Records from 2020 to 2025. Most recent: inspection, 23 January 2025.
Inspection history · 6
23 January 2025
PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8066789
7 January 2025
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8059214
18 October 2023
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7810721
9 October 2023
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7805554
6 April 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7664074
20 August 2020
PSC A
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7038722
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2025
Resolved
The machinery, boilers and other pressue vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PSCDO received report from vessel that M/E blow down valve was inoperable and thus M/E incapable of starting.
SOLAS 74 (20) II-1 / 26.1
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 7 January 2025
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 6 April 2023
Resolved
"The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations." The vessel was found to have not followed procedures to ensure that the pilot transfer arrangement was safe and effective. An internal safety audit is required within 3 months.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2023
Resolved 21 June 2023
Resolution: Vessel provided pictures and internal audit atesting to the proper operation of the safety pins for pilot boarding arrangement. Attached pictures to documents.
10 - Safety of Navigation › N/A - No Subsystem › Pilot ladders and hoist/pilot transfer arrangements
Issued 6 April 2023
Resolved
"All arrangements used for pilot transfer shall efficiently fulfill their purpose of enabling pilots to embark and disembark safely." The vessel's pilot transfer arrangement was found to have stanchions on the landing platform that were not locked securely in place by safety pins.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 6 April 2023
Resolved 21 June 2023
Resolution: Vessel provided pictures and internal audit atesting to the proper operation of the safety pins for pilot boarding arrangement. Attached pictures to documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 August 2020
Resolved
In addition to the requirements contained elsewhere in the present regulations, ships shall be designed, constructed and maintained in compliance with structural, mechanical, and electrical requirements of a classification society which is recognized by the Administration which provide an equivalent level of safety. The main engine exhaust shied on the #2 and #3 turbo just aft of the heat sensor and before the turbo is missing the clips and is held on with safety wire allowing for heat to escape exposing the heat sensor to excessive heat causing discoloration and thermal breakdown.
74SOLAS(14)11-1/A-1.3-1
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 30 September 2020
Resolved 23 March 2021