12 - Dangerous Goods › N/A - No Subsystem › Instrumentation
Issued 13 February 2020
Resolved
Gas detection equipment shall be designed, installed and tested in accordance with recognized standards and shall be suitable for the cargoes to be carried in accordance with column "F" in the IGC CH. 19 table. Vessel was not provided with appropriate fixed gas detection testing procedures or proper fixed gas detection testing equipment.- 74SOLAS(14) VII/13.1, IGC Code 2016 13.6.3
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 13 February 2020
Resolution: Vessel provided PSCO with appropriate fixed gas detection testing procedures and proper fixed gas detection testing equipment.
12 - Dangerous Goods › N/A - No Subsystem › Instrumentation
Issued 13 February 2020
Resolved
Instruments shall be tested to ensure reliability under working conditions and recalibrated at regular intervals. High level alarms on the number 1 and 3 cargo tanks were found to be leaking product during manual testing.- 74SOLAS(14) VII/13.1, IGC Code 2016 13.1.3.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 13 February 2020
Resolution: High level alarms on the number 1 and 3 cargo tanks were tighted and testing.