Records from 2020 to 2022. Most recent: inspection, 6 April 2022.
Inspection history · 24
6 April 2022
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7426136
8 March 2022
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7407713
9 February 2022
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7393151
10 January 2022
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7377650
13 December 2021
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7366793
21 November 2021
Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7354975
25 October 2021
PSC B
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7337463
23 August 2021
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7293682
28 July 2021
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7269994
6 April 2021
PSC B
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7169320
7 January 2021
Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7120720
5 December 2020
PSC B · COE-Administrative
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7106659
1 December 2020
Deficiency Check · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7104598
13 November 2020
Ballast Water Examination · Deficiency Check · PSC B
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7092605
4 November 2020
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7089959
6 October 2020
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7074822
5 October 2020
Deficiency Check · PSC B
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7072092
9 September 2020
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7054709
10 August 2020
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7026816
10 July 2020
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7002408
13 June 2020
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6975221
16 May 2020
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6954058
23 April 2020
COE-Administrative
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6941189
26 March 2020
PSC A
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6930325
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 25 October 2021
Resolved
The machinery shall be so installed as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts. The flywheel guards for auxilliary engine 2 & 3 are partially missing or damaged.
Condition: Damaged By Earlier Event
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 21 November 2021
Resolution: Received Class survey attesting to repairs and Master statement. see documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 December 2020
Resolved
SOLAS 74 (14CONS)
CH I Reg 11b
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 January 2021
Resolution: Received satisfactory report from class NKK. See attached
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 November 2020
Resolved
99101- Electrical installations shall be such that the safety of the crew and ship from electrical hazards shall be ensured. Two mast lights are hanging from their wires.
SOLAS(04) II-1/40.1.3
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 November 2020
Resolved 1 December 2020
Resolution: Received Class documentation attesting to repair. see docs.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 13 November 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Hospital exterior bulkhead, hospital exterior door and exterior door frame are wasted and holed. Additionally a drain pipe in the exterior bulkhead is wasted and holed. SOLAS 04) I/11a
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 November 2020
Resolved 1 December 2020
Resolution: Received Class documentation attesting to repair. see docs.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 13 October 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. During the PSC exam, found the emergency fire pump not ready for immediate us. Prior to starting the fire pump, an engineer was required to loosen the packing gland that was tightened down due to excessive leaks on the pump shaft. Additionally, the emergency fire pump discharge valve was found in the closed position, rendering it not available for immediate use. After opening the discharge valve and allowing sea water into the firemain system, the suction pipe to the emergency fire pump ruptured due to severe wastage and lack of routine maintenance rendering the fire pump inoperable in the event of emergency use. Furthermore, appropriate parties were not notified due to the crew’s lack of knowledge of the reporting procedures as required by the vessel’s safety management system.
74 SOLAS(04) I/11
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 October 2020
Resolved 13 November 2020
Resolution: Received NK class report verifying emergency fire pump packing glands were renewed, suction pipe repair doesn't leak and satisfactory testing.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 13 October 2020
Resolved
After any survey of the ship under regulation 8 has been completed, no change shall be made in the structural arrangements, machinery, equipment, and other items covered by the survey, without the sanction of the administration. During PSC exam, found unauthorized patch repairs on discharge pipe of No.2 fire pump and sea water supply pipe to fresh water generator. There is no documentation onboard recording these repairs. No notifications were made to the company regarding the wasted pipes, installation of patches, or who conducted the unauthorized repairs. Furthermore, appropriate parties were not notified due to the lack of the crew’s knowledge of the reporting procedures as required by the vessel’s safety management system.
74 SOLAS(04) I/11 ISM CODE Part A/10
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 October 2020
Resolved 13 November 2020
Resolution: Received NK class report attesting to renewal of No.2 fire pump discharge pipe renewal and satisfactory test.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 October 2020
Resolved
The number of openings in watertight subdivisions is to be kept to a minimum compatible with the design and proper working of the ship. A rubber hose, used to supply water from the fresh water generator to the fresh water tank, was found passing through two opened hatch covers that are normally closed for fire and flooding protection. The hose penetrated through two watertight and fire boundaries in the ship. The unauthorized modification poses a risk to safety of the vessel and crew in the event of flooding or fire. Furthermore, appropriate parties were not notified due to the lack of the crew’s knowledge of the reporting procedures as required by the vessel’s safety management system.
74 SOLAS(04) II-1/25.9
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 October 2020
Resolved 13 November 2020
Resolution: Received NK class report attesting to removal of the rubber hose, and satisfactory condition of fresh water pipe. Additionally, watertight boundaries were sealed.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 9 October 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. During the PSC exam, found the emergency fire pump not ready for immediate us. Prior to starting the fire pump, an engineer was required to loosen the packing gland that was tightened down due to excessive leaks on the pump shaft. Additionally, the emergency fire pump discharge valve was found in the closed position, rendering it not available for immediate use. After opening the discharge valve and allowing sea water into the firemain system, the suction pipe to the emergency fire pump ruptured due to severe wastage and lack of routine maintenance rendering the fire pump inoperable in the event of emergency use. Furthermore, appropriate parties were not notified due to the crew’s lack of knowledge of the reporting procedures as required by the vessel’s safety management system.
74 SOLAS(04) I/11
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 13 October 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 9 October 2020
Resolved
After any survey of the ship under regulation 8 has been completed, no change shall be made in the structural arrangements, machinery, equipment, and other items covered by the survey, without the sanction of the administration. During PSC exam, found unauthorized patch repairs on discharge pipe of No.2 fire pump and sea water supply pipe to fresh water generator. There is no documentation onboard recording these repairs. No notifications were made to the company regarding the wasted pipes, installation of patches, or who conducted the unauthorized repairs. Furthermore, appropriate parties were not notified due to the lack of the crew’s knowledge of the reporting procedures as required by the vessel’s safety management system.
74 SOLAS(04) I/11 ISM CODE Part A/10
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 13 October 2020
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 9 October 2020
Resolved
The number of openings in watertight subdivisions is to be kept to a minimum compatible with the design and proper working of the ship. A rubber hose, used to supply water from the fresh water generator to the fresh water tank, was found passing through two opened hatch covers that are normally closed for fire and flooding protection. The hose penetrated through two watertight and fire boundaries in the ship. The unauthorized modification poses a risk to safety of the vessel and crew in the event of flooding or fire. Furthermore, appropriate parties were not notified due to the lack of the crew’s knowledge of the reporting procedures as required by the vessel’s safety management system.
74 SOLAS(04) II-1/25.9
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 13 October 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 9 October 2020
Resolved
The company and ship shall comply with the requirements of the International Safety Management Code. Due to the above objective evidence, the Captain of the Port questions the adequacy of the implementation of the vessel’s safety management system under the International Safety Management Code involving the machinery operations, maintenance, and the procedure for reporting/notification to the responsible parties. The U.S. Coast Guard recommends an external audit to the conducted by the flag state or recognized organization to determine whether the ship is properly operating in accordance with ISM. The external audit is required based on the following objective evidence found during the examination: crew’s failure to follow maintenance procedures in accordance with safety management system, a lack of knowledge on reporting requirements for machinery equipment system malfunctions, and crew’s lack of training and familiarization with ship’s safety management system. 74 SOLAS(04) IX/3.1 ISM CODE PART A/10
Action required: 10 - Deficiency Rectified
Resolved 13 October 2020
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 9 October 2020
Resolved
After any survey of the ship under regulation 8 has been completed, no change shall be made in the structural arrangements, machinery, equipment, and other items covered by the surveyed, without the sanction of the administration. During PSC exam, found a flexible rubber water supply hose from the fresh water generator to the fresh water tank. The modification to the system was used due to the wastage of the system’s installed pipe, which had been in disrepair for more than six months. The Master was not aware of the modifications to the fresh water system. Furthermore, appropriate parties were not notified due to the lack of the crew’s knowledge of the reporting procedures as required by the vessel’s safety management system. 74SOLAS(04) I/11
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 October 2020
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 5 October 2020
Resolved
After any survey of the ship under regulation 8 has been completed, no change shall be made in the structural arrangements, machinery, equipment, and other items covered by the surveyed, without the sanction of the administration. During PSC exam, found a flexible rubber water supply hose from the fresh water generator to the fresh water tank. The modification to the system was used due to the wastage of the system’s installed pipe, which had been in disrepair for more than six months. The Master was not aware of the modifications to the fresh water system. Furthermore, appropriate parties were not notified due to the lack of the crew’s knowledge of the reporting procedures as required by the vessel’s safety management system. 74SOLAS(04) I/11
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 13 October 2020
Resolved 13 November 2020