10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 17 June 2025
Resolved
...as appropriate for the intended voyage, each vessel must carry adequate and up-to-date...Charts of large enough scale to make safe navigation possible. During review of the vessel's Rose Point electronic navigational chart system, it was discovered that the program did not have a declaration of conformity required to verify compliance with electronic chart carriage standards. Vessel shall, within 30 days, ensure that if not properly maintaining paper charts and relying on electronic, the electronic chart system meets Radio Technical Commission for Maritime Services (RTCM) 1 class ‘A’.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2025
Resolved 7 July 2025
Resolution: Vessel updated electronic chart subscription of Coastal Explorer and showed evidence of Declaration of Conformity.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 9 May 2022
Resolved
VESSEL MUST BE IN SAFE AND SEAWORTHY CONDITION. FOUND POSSIBLE LEAKING THROUGH BOTTOM PLATE HULL IN ENGINE ROOMS / HOLE IN WATERTIGHT BULKHEAD SEPARATING ENGINE ROOMS. SUBMIT REPAIR PROPOSAL FOR BOTH AREAS.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2022
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 9 May 2022
Resolved
RESCUE BOAT MUST BE IN PROPER CONDITION FOR OPERATION. FOUND CRACKS IN FUEL TANK; REPAIR / REPLACE ACCORDINGLY.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2022
Resolution: Replaced fuel tank.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 9 May 2022
Resolved
VESSELS MUST PROVIDE ADEQUATE FIREFIGHTING WHEN LIFTING PORTABLE TANKS ON/OFF VESSEL. EDUCTOR WAS FOUND INOPERABLE; REPLACE ACCORDINGLY BEFORE CONDUCTING ANY OPERATIONS WITH PORTABLE TANKS ONBOARD.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 16 May 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 9 May 2022
Resolved
EMERGENCY LIGHTING MUST ACTUATE UPON MAIN LIGHTING FAILURE. FOUND 01 E-LIGHT ON (02) DECK INOPERABLE; REPAIR / REPLACE ACCORDINGLY.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 16 May 2022
Resolution: Replaced light.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 9 May 2022
Resolved
TWIST ON WIRE CONNECTIONS MUST BE IN AN ENCLOSURE / NOT BE USED TO SPLICE/EXTEND LENGTH OF CABLE. FOUND NUMEROUS CONNECTIONS NOT ENCLOSED, AS WELL AS DEAD END WIRING UNDER HELM CONSOLE. REMOVE / REPAIR ACCORDINGLY.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 18 May 2022
Resolution: Cleaned out and made permanent connections and wiring under helm console.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 May 2022
Resolved
EACH BATTERY MARKED WITH AN EXPIRATION DATE USED IN AN ITEM OF SURVIVAL EQUIPMENT MUST BE REPLACED IF THE DATE HAS PASSED. PROVE ALL BATTERY DATES OF LIFERING LIGHTS.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 16 May 2022
Resolution: Replaced batteries.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 May 2022
Resolved
MATERIALS IN PIPING SYSTEMS MUST CONFORM WITH ASTM-F 1201. FOUND NON-METALLIC FUEL STRAINERS ON ALL MDE AND
GENERATORS. REPLACE ACCORDINGLY.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2022
Resolved 16 May 2022
Resolution: Replaced filter bowls with metal conforming to ANSI standards.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 6 May 2021
Resolved
The inspection for certification is made by a marine inspector to determine whether the vessel is in a safe and seaworthy condition: shaft packing for port and starboard shafts must be adjusted to prevent excessive drop in engine rooms.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2021
Resolved 7 May 2021
Resolution: Reattended the vessel and confirmed that shaft seals were tightened to prevent excessive leaking.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 May 2021
Resolved
Electrical equipment on a vessel must be designed, installed, and maintained to provide services for safety under normal conditions; light bulb was missing in starboard engine room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2021
Resolved 7 May 2021
Resolution: Reattended the vessel and confirmed that a new light bulb was installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 May 2021
Resolved
Electrical equipment on a vessel must be designed, installed, and maintained to protect crew members from electrical hazards; dead end wires were found off of the starter for the starboard main propulsion prime mover.
Action required: 10 - Deficiency Rectified
Resolved 7 May 2021
Resolution: Dead end wires were properly contained prior to the completion of the inspsection.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 May 2021
Resolved
Each battery must be free from exposure to splash or spray of water; battery boxes for port generator and port main propulsion prime mover were filled with 02 inches of water.
Action required: 10 - Deficiency Rectified
Resolved 7 May 2021
Resolution: Battery boxes were clear of water prior to the completion of the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 May 2021
Resolved
If your vessel’s COI is renewed less often than annually, the Marine inspector must check the settings of relief valves on all pressure vessels twice every 5 years; proof of servicing relief device was not present on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2021
Resolved 7 May 2021
Resolution: Reattended the vessel and confirmed that newly installed relief devices had been installed with current servicing information.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 6 May 2021
Resolved
A vessel equipped with fixed pitch propellers must have on the navigating bridge and at the engine room control station a propeller speed and direction indicator for each shaft; port main engine tachometer was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2021
Resolved 7 May 2021
Resolution: Reattended the vessel and confirmed that shaft tachometer operated properly during propulsion check.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 6 May 2021
Resolved
Each vessel must be fitted with a compass suitable for the intended service of the vessel. Except aboard a vessel limited to daytime operation, the compass must be illuminated; compass light was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2021
Resolved 7 May 2021
Resolution: Reattended the vessel and confirmed that the magnetic compass light was operable.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 February 2020
Resolved
During operational testing of the fire pump, fire pump only had a pressure of 32 psi. Vessel was at the pier at minimum air gap. Vessel shall not sail until fire pump pressure can be verified by a attending Marine Inspector.
46cfr132.120(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 18 February 2020
Resolution: Fire Pump output was 60PSI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 11 February 2020
Resolved
Oily windings were found on the starboard generator and dusty/dirty windings were found on the port side generator. Clean both generator's windings and
identify the source of the oil on the starboard generator and report findings to the attending USCG Marine Inspector.
46CFR127.220(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 18 February 2020
Resolution: Gens were cleaned and oil was from crank case breather(corrected).
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 February 2020
Resolved
MI observed a power strip, open junctions boxes, and wire nuts that were not secure under the helm. On the STBD switch board MI observed a stuffing tube with an opening at the bottom of the switch board. Also in the STBD engine room the 36 Volt battery charger amp meter was not operating correctly. In the port engine room the DCV electrical connection on top were exposed.Vessel has 14 days to make repair to the attending MI.
46CFR129.220(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 February 2020
Resolved 18 February 2020
Resolution: electrical was in compliance
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 February 2020
Resolved
MI inspector observed hydraulic leaks coming from the jacking system. Vessel has 14 days to make repairs to the attending USCG MI.
46CFR134.150(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 February 2020
Resolved 18 February 2020
Resolution: Leaks were fixed
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 February 2020
Resolved
MI's identified wasted gasket on the 02 deck weathertight door. In addition, holes were found on the engine room watertight bulkhead. Make necessary repairs to the satisfaction of the attending USCG Marine Inspector. Vessel has 14 days to make repairs to the attending USCG MI.
46CFR127.230(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 February 2020
Resolved 18 February 2020
Resolution: new gasket was installed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 11 February 2020
Resolved
Air Receiver has a MAWP of 200, a relief valve set at 150, and the pressure gauge is maxed out at 200. Gauge is required to be 1.2-2 times the setting of the relief valve. Replace gauge with a range of 300. Vessel has 14 days to make repairs to the attending USCG MI.
46CFR126.470
46CFR54.15-5(f)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 February 2020
Resolved 18 February 2020
Resolution: New gauge (300psi) was installed.
05 - Radio Communications › N/A - No Subsystem › Reserve source of energy
Issued 20 December 2018
Resolved
Radios did not have reserve power when ship's power was secured. 46 CFR 80.860
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2019
Resolution: Reserved power 12v batteries were replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 December 2018
Resolved
Excessive oil build up on starboard generator caused by missing blow by hose. Crew to clean engine, radiator, and install hose to bed pan.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 January 2019
Resolution: Engine cleaned and blow by hose routed to bilge area.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 December 2018
Resolved
Starboard generator exhaust piping was leaking exhaust soot onto lagging. Crew to repair leak and clean lagging. 46 CFR 129.340
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 January 2019
Resolution: Cleaned and exhaust piping clamp retightened.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 December 2018
Resolved
Electrical junction box in fiddley space bulkhead was covered with duct tape. Crew to repair. 46 CFR 129.340
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 January 2019
Resolution: Obsolete junction box removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 20 December 2018
Resolved
Starboard generator switchboard hertz gauge was loose and hanging out of switchboard. Crew to repair. 46 CFR 129.330
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 January 2019
Resolution: Switchboard gauge was installed correctly.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 20 December 2018
Resolved
Port rudder angle indicator was inoperable.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 29 January 2019
Resolution: Rudder angle indicator was repaired.