MAURY USCG vessel records Sign in
← All vessels

KORI BELL

KORI BELL is a 1978 offshore supply vessel. The Coast Guard has recorded 30 inspections since 1989, most recently in July 2026, along with 99 deficiencies and 1 casualty investigation in 2005.

Records from 1989 to 2026. Most recent: inspection, 15 July 2026.

Built
1978
Last inspected
15 July 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDE6851
165517
Flag
UNITED STATES
367385730
Maury page id
psix-165517

Inspections, by type

…with no type recorded4
Years with a record 22 calendar years (1989–2026)
The 30 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Registered dimensions (L × B × D)63.2 ft × 24.1 ft × 4.8 ft
Registered tonnagegross 75 / net 51
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSUPERIOR LIFT BOATS INC · LAFAYETTE, LA, UNITED STATES · built 1978
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portBAYTOWN, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 July 2026 · expires 31 August 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it75 - Regulatory (Subpart C or D), Gross Ton
51 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDE6851MMSI 367385730 · active · compulsorily equipped · granted 3 October 2018, expires 25 November 2028
WCY8969MMSI not assigned · expired · compulsorily equipped · granted 23 February 1999, cancelled 25 April 2009 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 5

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

CHRISTOPHER Commercial Fishing Vessel · MISLE 404959 · 12 December 2005 · activity 2551519GULF WHALE Commercial Fishing Vessel · MISLE 423270 · 12 December 2005 · activity 2551519SAN RAFAEL Towing Vessel · MISLE 439036 · 12 December 2005 · activity 2551519BUFFALO 414 Tank Barge · MISLE 733500 · 12 December 2005 · activity 2551519BUFFALO 412 Tank Barge · MISLE 733501 · 12 December 2005 · activity 2551519

Inspection history · 30

15 July 2026 Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8438958
3 April 2025 Drydock Exam · Internal Structural Exam · Annual Inspection · Examination of Repairs · Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8104780
16 July 2024 Deficiency Check · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7959591
16 September 2021 Deficiency Check · COI Inspection · Drydock Exam · Administrative Inspection · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7313430
29 September 2020 Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7067992
29 October 2019 Examination of Repairs · COI Inspection · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6844854
26 April 2019 Examination of Repairs
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6672664
12 September 2018 Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6538829
7 June 2017 Annual Inspection · MTSA Verification · DAPI Audit · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6168704
3 June 2016 Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5896628
7 January 2016 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5921655
17 July 2015 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5187349
17 June 2014 Drydock Exam · Internal Structural Exam · COI Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4891045
6 January 2011 Periodic Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3922611
18 February 2009 Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3419716
12 January 2009 Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3392590
14 October 2007 Examination of Repairs · COI Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3079715
13 October 2006 Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2815280
12 December 2005 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2551519
6 December 2005 COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2546293
29 June 2004 Administrative Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2115202
8 June 2004 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2091967
6 April 2004 Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2038212
12 March 2004 Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2029155
3 April 2002 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1601269
16 February 2000 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 815664
30 November 1994 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1177326
8 April 1991 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 924368
24 January 1991 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 917074
6 December 1989 Initial Certification · Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1231823

Deficiency record · 99

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 June 2025 Resolved
The fixed power bilge pump shall be self-priming and may be driven off the main engine or other source of power. It shall be permanently connected to the bilge main and may also be connected to the fire main. If of sufficient capacity the power bilge pump may also serve as a fire pump. Bilge pump unable to self-prime. Affect satisfactory repairs/replacement of bilge pump to produce self-priming capabilities. No vessel movement until witnessed by USCG Inspectors and satisfactory underway drills are conducted.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 7 July 2025
Resolution: Self-priming pump replaced.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 June 2025 Resolved
All hand portable fire extinguishers and semi-portable fire extinguishing systems shall be checked as noted in Table 176.25-25(a). MIs observed expired portable extinguisher inspection in accommodation space near galley. Conduct required inspection of portable fire extinguisher. 46 CFR 176.25-25 16 c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2025
Resolved 7 July 2025
Resolution: Updated inspection completed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 June 2025 Resolved
The minimum number of portable fire extinguishers required on each vessel shall be as determined by the Officer in Charge, Marine Inspection, in accordance with Table 181.30-1(a) and other provisions of this subpart. MIs observed missing fire extinguisher in accommodation space. Provide appropriate fire extinguisher.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2025
Resolved 7 July 2025
Resolution: Missing fire extinguisher replaced.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 26 June 2025 Resolved
A vessel must comply with the applicable requirements for any radio...installations, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission. MIs observed FCC Radiotelephony Certificate displaying previous vessel name of "Oppertunity". Update documentation to reflect current name of vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 July 2025
Resolved 10 July 2025
Resolution: Radiotelephony certificate received.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 16 July 2024 Resolved
A suitable rescue boat shall be required except when, in the opinion of the Officer in Charge, Marine Inspection, the vessel is of such design and operating characteristics that the vessel itself provides a fully satisfactory rescue platform. Rescue boat engine was not installed on boat. 46 CFR 180.10-35
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2024
Resolution: New outboard engine installed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 16 July 2024 Resolved
Each life float and buoyant apparatus must be secured to the vessel by a painter and a float-free link. Life float was connected to stbd rail with zip ties. 46 CFR 180.20-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2024
Resolution: New lif float properly installed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 16 July 2024 Resolved
Each life float shall be fitted with a life line and shall be equipped with two paddles, a water light and a painter. Life float was missing all required equipment. 46 CFR 180.15-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2024
Resolution: Life float outfitted with required equipment.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 16 July 2024 Resolved
All vessels shall be provided with an approved adult type life preserver for each person carried. Vessel is short 01 lifejacket. 46 CFR 180.25-5
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2024
Resolution: New lifjacket on board.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 July 2024 Resolved
All vessels shall be provided with bilge pumps in accordance with Table 182.25-10(a). Vessels main bilge pump is inoperable. 46 CFR 182.25-10
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 July 2024
Resolution: Installed bilge system operational.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 16 July 2024 Resolved
All vessels shall be provided with not less than two avenues of escape from all general areas accessible to the passengers or where the crew may be quartered. Emergency exit in crew berthing was seized shut. 46 CFR 177.15-1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 July 2024
Resolution: Emergency exit repaired and in good working order.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 16 July 2024 Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: A space with a through-hull fitting below the deepest load waterline. Vessels bilge alarms were inoperable. 46 CFR 182.530(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2024
Resolution: Bilge alarms working properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 July 2024 Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. Hydraulic lifting system was low on oil/ Level Alarm on bridge is inoperable. Repair replace to satisfaction of CG Marine Inspector. 46 CFR 182.10-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2024
Resolution: Hydrolic tank topped off and Level alarm working properly.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 16 July 2024 Resolved
A vessel at anchor shall exhibit where it can best be seen:(i) In the fore part, an all-round white light or one ball;(ii) At or near the stern and at a lower level than the light prescribed in paragraph (i) of this Rule, an all-round white light. All-round white light was inoperable. Repair prior to anchoring between sunset and sunrise. 33 CFR 83.30(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 July 2024
Resolution: Light working properly.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 July 2024 Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Dead end wires forward of pilot house. 46 CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 July 2024
Resolution: Dead end wires removed.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 16 July 2024 Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. Missing guard on port side shaft. 46 CFR 177.35-15
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 July 2024
Resolution: Safety guard installed on port shaft.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 July 2024 Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. In addition. Multiple lights in machinery space were inoperable. 46 CFR 183.10-20
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 19 July 2024
Resolution: All lights in machinery space working properly.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 16 September 2021 Resolved
Service use of distress signals shall be limited to a period of 3 years. Distress signals were expired.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Provided new flares
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 16 September 2021 Resolved
As appropriate for the intended voyage, all vessels must carry adequate and up to date charts, sailing directions, coast pilots, light lists, and tide tables. There were no current charts or pubs onboard.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Provided new charts
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 September 2021 Resolved
Battery terminals shall be of the soldered type. Spring clips or other temporary type clamps are not permitted. Alligator clips were connected from a battery charger to the marine batteries.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Removed battery charger
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 16 September 2021 Resolved
Penetrations and openings in watertight bulkheads must have means to make them watertight. Bunk room #2 watertight hatch is unable to be sealed.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Adjusted hatch
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 16 September 2021 Resolved
Each hatch exposed to the weather must be watertight. The hatch above the port MDE is unable to be sealed properly.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Adjusted hatch
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 September 2021 Resolved
All electrical installations shall be to the satisfaction of the OCMI. The dual generator interlock on the switchboard is inoperable and doesn't prevent inadvertent parallel of generators.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Replaced breaker with a longer switch
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 16 September 2021 Resolved
The power fire pump shall be selfpriming and of such size as to discharge an effective stream. The submersible fire pump provided while jacked up is inoperable.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Provided new sub pump
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 September 2021 Resolved
Nothing in this part shall be construed as limiting the Marine Inspector from making such tests or inspection as are reasonable and practicable to be assured of the seaworthiness of the vessel. The vessel leveling alarm did not sound when vessel was out of level.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Corrected the level alarm timing
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 16 September 2021 Resolved
When fire extinguishing systems or equipment are installed but not required, the installation shall meet the requirements of 46CFR181. Smoke detectors in the galley and first bunk room were not operational
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 September 2021
Resolution: Replaced batteries in detectors
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 16 September 2021 Resolved
Bolt down and secure fresh water pump
Due 31 January 2023
Resolved 7 February 2023
Resolution: Pump secured.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 16 September 2021 Resolved
Shutoff valves installed so as to close against the fuel flow,shall be fitted in the fuel supply lines. The shutoff valve at the tank shall be operable from outside the tank compartment, preferably from an accessible position on the weather deck. Marine inspector observed no remote fuel shutoff for fuel tank. Install remote fuel shutoff for fuel tank. 46 CFR 182.20-40(b)(3) 17 C
Action required: 17 - Rectify deficiencies prior to departure
Due 31 January 2023
Resolved 7 February 2023
Resolution: Remote fuel shutoff valve installed.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 16 September 2021 Resolved
During an initial inspection for certification the owner or managing operator shall conduct all tests and make the vessel available for all applicable inspections discussed in this paragraph, and in Subpart H of this part, to the satisfaction of the cognizant OCMI, including the following: Tests of each rescue boat and each rescue boat launching appliance. Marine inspector observed rescue boat inoperable. Repair rescue boat to full operational condition to the satisfaction of a US Coast Guard Marine Inspector. 46 CFR 176.808 17 C
Action required: 17 - Rectify deficiencies prior to departure
Due 31 January 2023
Resolved 7 February 2023
Resolution: Rescue boat repaired.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 16 September 2021 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment other than small buoyancy compartments under all practical conditions. Marine Inspector discovered missing control handles on emergency bilge suction lines located in engine room. Repair/replace control handles on emergency bilge suction lines. 46 CFR 182.25-1 17 C
Action required: 17 - Rectify deficiencies prior to departure
Due 31 January 2023
Resolved 7 February 2023
Resolution: New handles installed on bilge suction lines.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2020 Resolved
If a grounded distribution system is provided, there must be only one connection to ground regardless of the number of power sources. Determine type of distribution system and properly ground and provide required ground detection.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 29 September 2020
Resolution: Ground detection added.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2020 Resolved
ammeter, which can be used for measuring voltage and current of a generator that is in operation, must be provided for a generator rated at 50 volts or more. Vessel did not have Ammeters for measuring amperage for either generator on the switchboard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 30 September 2020
Resolution: Ammeter installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 June 2020 Resolved
Each switchboard must be fitted with a drip shield. - Vessel switchboard not equipped with drip shield.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 29 September 2020
Resolution: Drip shield fitted.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 15 June 2020 Resolved
Except on a vessel limited to daytime operations, the compass must be illuminated. - Compass light inoperable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 29 September 2020
Resolution: Compass light works.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 June 2020 Resolved
Vessel's hand rail system only had 02 rails that were more than 12 inches apart. Correct deficiency at next dry dock.
Action required: 705 - Other - as specified
Due 15 July 2020
Resolved 7 July 2025
Resolution: Cleared with satisfactory DD inspection.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 15 June 2020 Resolved
Vessel is a OSV Lift boat restricted in maneuverability. Provide a means to recover personnel from the water while in the raised configuration, as well as when in the lowered configuration. Current rescue boat cannot be raised with persons onboard due to crane and winch not being rated for personnel. Develop alternate means of recovering persons overboard or certify winch is rated for use to hoist personnel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2020
Resolved 29 September 2020
Resolution: Crane was certified by International Cargo Gear Bureau
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 17 September 2018 Resolved
Materials and/or personnel handling equipment systems, i.e. cranes, hydraulic elevators, etc., not approved by the Commandant as fail-safe as defined in paragraph (a)(2) of this section. Vessel controls for the leg operations was not a fail-safe design.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2018
Resolution: Tested leg operation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 September 2018 Resolved
Each ring life buoy on a vessel must be approved in accordance with 160.050 in subchapter Q. Starboard life buoy plug was dry rotted.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2018
Resolution: Replaced in kind.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 12 September 2018 Resolved
An existing vessel must comply with the subdivision, damage stability, and watertight integrity regulations which were applicable to the on March 10, 1996, or, as an alternative, the vessel may comply with the regulations in this part. Starboard watertight door frame for the crew accommodations was severely deteriorated. Also, a deck plug on the port side near the house was wasted away.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 September 2018
Resolution: Cropped and renewed.
Deck/Cargo › Cargo Stowage › General
Issued 3 June 2016 Resolved
The forward leg didn't operate. Demonstrate proper operation of the forward lift leg.
Action required: 705 - Other - as specified
Due 25 August 2016
Resolved 16 August 2016
Resolution: Cleared by technician's report.
Engineering › Fuel Oil Service System › Valve
Issued 17 July 2015 Resolved
Demonstrate proper operation of the remote fuel shut off valve.
Action required: 705 - Other - as specified
Resolved 7 August 2015
Resolution: Properly tested remote fuel shut off valve.
Operations/Management › Drills/Instruction › Not Conducted
Issued 17 July 2015 Resolved
Demonstrate satisfactory emergency drills with proper crew.
Action required: 705 - Other - as specified
Resolved 7 August 2015
Resolution: Conducted satisfactory Fire and Abandon Ship Drills with master and crew.
Stability › Weathertight Integrity › General
Issued 17 July 2015 Resolved
Repair/replace knife edge and door to accommodation entrance. Door is missing dog and knife edge is wasted.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Dogs on watertight door were replaced and knife edge was replaced.
Communications › Radio Communications › VHF Radiotelephone
Issued 17 July 2015 Resolved
Provide FCC Radio Operator's Permit.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Received proof of Radio Operator''s Permit.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 17 July 2015 Resolved
Demonstrate proper operation of the port bilge high level alarm.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Port bilge alarm properly tested.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 17 July 2015 Resolved
Provide lifejacket donning placard near lifejacket stowage.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Lifejacket donning placard present.
Operations/Management › Casualty Reporting/Post-Casualty Actions › Determination of Alcohol/Drug Use
Issued 17 July 2015 Resolved
Provide alcohol testing strips.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Valid alcohol testing strips provided.
Navigation › Piloting/Steering › Marine Charts
Issued 17 July 2015 Resolved
Provide current navigation charts.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Current navigation charts provided.
Stability › Weathertight Integrity › General
Issued 17 July 2015 Resolved
Replace broken window on deck.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Broken window on deck was replaced.
Electrical › Electrical Distribution System (service) › Wiring
Issued 17 July 2015 Resolved
Remove extension cords throughout accommodation space.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Extension cords were removed from accommodation space.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 17 July 2015 Resolved
Provide aspirin for the First Aid Kit.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Valid First Aid kit provided.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 July 2015 Resolved
Repair railing where broken in two places on starboard side.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Broken railing was replaced on the starboard side of the deck.
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 17 July 2015 Resolved
Provide non conductive mat in front of switchboard.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Non conductive mat was provided.
Electrical › Electrical Distribution System (service) › Switch
Issued 17 July 2015 Resolved
Provide proper cover for open pump switch.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Pump switch was properly covered.
Deck/Cargo › Cargo Stowage › General
Issued 17 July 2015 Resolved
Provide crane angle indicator.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Crane angle indicator provided.
Lifesaving › Lifebuoys › Serviceable
Issued 17 July 2015 Resolved
Provide new life ring for starboard side, plug was missing.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Vessel provided new life ring.
Engineering › Freshwater System (jacketwater cooling) › Storage Tank
Issued 17 July 2015 Resolved
Demonstate proper operation of the port propulsion engine generator and cooling fan (radiator leaking).
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Radiator replaced and properly operating.
Construction/Loadline › Penetrations › Pipe Flange
Issued 17 July 2015 Resolved
Properly repack deck penetrations, three behind engine room hatch, one by the crane.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: Deck penetrations sealed.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 17 July 2015 Resolved
Provide not under command lights.
Action required: 705 - Other - as specified
Due 17 August 2015
Resolved 7 August 2015
Resolution: All navigation lights properly operating.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 21 January 2009 Resolved
Repair the rudder angle indicator,
Action required: 705 - Other - as specified
Due 21 February 2009
Resolved 18 February 2009
Resolution: Received a video of the repaired rudder angle indicator in operation.
Documentation › Certificates/Documents › Stability Letter
Issued 12 January 2009 Resolved
Provide the stability letter and approved Operating Plan.
Due 21 February 2009
Resolved 18 February 2009
Resolution: Received a copy of the original Stability Letter.
Construction/Loadline › Structures › Trunk
Issued 12 January 2009 Resolved
Make a proposel to meet the jacking failure alarm requiremefnt in NAVIC 8-91.
Action required: 705 - Other - as specified
Due 21 February 2009
Resolved 18 February 2009
Resolution: Discussed the jacking gear failure alarm issue with Nagle Marine Services and cleared the deficiency based on guidance contained in CG-543 Policy Ltr 07-02.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 14 October 2007 Resolved
Navigation lights need to be hard wired.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 2 November 2007
Navigation › Piloting/Steering › Marine Charts
Issued 14 October 2007 Resolved
Provide updated charts and publications.
Action required: 705 - Other - as specified
Resolved 2 November 2007
Lifesaving › Rescue Boat › Carriage Requirement
Issued 14 October 2007 Resolved
Rescue boats needs to be installed on the launching deck instead of the flying bridge. Also needs paddles.
Action required: 705 - Other - as specified
Due 15 November 2007
Resolved 2 November 2007
Resolution: Installed new launching davit and rescue boat cradle.
Fire Fighting › Ventilation Systems › Operating Controls
Issued 14 October 2007 Resolved
Change configuration of fire dampers so that they can be easily closed in case of fire emergency.
Action required: 705 - Other - as specified
Resolved 2 November 2007
Accommodation/Occupational Safety › Cooking Systems › CNG System Requirements
Issued 14 October 2007 Resolved
Water tight door to galley has right lower dog, fix or replace.
Action required: 705 - Other - as specified
Resolved 2 November 2007
Accommodation/Occupational Safety › Heating › Burners
Issued 14 October 2007 Resolved
Install sea rails on stove to prevent from accidental spill.
Action required: 705 - Other - as specified
Resolved 2 November 2007
Accommodation/Occupational Safety › Messroom › Location
Issued 14 October 2007 Resolved
Secure fridge from sliding or tilting.
Action required: 705 - Other - as specified
Resolved 2 November 2007
Fire Fighting › Firemans Outfit › Axe
Issued 14 October 2007 Resolved
Fire axe must display name of the vessel.
Action required: 705 - Other - as specified
Resolved 2 November 2007
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 14 October 2007 Resolved
Smoke detectors must be replaced or fixed.
Action required: 705 - Other - as specified
Due 15 November 2007
Resolved 2 November 2007
Accommodation/Occupational Safety › Messroom › Location
Issued 14 October 2007 Resolved
Drawers and spaces containing cooking equipment must have latches to prevent from accidental opening.
Action required: 705 - Other - as specified
Resolved 2 November 2007
Engineering › Generator (propulsion-electric) › Generator Voltage Regulator Circuitry
Issued 14 October 2007 Resolved
Repair or replace generator sets.
Action required: 705 - Other - as specified
Resolved 2 November 2007
Resolution: Replaced both gen sets.
Operations/Management › Drills/Instruction › Activating General Alarm
Issued 14 October 2007 Resolved
Install general alarm IAW 46 CFR 183.540
Action required: 705 - Other - as specified
Due 15 November 2007
Resolved 2 November 2007
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 13 October 2006 Resolved
Replace cutlass bearing on starboard shaft prior to 11/24/06 to the satisfaction of attending marine inspection.
Action required: 705 - Other - as specified
Due 24 November 2006
Resolved 24 October 2006
Documentation › Certificates/Documents › Certificate of Inspection
Issued 29 June 2004 Resolved
Vessel is prohibited from operating until satisfactory completion of credit drydock exam
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 October 2004
Resolution: Completed credit drydock.
Documentation › Logs/Records
Issued 6 April 2004 Resolved
Provide random drug test program. LEGACY COMPONENT DESC: Drug Test Records
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 May 2004
Resolved 8 June 2004
Resolution: Drug test program provided.
Documentation › Logs/Records › Logbook (official)
Issued 6 April 2004 Resolved
Provide CPR certification for 50% of the crew.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 May 2004
Resolved 5 October 2004
Resolution: Copy of CPR certification provided.
Engineering
Issued 22 March 2004 Resolved
Repair sewage vent piping on the main deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted repair check on the sewage piping, all sat.
Lifesaving › Hand Flares
Issued 22 March 2004 Resolved
Provide up to date signaling device. LEGACY COMPONENT DESC: Condition
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted def check on the signaling device, all sat.
Accommodation/Occupational Safety
Issued 22 March 2004 Resolved
Make operational smoke detectors in the crew accomodation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted def check on the smoke detector, all sat.
Engineering › Generator (propulsion/auxiliary-electric)
Issued 22 March 2004 Resolved
Repair wire IWO the No 1 and No2 generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted repair check of the generator''s wire mount, all sat.
Documentation › Certificates/Documents
Issued 22 March 2004 Resolved
Post COI and STBL letter.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted def check, all sat.
Documentation › Logs/Records
Issued 22 March 2004 Resolved
Provide records of fire, abondon ship and man overboard drill. LEGACY COMPONENT DESC: Logbook/Record (unofficial)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 June 2004
Resolved 8 June 2004
Resolution: Record provided by master.
Lifesaving
Issued 22 March 2004 Resolved
Install life float weak link and provide paddles.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted def check, all sat.
Electrical › Electric Supply System (service)
Issued 22 March 2004 Resolved
Install blanks in the electrical pannel located in the crew accomodation head.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted def check on the electrical pannel, all sat.
Lifesaving › Buoyant Apparatus
Issued 22 March 2004 Resolved
Install retro tape on ring bouys and install one strobe light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted def check on the ring bouys, all sat.
Electrical
Issued 22 March 2004 Resolved
Secure lose and open ended wire under the control pannel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted def check on the wire under the control pannel, all sat.
Engineering
Issued 22 March 2004 Resolved
Provide flame screen on the gose neck vents on port and STBD main deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted repair check of the vent flame screen, all sat.
Electrical › Electric Supply System (service) › Cable
Issued 22 March 2004 Resolved
Secure lose wiring IWO the engine room. LEGACY COMPONENT DESC: Cable
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2004
Resolved 5 October 2004
Resolution: Wiring secured.
Engineering
Issued 22 March 2004 Resolved
Provide 3rd party load test of the crane.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Examined the crane load test document, all sat.
Engineering › Bilge Water Management System
Issued 22 March 2004 Resolved
Repair bilge alarm.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted repair check, all sat.
Engineering
Issued 22 March 2004 Resolved
Repair STBD rudder packing flange.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted repair check, all sat.
Engineering
Issued 22 March 2004 Resolved
Repair rudder packing on the port side.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2004
Resolved 5 May 2004
Resolution: Conducted repair check of the rudder packing, all sat.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 22 March 2004 Resolved
Repair oil leak in location of the port shaft rudder.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2004
Resolved 5 October 2004
Resolution: Leak repaired.
Construction/Loadline › Hull › Longitudinal Frame
Issued 22 March 2004 Resolved
Repair internal members IWO the stern compartment.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2005
Resolved 5 October 2004
Resolution: Frames renewed.
Unknown
Issued 6 December 1989 Resolved
SUBMIT AN OPERATING MANUAL MEETING THE APPLICABLE SECTIONS OF 46 CFR 109.121 TO [name withheld] FOR APPROVAL.
Condition: Unknown
Due 6 December 1989
Resolved 6 December 1989
Unknown
Issued 6 December 1989 Resolved
SUBMIT STRUCTUAL, PIPING, ELECTRICAL PLANS AND STABILITY INFORMATION TO MARINE SAFETY OFFICE MORGAN CITY FOR REVIEW IAW 46 CFR 170.90 AND 177.05.1.
Condition: Unknown
Due 6 December 1989
Resolved 6 December 1989
Lifesaving
Issued 6 December 1989 Resolved
INSTALL A SUITABLE MEANS OF ESCAPE.
Condition: Unknown
Due 6 December 1989
Resolved 6 December 1989
Unknown
Issued 6 December 1989 Resolved
MAKE PLANETARY GEARS ON JACKING GEARS AVAILABLE FOR INSPECTION BY A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 6 December 1989
Resolved 6 December 1989

Casualty record · 1

12 December 2005Routine · role: Involved in a Marine Casualty · activity 2551519
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

THE OPPORTUNITY (2005). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.