Records from 2021 to 2025. Most recent: operational control imposed, 23 October 2025.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 23 October 2025
Resolved
IN MEETING THESE REQUIREMENTS, THE COMPANY SHOULD ENSURE THAT: INSPECTIONS ARE HELD AT APPROPRIATE INTERVALS; APPROPRIATE CORRECTIVE ACTION IS TAKEN; AND RECORDS OF THESE ACTIVITIES ARE MAINTAINED. THE TECHNICAL AND/OR OPERATIONAL NATURE OF DEFICIENCIES 2, 3, AND 4 PROVIDE OBJECTIVE EVIDENCE OF A SERIOUS FAILURE, OR LACK OF EFFECTIVENESS, OF THE IMPLEMENTATION OF THE ISM CODE. A SAFETY MANAGEMENT AUDIT CARRIED OUT BY THE ADMINISTRATION OR THE RO, WITH A CORRESPONDING REPORT OF FINDINGS SATISFACTORY TO THE OCMI MUST BE SUBMITTED PRIOR TO CLEARANCE OF THIS DEFICIENCY AND RELEASE FROM DETENTION.
74 SOLAS(20) IX/3.1
ISM CODE 10.2
Condition: Invalid
Action required: 30 - Ship detained
Resolved 27 October 2025
Resolution: LR Class surveyor reported an ISM audit completed by LR on behalf on Flag State.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 23 October 2025
Resolved
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. PSCO OBSERVED EXCESSIVE OIL LEAKS ON ALL 04 GENERATORS WITH MULTIPLE MAKESHIFT CONTAINMENT TRAYS, BOTTLES, AND BUCKETS TO CATCH OIL LEAKS AND MULTIPLE FUEL FILTERS IN BUCKETS OF F/O IN CLOSE PROXIMITY TO GENERATORS, PRESENTING A FIRE HAZARD AND DEMONSTRATING A LACK OF MAINTENANCE.
74 SOLAS (04)
II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 27 October 2025
Resolution: LR Class surveyor reported auxiliary engines had fuel pump top covers dismantled, changed seal rings, fuel pumps replaced, and all auxiliary engines tested without obvious leakage found. Actionable items for repair by 26JAN25.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 23 October 2025
Resolved
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. PSCO OBSERVED F/O LEAK IN PURIFIER ROOM RESULTING IN POOLED OIL ON DECK, PRESENTING A FIRE HAZARD AND DEMONSTRATING A LACK OF MAINTENANCE.
74 SOLAS (04)
II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 27 October 2025
Resolution: LR Class surveyor reported the relief valve for the fuel oil inner heater was retightened, tested and found satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 23 October 2025
Resolved
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. PSCO OBSERVED F/O LEAK FROM HFO TRANSFER PUMP IN THE ER, PRESENTING A FIRE HAZARD AND DEMONSTRATING A LACK OF MAINTENANCE.
74 SOLAS (04)
II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 27 October 2025
Resolution: LR Class surveyor reported the mechanical seal was replaced on the HFO transfer pump and found satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 23 October 2025
Resolved
THE PURPOSE OF THIS REGULATION IS TO PREVENT THE IGNITION OF COMBUSTIBLE MATERIALS OR FLAMMABLE LIQUIDS. FOR THIS PURPOSE, THE FOLLOWING FUNCTIONAL REQUIREMENTS SHALL BE MET: MEANS SHALL BE PROVIDED TO CONTROL LEAKS OF FLAMMABLE LIQUIDS. PSCO RECEIVED NOTIFICATION FROM AN NRC REPORT OF APPROXIMATELY 1.23 METRIC TONS OF HFO DISCHARGED IN THE #3 CARGO HOLD FROM CRACK IN NO.1 STBD FUEL TANK.
74 SOLAS (04)
II-2/4.1.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2025
Resolution: LR Class surveyor reported oil cleaned and the welding seam temporarily repaired with a cement box. This fuel oil tank (No.1) will be kept empty at sea monitored. Class allows this temporary arrangement until repairs by 26JAN25.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 23 October 2025
Resolved
ALL ELECTRICAL APPARATUS SHALL BE SO CONSTRUCTED AND INSTALLED AS NOT TO CAUSE INJURY WHEN HANDLED OR TOUCHED IN NORMAL MANNER. PSCO OBSERVED HYDRAULIC OIL LEAKING FROM SOLENOIDS WITHIN THE VALVE CONTROL SYSTEM ELECTRICAL PANEL.
74 SOLAS (04)
II-1/45.1.3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2025
Resolution: LR Class surveyor reported 3 solenoid valves’ O-rings were replaced, tested and found satisfactory.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 23 October 2025
Resolved
THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD, DUE TO REGARD BEING PAID TO MOVING PARTS. PSCO OBSERVED JACKET WATER LEAK ON JACKET WATER RING OF NO.1 CYLINDER.
74 SOLAS (04)
II-1/26
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 October 2025
Resolution: LR Class surveyor reported the Everllence-LAX service team replace the main engine’s No.1 unit cylinder heads water jacket, No.1 exhaust valve, and No.1 piston and liner.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 23 October 2025
Resolved
HYDRAULIC POWER-OPERATED STEERING GEAR SHALL BE PROVIDED WITH THE FOLLOWING ARRANGEMENTS TO MAINTAIN CLEANLINESS OF THE HYDRAULIC FLUID TAKING INTO CONSIDERATION THE TYPE AND DESIGN OF THE HYDRAULIC SYSTEM. PSCO OBSERVED HYDRAULIC LEAK FROM THE FWD STBD RUDDER RAM POST.
74 SOLAS (04)
II-1/29.12
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 October 2025
Resolution: LR Class surveyor reported the crew replaced and tightened the packing seal for FWD Stbd Rudder Ram Post cylinder. The Class Report retains this as an actionable item to be rectified by 26JAN25.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 23 October 2025
Resolved
THE MACHINERY, BOILERS, AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD, DUE TO REGARD BEING PAID TO MOVING PARTS. PSCO OBSERVED MISSING GUARD ON PUMP FOR THE SAMPLE SMOKE EXTRACTION SYSTEM.
74 SOLAS (04)
II-1/26
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 23 October 2025
Resolution: Replaced guard on smoke extraction system.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 23 October 2025
Resolved
ADEQUATE POWER VENTILATION SHALL BE PROVIDED IN ENCLOSED CARGO SPACES. THE ARRANGEMENT SHALL BE SUCH AS TO PROVIDE AT LEAST SIX AIR CHANGES PER HOUR IN THE CARGO SPACE. PSCO WAS NOTFIED OF BROKEN AND MISSING VENTILATION DUCTS IN CARGO HOLD NO.4.
74 SOLAS (20)
II-2/19.3.4.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2025
Resolution: LR Class surveyor reported ventilation in holds 1, 2, 3, 5, 6, and 7 in good order. No.4 cargo ventilation trunk is awaiting repairs. The vessel plans to complete repairs in China.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 1 November 2021
Resolved
Means shall be provided to control leaks of flammable liquids. excessive amounts of lube oil were observed collecting in multiple drip pans; underneath main engine.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2021
Resolved 10 January 2022
Resolution: Recieved class report attesting to the repair
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 1 November 2021
Resolved
Machinery shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts. Ballast pumps were lacking sufficient guards.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 November 2021
Resolved 10 January 2022
Resolution: Recieved class report attesting to the repair