Records from 1997 to 2026. Most recent: inspection, 30 June 2026.
Documentation record
Registered dimensions (L × B × D)56.0 ft × 22.1 ft × 8.3 ft
Registered tonnagegross 103 / net 70
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLOUIS G ORTIS BOAT CO INC · KROTZ SPRINGS, LA, UNITED STATES · built 1979
Hull materialSteel
PropulsionDiesel
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portCLAYTON, IA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 15 May 2026 · expires 31 May 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it70 - Regulatory (Subpart C or D), Net Ton
103 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 10
30 June 2026
COI Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 8412018
3 November 2025
In-Service Inspection · Drydock Exam · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Quad Cities · USCG Heartland District (CGD-H) · Activity 8262751
2 June 2025
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 8150970
6 March 2024
COI Inspection · Deficiency Check
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7861398
21 March 2023
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 7655070
20 April 2018
Administrative Inspection
Administrative · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 6395686
26 April 2015
Type not recorded
No type recorded · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 5112375
2 August 2012
Industry Initiated Exam
Physical examination · Marine Safety Detachment St. Paul · USCG Heartland District (CGD-H) · Activity 4398881
24 September 1998
Type not recorded
No type recorded · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 420784
14 November 1997
Type not recorded
No type recorded · MSD ST. PAUL · USCG Heartland District (CGD-H) · Activity 410101
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 June 2026
No resolution recorded
(b) Each towing vessel must be fitted with a general alarm that:
(1) Is activated at each operating station and can notify persons onboard in the event of an emergency;
(2) Is capable of notifying persons in any accommodation, work space, and the engine room;
(3) Has installed, in the engine room and any other area where background noise makes a general alarm hard to hear, a supplemental flashing red light that is identified with a sign that reads: “Attention General Alarm—When Alarm Sounds or Flashes Go to Your Station”
Genral alarm did not sound during op-test. Make repairs to alarm and show proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 June 2026 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 3 December 2025
Resolved
Means must be provided for... for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings into such spaces. MI observed rotten plywood ventilation closures on engine room exhaust stack. 46 CFR 144.605
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 April 2026
Resolved 30 June 2026
Resolution: Closure devices replaced with metal and shown to secure on vent openings on stack.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 3 November 2025
Resolved
When conducting an examination of a towing vessel as required by this subpart, the surveyor must determine whether any defect, deterioration, damage, or modifications of the hull and related structure and components may adversely affect the vessel's seaworthiness or fitness or suitability for its route or service. Marine inspector observed significant scaling in bow void and steering voids. Bow void was found to have wastage in excess of 75% and evidence of water intrusion through bottom plate. Port aft steering void wasted weld found shimmed and improperly repaired. Significant pitting found on side shell and bottom plate of vessel. Clean and descale voids and conduct complete UT for hull thickness of vessel side shell and bottom plate to determine extent of wastage. 46 CFR 137.325(a)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 3 November 2025
Resolved 1 December 2025
Resolution: Operator provided report of hull thickness
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 3 November 2025
Resolved
Examine the exterior of the hull, including bottom, sides, headlog, and stern, and examine all appendages for damage, fractures, wastage, pitting, or improper repairs. Submit repair proposal for wasted bottom plate on bow, port aft steering void, damaged push knees, and bow void cable transit to the satisfaction of the marine inspector. 46 CFR 137.330(a)(1)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 3 November 2025
Resolved 1 December 2025
Resolution: Shipyard will crop and renew identified areas.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 3 November 2025
Resolved
Examine the rudders for damage, the upper and lower bearings for wear, and the rudder stock for damage or wear. MI found starboard rudder bushing cap dislodged and deteriorating welds along previous repair to port and starboard rudders. Repair to the satisfaction of the MI.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 3 November 2025
Resolved 26 February 2026
Resolution: Deteriorated welds have been repaired.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 June 2025
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. Open end wires found on the Port VHF radio. Properly cap unused wires.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 June 2025
Resolved 31 July 2025
Resolution: VHF radio exposed wired capped, and taped.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 2 June 2025
Resolved
All towing vessels must have at least one properly operating handheld VHF-FM radio in addition to the radios otherwise required... Portable radio not onboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 June 2025
Resolved 17 June 2025
Resolution: Handheld radio placed in the pilot house.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 2 June 2025
Resolved
AIS must be maintained in effective operating condition... AIS was not properly transmitting vessel's position.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 June 2025
Resolved 4 June 2025
Resolution: AIS transmitting vessel position.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 March 2024
Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space and must be either: (1) Automatic, battery-operated with a duration of no less than 2 hours: or (2) non-electric, phosphorescent adhesive lighting strips that are installed along escape routes and sufficiently visible to enable egress with no power. E-lighting missing. Properly install emergency lighting/phosphorescent adhesive on the required egress routes stated.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 10 April 2024
Resolution: Emergency lighting installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 6 March 2024
Resolved
Closure devises must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. Repair all improperly installed scuttle clamping devices, and replace WTD gaskets.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 3 June 2025
Resolution: Clamping devices repaired, and gaskets renewed. Verifed on 2025 annual.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 6 March 2024
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. TIMCO alarms were not alarming in the pilot house to include: High bilge alarm, Main engline low lube oil pressure, main engine high cooling water temperature, generator low lube oil pressure, generator high cooling water temperature, low hydraulic steering fluid levels. Alarms must be visible and audible at each operating station. The alarm located at the operating station may be a summary alarm... Make repairs to all called alarm set points, and provide proof of proper function to the requirements of 46 CFR 143.230.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 April 2024
Resolved 1 July 2026
Resolution: TIMCO alarms shown to be in working order, and displaying and monitoring required set points.