HOKU AO is a 1979 passenger vessel (inspected). The Coast Guard has recorded 74 inspections since 1985, most recently in April 2026, along with 156 deficiencies and 3 operational controls.

Records from 1985 to 2026. Most recent: inspection, 29 April 2026.

Built
1979
Last inspected
29 April 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCX5196
167026
Flag
UNITED STATES
367189080
Maury page id
psix-167026

Inspections, by type

…with no type recorded2
Years with a record 38 calendar years (1985–2026)
The 74 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)52.0 ft × 22.0 ft × 6.4 ft
Registered tonnagegross 13 / net 12
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · HONOLULU, HI, UNITED STATES · built 1979
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHONOLULU, HI
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 11 August 2026 · expires 31 August 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it13 - Regulatory (Subpart C or D), Gross Ton
12 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WCX5196MMSI 367189080 · active · compulsorily equipped · granted 24 March 2017, expires 3 June 2027
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 74

29 April 2026 Vessel Attendance · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8357714
27 April 2026 Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8354854
30 April 2025 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8116634
30 April 2024 Drydock Exam · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7904211
15 April 2024 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8076578
28 February 2023 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7634595
17 June 2022 Internal Structural Exam · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7480573
16 February 2022 DAPI Audit · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7396393
26 May 2021 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7208287
4 June 2020 Drydock Exam · Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6929344
16 May 2019 Deficiency Check · DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6679264
5 April 2018 Deficiency Check · Annual Inspection · Administrative Inspection · Examination of Repairs · In-Service Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6385894
2 March 2017 COI Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6097784
29 November 2016 Deficiency Check · Drydock Exam · Examination of Repairs · In-Service Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6049507
29 June 2016 Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5924237
8 May 2014 Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4874786
30 December 2011 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4216262
14 July 2011 Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4081209
9 November 2010 Internal Structural Exam · Deficiency Check · Hull Examination · In-Service Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3888358
12 November 2008 Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3361590
20 March 2008 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3168427
25 October 2007 Damage Survey
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3087260
10 April 2007 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2911316
30 March 2007 COI Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2898490
19 October 2006 Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2788628
15 August 2006 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2782512
6 June 2005 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2381914
3 December 2004 Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2251499
22 March 2004 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2028608
9 April 2003 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1764066
13 November 2002 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1686093
5 April 2002 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1601800
21 March 2002 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1491108
30 April 2001 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1063662
5 April 2001 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1062417
30 March 2001 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1370079
27 April 2000 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 817298
20 April 2000 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1436364
1 April 1999 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1365128
29 October 1998 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1375537
29 September 1998 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 800966
17 April 1998 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1471500
4 June 1997 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1371913
3 June 1997 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1107933
4 November 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 857875
20 September 1996 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1374738
5 June 1996 Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1355837
7 May 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1353923
1 April 1996 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1377658
16 May 1995 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1371079
28 March 1995 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1377373
31 August 1994 Plan Review "T" Boat
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 870200
24 August 1994 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1411016
16 June 1994 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1354764
1 June 1994 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1382785
30 March 1994 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1356584
17 November 1993 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1397983
1 April 1993 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 837025
12 May 1992 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 953860
3 April 1992 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1254468
3 April 1991 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1228758
26 November 1990 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 907692
23 May 1990 Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 906045
3 April 1990 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 901557
21 April 1989 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1202794
22 November 1988 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 895973
27 June 1988 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1341589
26 April 1988 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1194671
12 May 1987 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1023781
21 April 1987 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1007973
18 April 1986 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1306693
4 December 1985 Credit Drydock
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 990536
23 October 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 994174
24 April 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 981293

Deficiency record · 156

11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 27 April 2026 Resolved
Life jackets must be marked with Type I retro reflective material approved in 46 CFR 164.018 or other standard specified by the Commandant. 03 adult life jackets found with worn retro reflective material. Repair retro reflective IAW manufacturer's instructions to the satisfaction of the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2026
Resolved 29 April 2026
Resolution: Attended and inspected repair, SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 30 April 2025 Resolved
Except as otherwise provided in this section, rails or equivalent protection must be installed near the periphery of all decks of a vessel accessible to passengers or crew. Port side railing forward of the cabin loose due to suspected wood rot at securing point. Starboard side rail support cracked. Repair in accordance with verbal repair plan. 46 CFR 177.10-1a
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 5 May 2025
Resolution: Port side railing fastenings repaired, mounting point filled with epoxy. Starboard side stanchion support replaced.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 30 April 2025 Resolved
In general, compliance with the standards established by a recognized classification society will be considered satisfactory evidence of the structural adequacy of a vessel. Wood rot found where starboard side aft hatch cover is secured to the deck. Repair in accordance with verbal repair plan. 46 CFR 177.35-1a
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 5 May 2025
Resolution: Starboard hatch cover mounting filled with epoxy and secured.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 February 2023 Resolved
A pre-engineered fixed gas fire extinguishing system must: Be installed in accordance with the manufacturer's instructions. Vessel has excessive space around shaft in aft bulkhead feed through to shaft alley compartment in port and starboard engine compartments, limiting effectiveness of fixed fire fighting system. Reduce area around shaft with gasket material to limit the escape of fire extinguishing agent from engine compartments. 46CFR181.420(a)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 March 2023
Resolved 16 March 2023
Resolution: Received photographic evidence that gasket material was installed around shafts and all bolt holes were filled in engine spaces with pre-engineered fire fighting system installed.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 May 2021 Resolved
A pre-engineered fixed gas fire extinguishing system must: Be installed in accordance with the manufacturer's instructions. Multiple openings with missing insulating foam in both port and starboard engine rooms bulkheads, would allow fixed fire extinguishing medium to communicate freely through the bulkheads. Make bulkheads vapor tight to ensure quantity of extinguisher agent is sufficient.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 June 2021
Resolved 4 June 2021
Resolution: Operator provided photographs of bulkheads made vapor tight by sealing openings.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 May 2021 Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station: A light to indicate discharge. Discharge light failed to illuminate during testing. Make discharge light illuminate.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 June 2021
Resolved 4 June 2021
Resolution: Operator provided video of proper operation of the discharge light.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 May 2021 Resolved
At least one ring life buoy must be fitted with a lifeline. Each lifeline on a ring life buoy must be of at least 60 feet in length. Ring life buoy lifeline found to be under 60 feet. Provide correct length of lifeline for ring life buoy on board vessel and properly arrange.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 June 2021
Resolved 4 June 2021
Resolution: Operator provided objective evidence the new line for the ring life buoy is 60 feet and arranged properly.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 May 2021 Resolved
Each portable fire extinguisher on a vessel must be of an approved type. Salon fire extinguisher missing bracket making it a non-approved type. Provide approved bracket listed on fire extinguisher approval label.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 June 2021
Resolved 4 June 2021
Resolution: Operator provided photograph of approved bracket with fire extinguisher.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 16 May 2019 Resolved
Operation of transmitters of any ship station must be performed by a person holding a commercial radio operator license. The operator is responsible for the proper operation of the station. Provide FCC Operators Permit for each master of the vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 June 2019
Resolved 24 May 2019
Resolution: Operator provided FCC operators permit, all sat.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 24 April 2018 Resolved
Code 13101: Found improperly aligned port/stbd main engine shafts. Misalignment is creating stress at the flexible stuffing box and compromises the watertight integrity of the through-hull assembly. Conduct dry dock within 30 days to assess damage and confirm watertight integrity of through-hull assembly. 46CFR176.670
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 May 2018
Resolved 22 June 2018
Resolution: Existing bulkhead grinded and repaired with (1) 1.5oz mat, (2) layers 24 oz Kyntex cloth, and (1) 1.5 oz chopmat. Epoxy 4:1. Sealed bulkhead, installed wall bearing to support shaft. Shaft couplings faced out to true, new strut cutlass bearing, new props.
Construction/Loadline › Hull › Transverse Frame
Issued 24 April 2018 Resolved
Code 02110: Found two fractured deck beams in the port and stbd rudder compartments; aft of the hatch in the port compartment and forward of the hatch in the stbd compartment. Provide repair proposal prior to conducting repairs. 46CFR177.10-1 and 46CFR176.20-1
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2018
Resolved 22 June 2018
Resolution: Deck beams cropped out entirely and replaced in kind. Operator glassed in newly installed wood deck beams.
Engineering › Steering Gear System › Cable
Issued 2 March 2017 Resolved
Steering cable is deteriorated and fraying in (03) separate spots. Replace cable as original. 46 CFR 176.25-35.
Action required: 705 - Other - as specified
Due 13 March 2017
Resolved 13 March 2017
Resolution: Steering cable replaced.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 2 March 2017 Resolved
Port fuel tank's bonding wire is completely exposed. Starboard fuel tank's bonding wire is missing. Install new bonding wire on both tanks. 46 CFR 182.20-25(b)(4)
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 13 March 2017
Resolution: Fuel tank bonding wire(s) replaced.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 2 March 2017 Resolved
(02) B-II fire extinguishers are unserviceable due to corrosion. Significant rust on bottle. Replace (02) portable extinguishers as original. 46 CFR 462.028(c)(6)(ii)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 April 2017
Resolved 9 March 2017
Resolution: Vessel owner provided photo of new portable extinguishers onboard and receipt of purchase and servicing.
Engineering › Sea-water System (primary cooling) › Valve
Issued 2 March 2017 Resolved
Seawater interconnect valve in port engine space is corroded/unserviceable. Replace as original. 46 CFR 176.25-1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 13 March 2017
Resolution: Valve replaced.
Engineering › Bilge Water Management System › Pump
Issued 2 March 2017 Resolved
Electrical submersible bilge pumps do not meet UL 1113. 46 CFR 182.520(e)
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 13 March 2017
Resolution: UL listed bilge pumps installed.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 2 March 2017 Resolved
FCC Safety Certificate was not onboard for inspection. 47 CFR 80.903
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 April 2017
Resolved 9 March 2017
Resolution: Company secretary emailed copy of FCC Safety Cert.
Construction/Loadline › Hull › Stiffener
Issued 2 March 2017 Resolved
Repair crack in longitudinal section of port side bulkhead, port hull. 46 CFR 176.25-1.
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 13 March 2017
Resolution: Crack repaired satisfactory.
Documentation › Markings/Placards › Injury Placard
Issued 2 March 2017 Resolved
Donning instructions do not match type of lifejacket onboard. Provide donning instructions for type of lifejacket onboard. 46 CFR 185.516
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 13 March 2017
Resolution: Life jacket donning instructions updated.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 2 March 2017 Resolved
Electrical wire penetrations in forward engine room bulkhead are not watertight. Make bulkhead penetrations in watertight bulkhead watertight. 46 CFR 179.320(c)
Condition: Invalid
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 13 March 2017
Resolution: Electrical penetrations in engine compartments made watertight.
Engineering › Fuel Oil Service System › Valve
Issued 2 March 2017 Resolved
Emergency fuel shutoff valves are not labeled. Label emergency fuel shutoff valves. 46 CFR 185.608
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 13 March 2017
Resolution: Fuel shutoff valves properly labeled.
Operations/Management › Drills/Instruction › Not Conducted
Issued 2 March 2017 Resolved
Conduct drills in accordance with posted emergency procedures. 46 CFR 176.808(g)
Condition: Invalid
Action required: 705 - Other - as specified
Due 13 March 2017
Resolved 13 March 2017
Resolution: Man overboard and fire drills observed satisfactory.
Engineering › Bilge Water Management System › Pump
Issued 2 March 2017 Resolved
Portable hand bilge pump must be capable of pumping water; hand pump inoperable IAW 46 CFR 182.510(b)(1)(2).
Due 16 March 2017
Resolved 15 April 2017
Resolution: New portable bilge pump purchased and installed.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 29 June 2016 Resolved
22 Kapok PFDs had lost airtight integrity and were no longer servicable. Vessel restricted to 22 POB until servicable PFDs are provided.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2016
Resolved 8 July 2016
Resolution: All unservicable PFDs replaced with new Type I's. Rep provided reciept.
Construction/Loadline › Structures › Deck Plating
Issued 29 June 2016 Resolved
Repair multiple areas of deck cracking and deck rot at next drydock.
Action required: 705 - Other - as specified
Due 1 November 2016
Resolved 11 January 2017
Construction/Loadline › Structures › Ventilators
Issued 29 June 2016 Resolved
Replace all compartment vent covers to prevent water ingress. Several covers are missing and or broken.
Action required: 705 - Other - as specified
Due 29 July 2016
Resolved 8 July 2016
Resolution: New vents were purchased and installed.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 29 June 2016 Resolved
Investiagate and repair cause of port engine shaft vibration. Proove proper operation.
Due 29 July 2016
Resolved 8 July 2016
Resolution: Fishing line was discovered wrapped around port shaft and removed.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 29 June 2016 Resolved
Provide a fire servicing certificate for all portable fire extinguishers prior to expiration in August.
Action required: 705 - Other - as specified
Due 1 August 2016
Resolved 23 August 2016
Resolution: Portable fire extinguishers serviced by Fire Safety Inc.
Fire Fighting › Remote Fuel Shutoff › General
Issued 29 June 2016 Resolved
Properly label remote fuel cutt-off valves.
Action required: 705 - Other - as specified
Due 29 July 2016
Resolved 23 August 2016
Resolution: Fuel shut-offs labeled.
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 8 May 2014 Resolved
REPLACE PLASTIC FUEL FILTERS W/ NEW METAL CASINGS FOR FUEL IMPINGMENT BOWLS
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2014
Resolution: Fixed that day
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 14 July 2011 Resolved
STBD bow ladder is restricted from passenger use until properly refastened.
Action required: 705 - Other - as specified
Due 14 August 2011
Resolved 22 August 2011
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 14 July 2011 Resolved
Submit repair proposals for bow ladder mounting points.
Action required: 705 - Other - as specified
Due 14 August 2011
Resolved 22 August 2011
Construction/Loadline › Hull › Hull Plating
Issued 9 November 2010 Resolved
Provide repair proposal for de-lamination in way of stbd strut and hull areas identified by the attend MI prior to making repairs.
Action required: 705 - Other - as specified
Resolved 18 November 2010
Resolution: See attached repair proposal.
Construction/Loadline › Hull › Hull Plating
Issued 9 November 2010 Resolved
Remove all uncured resin from port and stbd hulls to facilitate a proper inspection.
Action required: 705 - Other - as specified
Resolved 18 November 2010
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 9 November 2010 Resolved
Renew plywood inserts on swim platform.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 9 November 2010 Resolved
Renew port side swim platform as original (cable).
Action required: 705 - Other - as specified
Resolved 30 November 2010
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 9 November 2010 Resolved
Repair as original port side boarding ladder.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Construction/Loadline › Structures › Deck Plating
Issued 9 November 2010 Resolved
Grind and make available for inspection: area identified in the well deck aft of the cabin entrance, stbd side deck IWO embarkation station, port side on deck at hand rail mount.
Action required: 705 - Other - as specified
Resolved 18 November 2010
Construction/Loadline › Structures › Ventilators
Issued 9 November 2010 Resolved
Reglass port and stbd vent boxes IWO port and stbd embarkation stations.
Action required: 705 - Other - as specified
Resolved 18 November 2010
Construction/Loadline › Hull › Stiffener
Issued 9 November 2010 Resolved
Renew masthead foundation.
Action required: 705 - Other - as specified
Resolved 30 November 2010
Fire Fighting › Means of Escape › Escape Route Signs
Issued 9 November 2010 Resolved
Emergency exit: renew gasket, label "Emergency Exit, Keep Clear" on outside, rebed hinge bolts.
Action required: 705 - Other - as specified
Resolved 30 November 2010
Construction/Loadline › Structures › Deck Plating
Issued 9 November 2010 Resolved
Fill chain plate holes port and stbd side with dowel and resin, repair old compressor mounting holes.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Engineering › Bilge Water Management System › Valve
Issued 9 November 2010 Resolved
Provide positive action valve for bilge pump ovbd stbd aft void.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Electrical › Electrical Distribution System (service) › Junction Box
Issued 9 November 2010 Resolved
Renew jct box cover stbd aft void.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 9 November 2010 Resolved
Replace rubber exhaust coupler with approved exhaust hose.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Engineering › Steering Gear System › Rudder
Issued 9 November 2010 Resolved
Repair upper rudder mounting flanges.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 9 November 2010 Resolved
Make swim ladder available for inspection.
Action required: 705 - Other - as specified
Resolved 30 November 2010
Resolution: Rewelded cracked welds.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 9 November 2010 Resolved
Weld outboard starboard swim ladder attachment point.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Construction/Loadline › Structures › Deck Plating
Issued 9 November 2010 Resolved
Make repair to entire well deck.
Action required: 705 - Other - as specified
Resolved 30 November 2010
Construction/Loadline › Structures › Deck Plating
Issued 9 November 2010 Resolved
Remove aft 2x4 and make interior of swim step available for inspection.
Action required: 705 - Other - as specified
Resolved 22 November 2010
Resolution: Renewed rotted wood.
Construction/Loadline › Hull › Bottom Plating
Issued 24 November 2008 Resolved
WORKLIST - Found fiberglass bottom seal failed in vicinity of the bilge pump in the stbd bow compartment. Dry/grind to wood and reseal.
Due 24 December 2008
Resolved 2 December 2008
Resolution: Sighted proper repair.
Construction/Loadline › Hull › Side Shell
Issued 12 November 2008 Resolved
WORKLIST - Port Hull Exterior: Found blemishes as follows: Outboard: 18" gash even with skeg opening, (3) gashes 15' from the stern, water seeping through FRP 12' from stern, multiple blisters above waterline forward of amidships. Inboard: Running rust from fastener 8' from stern. Found water seeping from shaft strut mounting plate.
Action required: 17 - Rectify deficiencies prior to departure
Due 12 December 2008
Resolved 24 November 2008
Resolution: Sighted proper repairs.
Construction/Loadline › Hull › Side Shell
Issued 12 November 2008 Resolved
WORKLIST - Starboard: Inboard: Found compromised outer layer of FRP 3" X 2" 9' from stern.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighted proper repair.
Construction/Loadline › Hull › Hull Plating
Issued 12 November 2008 Resolved
WORKLIST - Found damage to the interior of the hulls as follows: Port: Wood rot in Void #2 at vent and in overhead of cupboards. Found wood rot in Engine room overhead at vent. Starboard: Found angel hair and dry rot in forward deck support to engine compt at hatch.
Due 11 December 2008
Resolved 10 December 2008
Resolution: Verified proper repairs.
Construction/Loadline › Penetrations › Valve Flange
Issued 12 November 2008 Resolved
Found most valves and spoolpiece hull penetrations stiff, worn and corroded. Replace all valves and spoolpieces except that the port fire pump intake and bilge discharge valves are okay and the starboard bilge discharge in the bow is okay.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighted newly installed valves and spoolpieces as required.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 12 November 2008 Resolved
WORKLIST - Found unstuffed holes in bulkhead between port #2 void and the engine compartment. Seal bulkhead penetrations.
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighted proper repair.
Engineering › Shafting/Propeller Arrangements › Strut Bearing
Issued 12 November 2008 Resolved
WORKLIST - Found port tailshaft strut bearing worn. Replace bearing.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighted proper repair.
Engineering › Shafting/Propeller Arrangements › Strut
Issued 12 November 2008 Resolved
WORKLIST - Found the internal mounting plates for the port and stbd shaft struts corroded due to possible electrical stray currents. Replace both internal mounting plates.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighed newly manufactured and installed backing plates.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 12 November 2008 Resolved
WORKLIST - Found damaged port propeller blade. Repair/Replace port propeller.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 24 November 2008
Resolution: Sighted proper repair.
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 12 November 2008 Resolved
WORKLIST - Operator noted possible leaking from the stbd shaft packing. Repack stbd shaft seal.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 2 December 2008
Resolution: Shaft seal was repacked.
Engineering › Shafting/Propeller Arrangements › Intermediate Shaft
Issued 12 November 2008 Resolved
WORKLIST - Found port engine drive shaft misaligned with the shaft log. Realign the drive shaft to the shaft log.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighed proper repair.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 12 November 2008 Resolved
WORKLIST - Found the port and stbd fuel tank vent screens painted over or missing. Also found damaged or missing vent screens for the fresh water, and sewage tank vents. Replace vent screens throughout.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 24 November 2008
Resolution: Sighed new vent covers and screens for fuel, pot water and sewage systems.
Electrical › Electric Generation Source (service) › Grounding Conductor
Issued 12 November 2008 Resolved
WORKLIST - Found crumbling copper grounding wire in the port and stbd lazerettes. Replace copper grounding system.
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighted proper repairs.
Electrical › Electric Supply System (service) › Battery Installation
Issued 12 November 2008 Resolved
WORKLIST - Found battery boxes in the port and stbd hulls damaged. Repair/replace the damaged battery boxes.
Due 11 December 2008
Resolved 2 December 2008
Resolution: Battery boxes were repaired by fiberglassing bottoms back into place.
Engineering › Bilge Water Management System › Piping
Issued 12 November 2008 Resolved
WORKLIST - Found corroded/unused copper tubing for earlier bilge water system in the #2 Void. Remove unused tubing.
Due 11 December 2008
Resolved 2 December 2008
Resolution: Excess copper tubing removed from vessel.
Electrical › Lighting (emergency) › Switch
Issued 12 November 2008 Resolved
WORKLIST - Found broken wires on the port engine water temperature switch. Repair switch.
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighted proper repair.
Engineering › Bilge Water Management System › Valve
Issued 12 November 2008 Resolved
WORKLIST - Found the fire/bilge pump 3-way valve sticking and difficult to operate. Prove proper operation of the 3-way valve.
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighted proper repair.
Engineering › Bilge Water Management System › Strainer
Issued 12 November 2008 Resolved
WORKLIST - Found the fixed bilge intake screen damaged and inoperative in the port lazerette. Replace with a new screen.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 2 December 2008
Resolution: Sighted proper repair.
Construction/Loadline › Hull › Stiffener
Issued 12 November 2008 Resolved
WORLIST - Found wood rot in the aft deck grid structure as follows: 4' X8' marine plywod decking rotted and seperating from undergrid throughout. Found several rotted longitudinal 4" X 6" stiffiners and found forwadmost 4" X 6" transverse support of underdeck grid rotted at ends and along the top. Replace all in kind.
Due 11 December 2008
Resolved 2 December 2008
Resolution: Operator rebuilt the entire underdeck grid support and decking for the aft deck in kind.
Construction/Loadline › Structures › Superstructure
Issued 12 November 2008 Resolved
WORKLIST - Found wood rot in cabin structures as follows: Found rotted wood in all benches aft of the cockpit. Replace benches. Found hatch cover over stbd engine compartment damaged at the location of the forward hinge.
Due 11 December 2008
Resolved 10 December 2008
Resolution: Verified proper repairs.
Construction/Loadline › Hull › Bottom Plating
Issued 12 November 2008 Resolved
WORKLIST - Found delaminated fiberglass approx 2' aft of center to the amidship underwing on the port side. Grind to good fiberglass and repair.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 December 2008
Resolved 2 December 2008
Resolution: Ssighted proper repair.
Construction/Loadline › Structures › End Bulkhead
Issued 12 November 2008 Resolved
WORKLIST - Found running rust coming from fasteners for the stbd bow ladder on the fwd face of the wing. Replace fasteners and retain old fasteners for USCG inspector. Found worn tread on bow ladders. Replace tread. Found damaged/missing rail courses on the forward stbd rails. Repair/replace rail courses.
Due 11 December 2008
Resolved 15 December 2008
Resolution: Fasteners were removed. Evaluation revealed rust to be coming from wasted washers. Fasteners were of stainless steel and in good condition. Washers were replaced in kind. Worn tread and rail courses were satisfactorily replaced.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 12 November 2008 Resolved
WORKLIST - Found the masthead light obscured by the cabin. Raise the mashead light in accordance with Annex I of the Navigation Rules.
Due 11 December 2008
Resolved 15 December 2008
Resolution: Masthead light was raised appx 6'' above the cabin ensuring max arc of vis iaw Nav Rules.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 20 March 2008 Resolved
Destroyed and removed (3) worn and faded adult life jackets from the vessel. Provide (2) adult life jackets to bring the total onboard to (49) in accordance with the COI. Vessel is limited to the carriage of no more than 45 passengers until corrected.
Due 21 March 2008
Resolved 1 April 2008
Resolution: Sighted (4) new, properly marked adult lifejackets.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 20 March 2008 Resolved
Found (14) adult life jackets with peeling, faded, or missing retroreflective material. Replace the retroreflective material on (14) adult life jackets.
Due 3 April 2008
Resolved 20 March 2008
Resolution: Retro material was added to needed lifejackets prior to completion of the inspection.
Fire Fighting › Fire Bucket › Quantity
Issued 20 March 2008 Resolved
Found (2) fire buckets aboard vessel. Provide (3) 2 1/2 gallon fire buckets with lanyard and proper marking.
Due 3 April 2008
Resolved 1 April 2008
Resolution: Sighted (3) properly marked 2 1/2 gallon fire buckets.
Fire Fighting › Structural - Horizontal Zones › General
Issued 20 March 2008 Resolved
Found vapor seal at the shaft penetrations through the aft compartments worn or missing. Replace/repair the vapor seals port and stbd.
Due 10 April 2008
Resolved 22 April 2008
Resolution: Sighted newly installed vapor seals.
Deck/Cargo › Mooring/Anchoring › Anchor Cable
Issued 20 March 2008 Resolved
Found anchor and cable attached with bowlines. Attach anchor to chain and chain to line with properly made up shackles.
Due 3 April 2008
Resolved 1 April 2008
Resolution: The anchor to chain and chain to line connections are made with mechanical fittings.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 20 March 2008 Resolved
Provide a machinery guard over the front of the port engine. The lever for engaging a fire pump is located near the fan belt.
Condition: Unknown
Due 10 April 2008
Resolved 22 April 2008
Resolution: Sighted newly installed machinery guard.
Engineering › Bilge Water Management System › Pump
Issued 20 March 2008 Resolved
Found a portable bilge pump aboard with no hose attached. Provide hose for the portable bilge pump long enough to enable crew to dewater from the bottom of each compartment to the sea.
Due 3 April 2008
Resolved 1 April 2008
Resolution: Sighted a new portable bilge pump with adequate hose attached.
Navigation › Piloting/Steering › Marine Charts
Issued 11 April 2007 Resolved
Provide navigational chart
Condition: Unknown
Action required: 705 - Other - as specified
Due 17 April 2007
Resolved 17 April 2007
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 11 April 2007 Resolved
Make repairs to lifejackets
Condition: Unknown
Action required: 705 - Other - as specified
Due 17 April 2007
Resolved 17 April 2007
Engineering › Diesel Engine (propulsion-electric) › Piping (exhaust)
Issued 11 April 2007 Resolved
Make repairs to vessel exhaust piping
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 April 2007
Resolved 17 April 2007
Documentation › Certificates/Documents
Issued 22 March 2004 Resolved
Provide a valid FCC Marine Radio Operator Permit. LEGACY COMPONENT DESC: FCC SSL
Due 7 April 2004
Resolved 23 March 2004
Documentation › Certificates/Documents
Issued 22 March 2004 Resolved
Provide a valid FCC Safety Certificate.
Due 7 April 2004
Resolved 23 March 2004
Lifesaving › Lifebuoys
Issued 22 March 2004 Resolved
Provide retro-reflective tape for ring lifebuoy in accordance with 46 CFR 185.604(i).
Due 7 April 2004
Resolved 23 March 2004
Navigation › Piloting/Steering › Coast Guard Light List
Issued 22 March 2004 Resolved
Provide a Coast Guard Light List in accordance with 46 CFR 184.420.
Due 7 April 2004
Resolved 23 March 2004
Lifesaving › Lifebuoys
Issued 22 March 2004 Resolved
Provide an operable water light for the ring life buoy in accordance with 46 CFR 181.30.
Due 7 April 2004
Resolved 23 March 2004
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Valve
Issued 22 March 2004 Resolved
Provide seals for the activation pins on (2) portable fire extinguishers in accordance with 46 CFR 76.810.
Due 7 April 2004
Resolved 22 March 2004
Electrical › Electrical Distribution System (service) › Junction Box
Issued 22 March 2004 Resolved
Provide a cover for the electrical junction box in the forward starboard compartment in accordance with 46 CFR 183.200.
Due 7 April 2004
Resolved 23 March 2004
Accommodation/Occupational Safety › Occupational Safety › Lifeline
Issued 22 March 2004 Resolved
Renew lifeline for the starboard aft section of the railing
Due 7 April 2004
Resolved 23 March 2004
Documentation › Certificates/Documents
Issued 9 April 2003 Resolved
Provide a current FCC Safety Certificate IAW 46CFR184.502. LEGACY COMPONENT DESC: FCC Safety Certificate
Due 10 May 2003
Resolved 16 April 2003
Lifesaving › Lifebuoys
Issued 9 April 2003 Resolved
Install a 3' to 6' lanyard with detachable clip for lifebuoy waterlight. LEGACY COMPONENT DESC: Waterlight lanyard
Condition: Improper Installation
Due 9 April 2003
Resolved 9 April 2003
Resolution: Corrected on the Spot.
Lifesaving › Lifejacket/PFD (Type I)
Issued 21 March 2002 Resolved
Reto-reflective material on 16 lifejackets was replace prior to completion of the inspection. LEGACY COMPONENT DESC: Retroreflective Material
Condition: Improper/Lack of Maintenance
Due 21 March 2002
Resolved 21 March 2002
Construction/Loadline › Structures
Issued 21 March 2002 Resolved
Replace/repair stbd side forward middle wire on deck rail in accordance with 46 CFR 177.900. LEGACY COMPONENT DESC: Deck Rail
Condition: Improper/Lack of Maintenance
Due 28 March 2002
Resolved 5 April 2002
Resolution: Master repaired deck rail.
Construction/Loadline › Structures
Issued 21 March 2002 Resolved
Replace/repair clips for deck rails (wire) at embarkation station on stbd side, in accordance with 46 CFR 177.900. LEGACY COMPONENT DESC: Deck Rails
Condition: Improper/Lack of Maintenance
Due 28 March 2002
Resolved 5 April 2002
Resolution: Master replaced clips for deck rails.
Stability › Watertight Integrity
Issued 21 March 2002 Resolved
Replace stbd port light in stbd head outboard side in accordance with 46 CFR 179.350. LEGACY COMPONENT DESC: Port light
Condition: Unknown
Due 28 March 2002
Resolved 5 April 2002
Resolution: Master replaced stbd port light.
Documentation
Issued 30 March 2001 Resolved
Provide a valid Marine Radio Operator permit IAW 46 CFR 184.502.
Condition: Unknown
Due 30 March 2001
Resolved 30 March 2001
Fire Fighting
Issued 30 March 2001 Resolved
Repair vent closure device for starboard engine compartment IAW 46 CFR 182.465(h).
Condition: Unknown
Due 5 April 2001
Resolved 5 April 2001
Construction/Loadline
Issued 20 April 2000 Resolved
Repair bilge float switches/alarms in port hull and lower float switch in starboard engine compartment iaw 46CFR 182.530.
Condition: Unknown
Due 28 April 2000
Resolved 28 April 2000
Lifesaving
Issued 20 April 2000 Resolved
Replace retrograde material on (16) adult lifejackets iaw 46CFR 185.604(h).Passenger carriage limited to 31 adult and 5 children pending replacement of retrograde material.
Condition: Unknown
Due 28 April 2000
Resolved 28 April 2000
Fire Fighting
Issued 20 April 2000 Resolved
Replace rubber gasket material in port engine compartment shaft penetrationto lazarette to make compartment vapor tight iaw 46CFR 182.465.
Condition: Unknown
Due 28 April 2000
Resolved 28 April 2000
Fire Fighting
Issued 20 April 2000 Resolved
Provide proof of annual service of portable fire extinguishers iaw 46CFR 176.810(b).
Condition: Unknown
Due 28 April 2000
Resolved 28 April 2000
Lifesaving
Issued 20 April 2000 Resolved
Provide logbook(s) showing record of drills, and maintenance of life savingequipment iaw 46CFR 185.420 and 185.520.
Condition: Unknown
Due 28 April 2000
Resolved 28 April 2000
Accommodation/Occupational Safety
Issued 1 April 1999 Resolved
Provide plans and specifications for newly installed pressure vessel/compressor used for Seawalker Dive Helmets to USCG.
Condition: Unknown
Due 22 July 1999
Resolved 22 July 1999
Unknown
Issued 1 April 1999 Resolved
Conduct training and document employee training regarding company drug and alcohol policy and post hotline number for employees.
Condition: Unknown
Due 12 July 1999
Resolved 12 July 1999
Lifesaving
Issued 1 April 1999 Resolved
Acquire (2) USCG approved orange smoke signals for the signal kit IAW 46CFR180.68.
Condition: Unknown
Due 29 June 1999
Resolved 29 June 1999
Fire Fighting
Issued 1 April 1999 Resolved
Complete installation of fixed fire suppression system iaw 46 CFR 181.400
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Unknown
Issued 1 April 1999 Resolved
Conduct (60 minutes) supervisor training for Employee Assistance Program.
Condition: Unknown
Due 12 July 1999
Resolved 12 July 1999
Fire Fighting
Issued 1 April 1999 Resolved
Provide means of making engine space vapor tight in the event of fire and activation of a fixed gas fire suppression system.
Condition: Unknown
Due 7 July 1999
Resolved 7 July 1999
Navigation
Issued 1 April 1999 Resolved
Repair starboard running light and install stern light in a location where it can be seen, or request change of COI to operate in daytime only as vessel currently does.
Condition: Unknown
Due 7 July 1999
Resolved 7 July 1999
Accommodation/Occupational Safety
Issued 1 April 1999 Resolved
Install and arrange for inspection of ASME approved pressure vessel for SEAWALKER dive helmet system.
Condition: Unknown
Due 22 July 1999
Resolved 22 July 1999
Engineering
Issued 1 April 1999 Resolved
Replace engine room exhaust ducting for blower with rigid and_x001C_ fire resistent material IAW 46CFR 182.465(d).
Condition: Unknown
Due 29 June 1999
Resolved 29 June 1999
Navigation
Issued 1 April 1999 Resolved
Acquire chart, Coast Pilot (excerpt), and Light List (excerpt) for Kaneohe Bay.
Condition: Unknown
Due 7 July 1999
Resolved 7 July 1999
Construction/Loadline
Issued 5 June 1996 Resolved
1. Make permanent repairs to the separated resin sealant on the bilge system bulkhead penetrations in both hulls.
Condition: Unknown
Due 5 June 1996
Resolved 5 June 1996
Construction/Loadline
Issued 5 June 1996 Resolved
2. Make permanent repairs to the port main engine salt water cooling inlet sea valve which is presently frozen in the open position.
Condition: Unknown
Due 5 June 1996
Resolved 5 June 1996
Navigation
Issued 1 April 1996 Resolved
Provide emergency broadcast placard IAW IFR 46CFR184.506
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Lifesaving
Issued 1 April 1996 Resolved
Repair or replace lifering.
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Lifesaving
Issued 1 April 1996 Resolved
Provide type II retro tape for lifering IAW IFR 46CFR185.604(i)
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Lifesaving
Issued 1 April 1996 Resolved
Provide watertight container for visual distress signals IAW IFR 46CFR185.614
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Unknown
Issued 1 April 1996 Resolved
Place name on both bows IAW 46CFR67.123(a).
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Construction/Loadline
Issued 1 April 1996 Resolved
Provide a means to positively secure thru-hulls for electric submersible pumps IAW IFR 46CFR182.520(e).
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Electrical
Issued 1 April 1996 Resolved
Place wiring splices for electrical submersible bilge pumps in junction boxes.
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Fire Fighting
Issued 1 April 1996 Resolved
Replace PVC sea valve for fire main overboard discharge.
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Accommodation/Occupational Safety
Issued 1 April 1996 Resolved
Renew lifelines at the embarkation area.
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Navigation
Issued 1 April 1996 Resolved
Provide anchor dayshape IAW Inland Rules of the Road.
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Electrical
Issued 1 April 1996 Resolved
Provide 2 portable lights IAW IFR 46CFR183.430
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Navigation
Issued 1 April 1996 Resolved
Provide light for magnetic compass IAW IFR 46CFR184.402
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Lifesaving
Issued 1 April 1996 Resolved
Conduct and log annual inspection IAW IFR 46CFR185.726.
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Lifesaving
Issued 1 April 1996 Resolved
Provide written copy of passenger safety oriention. Information for orientation must be IAW IFR 46CFR185.506
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Documentation
Issued 1 April 1996 Resolved
Provide logbook for crew training IAW IFR 46CFR420.
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Fire Fighting
Issued 1 April 1996 Resolved
Conduct firefighting training IAW IFR 46CFR185.524
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Lifesaving
Issued 1 April 1996 Resolved
Provide PFD placard IAW IFR 46CFR185.516
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Documentation
Issued 1 April 1996 Resolved
Log passenger count IAW 46CFR185.504
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Lifesaving
Issued 1 April 1996 Resolved
Conduct abandon ship/man overboard training IAW IFR 46CFR185.520
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Engineering
Issued 1 April 1996 Resolved
Provide shut down capability for MDE's at operating station IAW IFR 46CFR184.620
Condition: Unknown
Due 1 April 1996
Resolved 1 April 1996
Engineering
Issued 28 March 1995 Resolved
PROVIDE PROPER DOUBLE HOSE CLAMPS ON SEA WATER SUPPLY SYSTEMS ON BOTH ENGINES.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Electrical
Issued 28 March 1995 Resolved
PROVIDE PROPER GROUNDING SYSTEM FOR VESSEL.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Accommodation/Occupational Safety
Issued 28 March 1995 Resolved
RENEW BOTH BLOWER MOTORS AND PROVE PROPER OPERATION.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Lifesaving
Issued 28 March 1995 Resolved
PROVIDE PROPER SECURING MEANS FOR PORT ENGINE EMERGENCY SHUT OFF.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Lifesaving
Issued 1 June 1994 Resolved
CG 835 ISSUED TO REPLACE MISSING TRAMPOLINE SEATING AREA LOCATED BETWEEN HULLS AT THE STERN.
Condition: Unknown
Due 14 June 1994
Resolved 16 June 1994
Engineering
Issued 1 June 1994 Resolved
CG 835 ISSUED TO REPLACE STARBOARD UPPER SHROUD. SHROUD FOUND IN WASTED CONDITION.
Condition: Unknown
Due 14 June 1994
Resolved 16 June 1994
Documentation
Issued 30 March 1994 Resolved
Submit plans for machinery installation, fuel tanks, and piping systems forapproval IAW 46 CFR 177.05-1(a) and ltr dated 9 September 1981 from U.S. Coast Guard, Marine Safety Office to [name withheld].
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Accommodation/Occupational Safety
Issued 30 March 1994 Resolved
SUBMIT PLANS AND PROVE PROPER OPERATION AND INSTALLATION OF THE COOKING APPLIANCE IN THE GALLEY IN ACCORDANCE WITH 46 CFR 184.05-1, OR REMOVE FROM THE VESSEL.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Engineering
Issued 30 March 1994 Resolved
PROPERLY LABEL THE REMOTE FUEL SHUT-OFFS.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Construction/Loadline
Issued 30 March 1994 Resolved
MAKE BOTH FOREPEAKS AVAILABLE FOR INSPECTION AT THE NEXT DRYDOCK, BUT NO LATER THAN 30MAY94.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Construction/Loadline
Issued 30 March 1994 Resolved
PROVE PROPER OPERATION OF THE BILGE MANIFOLD SYSTEM IAW 46 CFR 182.25-10, OR INSTALL A HIGH WATER BILGE ALARM AND A PUMP OPERATION INDICATOR FOR EACHELECTRIC BILGE PUMP AT THE OPERATING STATION.
Condition: Unknown
Due 30 March 1994
Resolved 30 March 1994
Lifesaving
Issued 3 April 1992 Resolved
PROVIDE 3 ADDITIONAL ORANGE FLARES. VESSEL IS LIMITED TO SHORT RUNS OF APPROX. 30 MINUTES.
Condition: Unknown
Due 3 April 1992
Resolved 3 April 1992
Accommodation/Occupational Safety
Issued 3 April 1992 Resolved
INSTALL INSECT SCREENS ON BOTH PORT AND STARBOARD FRESH WATER TANKS.
Condition: Unknown
Due 3 April 1992
Resolved 3 April 1992
Lifesaving
Issued 3 April 1992 Resolved
PROVIDE 2 ADDITIONAL ADULT PFD'S. VESSEL IS LIMITED TO CARRYING 47 TOTAL PERSONS.
Condition: Unknown
Due 3 April 1992
Resolved 3 April 1992
Lifesaving
Issued 3 April 1992 Resolved
STOW ALL LIFE PRESERVERS THROUGH THE UPPER PART OF THE VESSEL IN LOCATIONS CONVENIENT TO PASSENGERS AND PROPERLY LABEL STOWAGE AREAS.
Condition: Unknown
Due 3 April 1992
Resolved 3 April 1992
Lifesaving
Issued 3 April 1991 Resolved
REPLACE BATTERY IN WATERLIGHT FOR RING BUOY.
Condition: Unknown
Due 3 April 1991
Resolved 3 April 1991
Electrical
Issued 3 April 1991 Resolved
REPAIR THE OVERHEAD LIGHT FIXTURE IN PORT ENG. ROOM.
Condition: Unknown
Due 23 July 1991
Resolved 23 July 1991
Unknown
Issued 3 April 1990 Resolved
STENCIL VESSEL'S NAME ON PORT AND STBD BOW AND HAILING PORT ON THE STERN.
Condition: Unknown
Due 3 April 1990
Resolved 3 April 1990
Navigation
Issued 3 April 1990 Resolved
PROVIDE AND INSTALL MAGNETIC COMPASS.
Condition: Unknown
Due 3 April 1990
Resolved 3 April 1990
Lifesaving
Issued 3 April 1990 Resolved
PROVIDE ADDITIONAL 1 CHILD AND 6 ADULT LIFE PRESERVERS. TOTAL PERSONS CARRIED WILL BE LIMITED TO 43 ADULTS AND 4 CHILDREN UNTIL THIS ITEM IS COMPLETED.
Condition: Unknown
Due 3 April 1990
Resolved 3 April 1990

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.