GAIL BHUWAN is a 2021 tank ship. The Coast Guard has recorded 10 inspections since 2021, most recently in April 2026, along with 4 deficiencies and 2 operational controls.

Records from 2021 to 2026. Most recent: inspection, 16 April 2026.

Built
2021
Last inspected
16 April 2026
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9877145 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
1654633
Flag
CYPRUS
—
Maury page id
psix-1654633

Inspections, by type

…with no type recorded2
Years with a record 6 calendar years (2021–2026)
The 10 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it119891 - Regulatory (Subpart C or D), Gross Ton
135860 - Displacement, Ton
35967 - Regulatory (Subpart C or D), Net Ton
119891 - Convention (Subpart B), Gross Ton
35967 - Convention (Subpart B), Net Ton
98881 - Dead Weight, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 10

16 April 2026 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8350656
19 February 2026 Deficiency Check · PSC B · COC-GAS Annual
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8312277
3 July 2025 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8174153
2 March 2025 PSC B · COC-GAS Renew
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8086962
1 July 2024 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 7946833
29 February 2024 COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7865972
7 March 2023 COC-GAS Renew · PSC B
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7646344
25 February 2022 PSC B · COC-GAS Annual
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7401827
10 September 2021 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7309237
20 March 2021 PSC A · COC-GAS Renew
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7159620

Deficiency record · 4

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 19 February 2026 Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. The technical and or operational nature of deficiencies 2, 3, and 4 provide objective evidence of a serious failure of the implementation of the ISM Code. An internal audit report satisfactory to the OCMI must be submitted prior to clearance of this deficiency. 74SOLAS(20) IX/3.1 ISM Code 10.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 March 2026
Resolved 15 April 2026
14 - Pollution Prevention › 146 - MARPOL Annex VI › Diesel engine relating to air pollution control
Issued 19 February 2026 Resolved
The administration of a party may allow any fitting, material, appliances, or apparatus to be fitted in a ship if arrangement is at least equivalent to the emissions reduction of MARPOL ANNEX VI. The SCR installed on-board is not functioning as designed. MARPOL(22) VI/10
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2026
Resolution: Class report and tech report received and accepted.
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 19 February 2026 Resolved
Gas detectors shall be fitted in these spaces, particularly where air circulation is reduced. The gas detection system shall comply with the requirements of chapter 13. PSCO observed 01 fault on the gas detection cabinet in zone 17 ventilation inlet double fuel gas pipe sensor in ER for GE #3. 74SOLAS(20) VIII/13.1 IGC (16)/16.3.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2026
Resolution: Class report received and accepted.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 19 February 2026 Resolved
The equipment shall be maintained to conform with the provisions of this Annex and no changes shall be made in the equipment, systems, fittings, arrangements, or material covered by the survey, without the express approval of the Administration. PSCO observed incinerator missing a large piece of refractory on the door. MARPOL(22) VI/5.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 February 2026
Resolution: Class report received and accepted.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.