EPIC ST. GEORGE is a 2007 tank ship. The Coast Guard has recorded 4 inspections since 2021, most recently in February 2022, along with 4 deficiencies and 1 operational control.
Records from 2021 to 2022. Most recent: inspection, 9 February 2022.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it4484 - Convention (Subpart B), Gross Ton 1346 - Convention (Subpart B), Net Ton 4999 - Dead Weight, Metric Ton 7842 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page
4 inspections, each with its date, unit and type; 4 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; the documentation record, as PSIX holds it. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
PlansSign in
Maury does not score, rate or grade vessels, at any price.
Vessel history report
A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.
Inspection history · 4
9 February 2022Ballast Water Examination · COC-GAS Annual · PSC B
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7389375
9 February 2022Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7397029
12 February 2021PSC B
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7139769
3 February 2021ISM Exam · COC-GAS Renew · PSC A
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7130741
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 3 February 2021Resolved
Ships carrying flammable or toxic products or both, a water spray system for cooling, fire prevention and crew protection should be installed to cover: exposed cargo tank domes, cargo liquid and vapor discharge and loading manifolds and the boundaries of superstructures and deck houses normally manned, cargo compressor rooms, cargo pump rooms, store room containing high fire risk items and cargo control rooms, all facing the cargo area. PSCOs observed inadequate coverage due to at least 10 clogged deck water spray nozzles between the port and starboard sides of the vessel over cargo tanks #1 and #2 as well as the cargo compressor room. Over the cargo manifolds on either side of the vessel, coverage was observed to be 0% due to clogged nozzles.
74SOLAS(14) VII/13.1; IGC 1993 11.3.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 4 February 2021
Resolution: Received report from class (NKK) attesting to satisfactory repairs and testing of the deck water spray system.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 February 2021Resolved
The condition of the ship and its equipment should be maintained to conform with the provisions of the code to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons on board. PSCOs identified two cargo gas leaks; one located on the field test valve for the #1 cargo tank forward safety relief valve (611330A), and one located on the field test valve for the #2 cargo tank forward safety relief valve (611330C).
74SOLAS(14) VII/13.1; 1993 IGC 1.5.3.1
Condition: Improper Installation
Action required: 30 - Ship detained
Resolved 4 February 2021
Resolution: Received report from class (NKK) attesting to satisfactory repairs and leak test of the cargo tank safety relief valves.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 February 2021Resolved
All gasketed pipe joints and hose connections should be electrically bonded. Bonding straps throughout the cargo deck were found broken, wasted, and generally not connected to kee the piping electrically continuous.
74SOLAS(14) VII/13.1; IGC 1993 5.2.1.4
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 4 February 2021
Resolution: Received report from class (NKK) attesting to satisfactory repairs/replacement of bonding straps.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 3 February 2021Resolved
The company should establish procedures to ensure that the ship is maintained in accordance with the provisions of the relevant rules and regulations established by the company. Due to the objective evidence in listed deficiencies, the vessel is not in substantial compliance with relevant conventions, calling into question the adequacy and implementation of the vessel's SMS under the ISM Code. Further, as per the vessel's SMS Gas Carrier Manual Chp 4.8; Danger of ignition by static electricity is reduced is the system is correctly bonded. SMS work order ID 835-0; Check that all cargo pipelines are electrically continuous, in good order. Work order stated routine inspection was completed and the order was closed on 23JAN21. As per the vessel's SMS Gas Carrier Manual Chp 4.9; firefighting appliance shall be kept in good order and tested regularly and be available for immediate use at all times the water spray should be set to protect the manifold and should be tested. SMS deck spray system and tank cooling spray monthly test record has a log entry dated 30JAN21; tested all nozzles checked, no sign of clog, in good order. This is directly contradicted by the condition of the systems observed by the attending PSCOs. An external audit conducted by the Flag or RO is required within 30 days to determine whether the ship is operating in accordance with the ISM Code. Provide a copy of the completed audit report to USCG prior to departure from port.
74SOLAS(14) IX/3.1; ISM CODE 10.1
Condition: Invalid
Action required: 30 - Ship detained
Resolved 7 February 2021
Resolution: Received audit report from class (NKK) detailing the findings of the audit, and a timeline for the Corrective Action Plan to be completed.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.