← All vessels
PERTAMINA GAS 1
PERTAMINA GAS 1 is a 2013 tank ship. The Coast Guard has recorded 5 inspections since 2021, most recently in July 2025, along with 6 deficiencies.
Records from 2021 to 2025. Most recent: inspection, 25 July 2025.
- Built
- 2013
- Last inspected
- 25 July 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 6 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9643348 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
JZPA
1660680
Flag
INDONESIA
—
Maury page id
psix-1660680
Inspections, by type
The 5 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it48917 - Convention (Subpart B), Gross Ton
48917 - Regulatory (Subpart C or D), Gross Ton
54627 - Dead Weight, Ton
48917 - Displacement, Ton
16576 - Convention (Subpart B), Net Ton
16576 - Regulatory (Subpart C or D), Net Ton
48917 - Regulatory (Subpart C or D), Gross Ton
54627 - Dead Weight, Ton
48917 - Displacement, Ton
16576 - Convention (Subpart B), Net Ton
16576 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 5
25 July 2025
COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8187418
29 January 2024
COC-GAS Annual · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7848684
20 November 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7597413
18 November 2022
PSC B · COC-GAS Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7593895
23 July 2021
COC-GAS Renew · PSC A · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7246948
Deficiency record · 6
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 July 2025
Resolved
A gas carrier shall comply with the requirements of the International Gas Carrier Code and shall, in addition to the requirements of regulation I/8, I/9, and I/10, as applicable, be surveyed and certified as provided for in that Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory.
Electrical installations should be such as to minimize the risk of fire and explosion from flammable products*. Electrical installations complying with this chapter need not be considered as a source of ignition for the purposes of chapter 3.
PSCO Observed over 90% of explosion proof lighting in the cargo compressor room having cracked covers, explosion proof light above above compressor room port side entrance door missing appropriate hardware.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 25 July 2025
Resolved
A gas carrier shall comply with the requirements of the International Gas Carrier Code and shall, in addition to the requirements of regulation I/8, I/9, and I/10, as applicable, be surveyed and certified as provided for in that Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory.
Gas detection equipment should be so designed that it may readily be tested. Testing and calibration should be carried out at regular intervals. Suitable equipment and span gas for this purpose should be carried on board. Where practicable, permanent connections for such equipment should be fitted.
PSCO observed crew test fixed gas detection from compressor room and produced LEL % reading of over 100% thus indicating equipment is not properly calibrated. Crew conducted calibration on 08 July 2025 however crew certification could not be produced.
14 - Pollution Prevention › 148 - Ballast Water › Ballast water discharge
Issued 25 July 2025
Resolved
To discharge ballast water into waters of the United States, the master, owner, operator,agent, or person in charge of a vessel subject to § 151.2025 of this subpart must either ensurethat the ballast water meets the ballast water discharge standard as defined in § 151.2030(a),use an AMS as described in § 151.2025(a)(3) or ballast exclusively with water from a U.S.public water system, as described in § 151.2025(a)(2), according to the schedule in paragraph(b) of this section.
Subject Vessel (keel laid date 20DEC2012) and capacity of 23512.1 m3 remains inoperable, per vessels self-report.
02 - Structural Conditions › N/A - No Subsystem › Openings to cargo area, doors, ... scuttles
Issued 18 November 2022
Resolved
Airlock doors should be self-closing and without any holdback arrangements.
PSCO observed holdback arrangements and a non-operational self-closing device on the motor room door.
50ac
SOLAS (09CONSED) CH VII regulation 13.1
IGC Code (93ED) CH 3.6.2
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 18 November 2022
Resolved
Gas detection equipment should be so designed that it may be readily tested.
Crew members unable to demonsonstrate to PSCO satisfactory L.E.L. test on vessel's installed fixed gas sampling system.
17ac
SOLAS (09 CONSED) Ch VII Regulation 13.1
IGC Code (93ED) CH 13.6.6
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 23 July 2021
Resolved
PRESSURE RELIEF VALVES SHOULD BE SET AND SEALED BY A COMPETENT AUTHORITY ACCEPTABLE TO THE ADMINISTRATION.
PSCO FOUND TWO MARVS THAT HAD BROKEN SEALS.
74 SOLAS (20) VII/13.1
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.