Records from 2020 to 2025. Most recent: inspection, 25 June 2025.
Documentation record
Registered dimensions (L × B × D)34.3 ft × 10.5 ft × 6.0 ft
Registered tonnagegross 14 / net 11
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCOMMERCIAL WATER SPORTS INC · CAPE MAY COURT HOUSE, NJ, UNITED STATES · built 2020
Hull materialFRP (Fiberglass)
PropulsionDiesel Direct
Hull shapeShip
Hull configurationMonohull
Hailing portSEA ISLE CITY, NJ
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 22 September 2020
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it14 - Simplified, Gross Ton
11 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 5
25 June 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8167344
7 June 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7706210
23 May 2023
Internal Structural Exam · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7694632
8 June 2022
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7470072
17 August 2020
Internal Structural Exam · Plan Review "T" Boat · Drydock Exam · Initial Certification · Deficiency Check · Construction Oversight · Administrative Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7042357
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 7 June 2023
Resolved
The owner, managing operator, or a qualified servicing facility as applicable must conduct the following inspections & tests: (1) Portable...extinguishers must be inspected & maintained IAW NFPA 10. The portable fire extinguisher by the operating station was not serviced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2023
Resolved 11 June 2023
Resolution: Vsl POC sent satisfactory picture of identified extinguisher with proper servicing tag.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 June 2023
Resolved
A hatch exposed to the weather must be watertight, except that the follwoing hatches may be weathertight: (2) A hatch in a cabin top. The gasket for space #3 was peeling from hatch lid.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2023
Resolved 11 June 2023
Resolution: Vsl POC sent satisfactory picture of gasket.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 June 2023
Resolved
Each ring life buoy on a vessel must: be stowed in a way that it can be rapidly cast loose. The ring life buoy was not able to be deployed quickly since it was secured with two bungee cords.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2023
Resolved 12 June 2023
Resolution: Vsl sent satisfactory picture of new securing arrangement.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 June 2023
Resolved
Each floating waterlight insatlled after March 11, 1997, on a vessel carrying only one ring buoy, must be attached to the lanyard with a corrosion resistant clip. Vessel's waterlight was not attached to the ring life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 June 2023
Resolved 11 June 2023
Resolution: Vsl sent satisfactory picture of waterlight attached to ring lifebuoy.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 8 June 2022
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. The vessels Certificate of Documentation was expired, master was able to provide proof that the COD was mailed from NVDC and issued 07JUN2022.
Action required: 10 - Deficiency Rectified
Due 8 June 2022
Resolved 14 June 2022
Resolution: Master was able to provide proof that the COD was mailed from NVDC and issued 07JUN2022 and produced verification of new COD on 14 Jun 2022.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 8 June 2022
Resolved
A pre-engineered fixed gas fire extinguishing system must automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. Engine failed to shutdown while testing the installed Fire Boy, attempted multiple times, same result. Make effective repairs to the satisfaction of the attending Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 June 2022
Resolved 10 June 2022
Resolution: O/O provide video evidence that the pre engineering system was functioning properly, sat.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 18 June 2021
Resolved
Submit design verification test procedures to Marine Safety Center for approval and OCMI for verification. - 46 CFR 184.620 (a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 July 2021
Resolved 15 September 2021
Resolution: Vessel's electrical schematic, QFA and DVTP test procedure have been approved by MSC. Added approval letter to vessel documents.