Records from 1989 to 2001. Most recent: inspection, 16 November 2001.
Documentation record
Registered dimensions (L × B × D)44.0 ft × 27.0 ft × 6.5 ft
Registered tonnagegross 38 / net 34
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJOHN C. MATTHIESEN · SEATTLE WA, UNITED STATES · built 1978
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portKEWALO, HI
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 7 February 2000 · expires 28 February 2002
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it38 - Regulatory (Subpart C or D), Gross Ton
34 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 29
16 November 2001
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1362215
21 March 2000
COI Inspection · Plan Review "T" Boat
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1365595
29 July 1999
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1107757
13 February 1998
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1422980
7 March 1997
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1364008
3 July 1996
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1367865
16 May 1996
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1353931
15 April 1996
Plan Review "T" Boat
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1081543
7 March 1996
Re-Inspection · Deficiency Check · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1363539
6 March 1996
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 886315
3 January 1996
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1392364
2 November 1995
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1374431
27 September 1995
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1357343
5 May 1995
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1468349
7 April 1995
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 122560
7 April 1995
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1355174
2 March 1995
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1448625
2 November 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 373608
26 May 1994
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1401873
7 April 1994
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1356602
8 October 1993
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1373945
3 March 1993
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 834368
5 May 1992
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 943810
16 March 1992
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 946974
6 March 1991
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 912783
20 November 1990
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 926906
20 September 1990
Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1246179
8 March 1990
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1224774
20 March 1989
Hull Examination · Initial Certification · Plan Review "T" Boat
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1044251
Engineering
Issued 16 May 1996
Resolved
Renew propeller nut.
Condition: Unknown
Due 1 June 1996
Resolved 1 June 1996
Documentation
Issued 16 May 1996
Resolved
Provide evidence of compliance with IFR 46 CFR 183.430, 194.402, 184.506, 185.420, 185.506, 185.520, 185.524, 185.604, 185.604(i), 185.608, 185.614.
Condition: Unknown
Due 16 May 1996
Resolved 16 May 1996
Construction/Loadline
Issued 16 May 1996
Resolved
Make collision bulkhead watertight.
Condition: Unknown
Due 1 June 1996
Resolved 1 June 1996
Construction/Loadline
Issued 16 May 1996
Resolved
Seal anchor line drain holes.
Condition: Unknown
Due 1 June 1996
Resolved 1 June 1996
Engineering
Issued 7 March 1996
Resolved
Secure port aft engine mount.
Condition: Unknown
Due 18 March 1996
Resolved 18 March 1996
Deck/Cargo
Issued 7 March 1996
Resolved
Mouse anchor chain.
Condition: Unknown
Due 18 March 1996
Resolved 18 March 1996
Construction/Loadline
Issued 7 March 1996
Resolved
Prove operation of the fixed bilge system for the center hull.
Condition: Unknown
Due 18 March 1996
Resolved 18 March 1996
Engineering
Issued 7 March 1996
Resolved
Provide metal shield around the remote shut off valve access for the fuel tank remote shut off reach rods.
Condition: Unknown
Due 18 March 1996
Resolved 18 March 1996
Lifesaving
Issued 7 March 1996
Resolved
Mark vessel's name on both buoyant apparatus.
Condition: Unknown
Due 18 March 1996
Resolved 18 March 1996
Engineering
Issued 7 March 1996
Resolved
At next drydock examination, remove both independent fuel tanks for sand blasting and further inspection.
Condition: Unknown
Due 7 March 1996
Resolved 7 March 1996
Documentation
Issued 7 March 1996
Resolved
Provide evidence of supervisor training & proof of a valid drug testing program.
Condition: Unknown
Due 18 March 1996
Resolved 18 March 1996
Engineering
Issued 7 March 1996
Resolved
Remove short section of flexible fuel hose and cross over piping between the two independent fuel tanks running from the bottom of both tanks.
Condition: Unknown
Due 7 March 1996
Resolved 7 March 1996
Fire Fighting
Issued 27 September 1995
Resolved
INSTALL FIRE EXTINGUISHING AND DETECTION SYSTEM IN ACCORDANCE WITH THE APPROVED PLAN. SEE REQUIREMENT NUMBER 8 FOR MI95036421.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Fire Fighting
Issued 27 September 1995
Resolved
PROVIDE VENT CLOSURE FOR ENGINE ROOM VENT DUCTS.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Lifesaving
Issued 27 September 1995
Resolved
PROVIDE FOR PORT AND STARBOARD BUOYANT APPARATUS 18 FOOT WATERLIGHT LANYARDS.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Construction/Loadline
Issued 27 September 1995
Resolved
PROPERLY BOND THROUGH HULL FITTINGS.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Navigation
Issued 27 September 1995
Resolved
RELOCATE NAVIGATION SIDE LIGHTS IN ACCORDANCE WITH NAVRULES.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Fire Fighting
Issued 27 September 1995
Resolved
SUBMIT FOR APPROVAL INSTALLATION PLAN FOR FIRE EXTINGUISHING EQUIVALENCIES FOR NON FIRE RETRADANT RESINS IN ACCORDANCE WITH NVIC 8-87.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Fire Fighting
Issued 27 September 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, PROVIDE 2 B-II FIRE EXTINGUISHERS.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Lifesaving
Issued 27 September 1995
Resolved
MAKE PROPER REPAIRS TO FORWARD PORT SIDE RAILING STANCHION.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Lifesaving
Issued 27 September 1995
Resolved
PRIOR TO CARRYING PASSENGERS FOR HIRE, PROVIDE WATERLIGHT FOR STARBOARD BUOYANT APPARATUS.
Condition: Unknown
Due 27 September 1995
Resolved 27 September 1995
Engineering
Issued 2 March 1995
Resolved
INSTALL NEW STEEL ELBOW IN EXHAUST SYSTEM IN ACCORDANCE WITH 46 CFR 182.15-20(A).
Condition: Unknown
Due 2 March 1995
Resolved 2 March 1995
Engineering
Issued 2 March 1995
Resolved
REPAIR OR RENEW BASE FOR MAIN SHEET WINCH IN ACCORDANCE WITH 46 CFR 176.30-1.
Condition: Unknown
Due 2 March 1995
Resolved 2 March 1995
Electrical
Issued 2 March 1995
Resolved
MAKE RADIO ELECTRICAL CIRCUITS IN ACCORDANCE WITH 46 CFR 183.05-25.
Condition: Unknown
Due 2 March 1995
Resolved 2 March 1995
Construction/Loadline
Issued 2 March 1995
Resolved
INSTALL STRAINER ON AFT SUCTION BILGE LINE IN ACCORDANCE WITH 46 CFR 182.25-5(B).
Condition: Unknown
Due 2 March 1995
Resolved 2 March 1995
Engineering
Issued 2 March 1995
Resolved
REPAIR OR RENEW BOOM, CRACKED IN WAY OF MAIN SHEET, IN ACCORDANCE WITH 46 CFR 176.30-1.
Condition: Unknown
Due 2 March 1995
Resolved 2 March 1995
Construction/Loadline
Issued 16 March 1992
Resolved
MAKE PERMANENT REPAIRS TO THE PORT BOW, OUTBOARD SIDE SHELL AT THE NEXT DRYDOCK.
Condition: Unknown
Due 16 March 1992
Resolved 16 March 1992
Fire Fighting
Issued 8 March 1990
Resolved
PROVIDE PROOF OF SERVICING OF FIXED HALON SYSTEM IN ENGINEROOM. PROVIDE MEANS OF CLOSURE FOR ENGINEROOM VENTILATION FROM OUTSIDE THE SPACE. PROVIDEAUTOMATIC ENGINE SHUTDOWN AND AUDIBLE AND VISUAL INDICATOR VISUAL FROM STEERING STATION.
Condition: Unknown
Due 8 March 1990
Resolved 8 March 1990
Engineering
Issued 8 March 1990
Resolved
PROPERLY GROUND THROUGH DECK FUEL FILL FITTING TO FUEL TANK.
Condition: Unknown
Due 8 March 1990
Resolved 8 March 1990
Documentation
Issued 8 March 1990
Resolved
PROVIDE ONBOARD VESSELS' ORIGINAL STABILITY LETTER.
Condition: Unknown
Due 8 March 1990
Resolved 8 March 1990