MAURY USCG vessel records
← All vessels

POINT SOPHIA

POINT SOPHIA is a 2022 passenger vessel (inspected). The Coast Guard has recorded 7 inspections since 2021, most recently in April 2026, along with 20 deficiencies.

Records from 2021 to 2026. Most recent: inspection, 19 April 2026.

Built
2022
Last inspected
19 April 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 19 April 2026
Operational controls None recorded without a removal date
Years with a record 5 calendar years (2021–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDN3663
1701360
Flag
UNITED STATES
Maury page id
psix-1701360

Documentation record

Registered dimensions (L × B × D)72.2 ft × 24.9 ft × 7.8 ft
Registered tonnagegross 93 / net 75
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBAY WELDING SERVICES INC · HOMER, AK, UNITED STATES · built 2022
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portHOONAH, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 19 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it93 - Simplified, Gross Ton
75 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

7 inspections, each with its date, unit and type; 20 deficiencies with the resolution recorded against each; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 7

19 April 2026 Deficiency Check · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8352245
22 April 2025 Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 8101366
20 August 2024 Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7985093
25 April 2024 Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7900500
11 May 2023 Administrative Inspection · Internal Structural Exam · COI Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 7684607
26 April 2023 Plan Review "T" Boat · Administrative Inspection · Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7675734
27 October 2021 Plan Review "T" Boat · Construction Oversight · Initial Certification · Deadweight Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7364312

Deficiency record · 20

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 April 2026 Resolved
Bilge piping system: (c) Except when individual pumps are provided for separate spaces, individual bilge suction lines must be led to a central control point or manifold and provided with a stop valve at the control point or manifold and a check valve at some accessible point in the bilge line. A stop-check valve located at a control point or manifold will meet the requirements for both a stop valve and a check valve. Bilge manifold connected to fwd stbd crash bulkhead is leaking. Repair to satisfaction of USCG.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2026
Resolved 23 April 2026
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 19 April 2026 Resolved
Navigation lights: All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules, except that a vessel of more than 19.8 meters (65 feet) in length must also have navigation lights that meet UL 1104, “Standards for Marine Navigation Lights,” or other standard specified by the Commandant. Anchor light is wasted.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2026
Resolved 4 June 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 22 April 2025 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Port generator is in the process of replacing raw water pump impeller. Generator to be repaired to original within 7 days. 46CFR182.100
Action required: 705 - Other - as specified
Resolved 24 April 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 April 2025 Resolved
A suitable hull strainer must be installed in the circulating raw water intake line of an engine cooling water system. Port side fwd engine raw water strainer is cracked on bottom plastic casing. Replace strainer casing within 7 days. 46CFR182.420(a)(2)
Action required: 705 - Other - as specified
Resolved 24 April 2025
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 25 April 2024 Resolved
A person may not employ or engage an individual in a position required to hold an MMC unless that individual maintains a current medical certificate. [name withheld] could not show proof of a valid medical cert. Provide proof of medical cert prior to operating under MMC.
Action required: 705 - Other - as specified
Resolved 26 April 2024
Resolution: Verified valid medical certificate through REC.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 April 2024 Resolved
The owner or managing operator must provide satisfactory evidence of the required servicing to the [name withheld] fireboy pre-engineered fire suppression systems maintenance could not be verified during inspection. Provide proof of servicing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 April 2024
Resolution: Servicing completed by Southeast Extingusiher Service Inc.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 April 2024 Resolved
All escape hatches used as a means of escape must be marked on both sides in clearly legible letters at least 2" high: EMERGENCY ESCAPE, KEEP CLEAR. Engine room escape hatches not labeled in engine room. Provide proper labeling.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 28 May 2024
Resolution: Signage provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 April 2024 Resolved
Spanner wrenches must be provided where 1.5" diameter firehose is required. Spanner wrenches not provided. Provide spanner wrenches for both hose stations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 28 May 2024
Resolution: Spanner wrenches provided.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 25 April 2024 Resolved
The stability letter must be posted under glass or other suitable transparent material such that all pages are visible at the op station. Stability letter not posted at op station. Post stability letter.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 26 April 2024
Resolution: Stability letter posted in pilothouse.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 25 April 2024 Resolved
If the first aid outfit contains expiry-dated items, the date of expiry shall be marked on the outside of the container. Dates of expiration not listed on outside of container. Properly label.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 20 May 2024
Resolution: Expiry dated items were properly labeled.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 25 April 2024 Resolved
Vessel logs were not available for review at the time of inspection. Prepare/provide adequate logbook to CG MI denoting required weekly and monthly checks IAW 46 CFR subchapter T. 46 CFR 185.728, 520, 524, 702.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 28 May 2024
Resolution: Logbooks provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 May 2023 Resolved
Spanner wrenches must be provided where a 40 millimeter (1.5 inch) diameter firehose is required by § 181.320(b). Existing vessels as of July 22, 2016 have 180 days to comply with this requirement. The two fire hose stations are missing spanner wrenches. Provide spanner wrench for each 1.5 hose station. 46 CFR 181.310
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 May 2023
Resolution: Owner purchased and placed onboard two spanner wrenches one for each fire hose station - all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 May 2023 Resolved
Guards for exposed hazards. An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. The two electric bilge and fire pump couplers are exposed creating a hazard to the crew. Install guard for all pump couplings.46 CFR 177.960
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 13 May 2023
Resolution: Owner installed machinery guards over rotating couplers - all sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 May 2023 Resolved
The owner, managing operator, or a qualified servicing facility as applicable must conduct the following inspections and tests: (1) Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10 (incorporated by reference, see § 175.600 of this chapter) as amended here: (i) Certification or licensing by a state or local jurisdiction as a fire extinguisher servicing agency will be accepted by the Coast Guard as meeting the personnel certification requirements of NFPA 10 for annual maintenance and recharging of extinguishers. The portable fire extinguishers are past due for their annual service. 46 CFR 176.810
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2023
Resolution: Owner had SE Fire Extinguisher conduct annual servicing and inspection of all onboard fire fighting fixed and portable extinguishers including detectors and call points - all sat.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 11 May 2023 Resolved
Stability letter. When, in accordance with § 178.210 of this chapter, a vessel must be provided with a stability letter, the stability letter must be posted under glass or other suitable transparent material, such that all pages are visible, at the operating station of the vessel. If posting is impracticable, the stability letter must be kept on board in a weathertight container readily available for use by the crew and display to passengers and others on request. Vessel's Stability Letter is not posted properly. Post vessels stability letter at the operating station.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 May 2023
Resolution: Operator posted all pages of the vessel's stability letter in the operating station - all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 May 2023 Resolved
Each battery used in an item of lifesaving equipment, except inflatable survival craft equipment, must be replaced during the annual inspection if the expiration date of the battery has passed. The expiration date of the battery may be marked on the battery or the owner or managing operator may have a record of the expiration date from the manufacturer of a battery marked with a serial number. The batteries in the vessel buoyant float light for the life ring buoy are more than 12 months old replace with new batteries. 46 CFR 185.726
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 May 2023
Resolution: Operator replaced the batteries with new batteries and marked renewal date on the same - all sat.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 May 2023 Resolved
Portable lights Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. No portable flashlights were onboard. Provide two flashlights one for the operating station and one close to the machinery spaces. 46 CFR 183.430
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 May 2023
Resolution: Operator placed onboard two working flashlights - all sat.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 11 May 2023 Resolved
Public address systems. (a) Except as noted in paragraphs (d) and (e) below, each vessel must be equipped with a public address system. (b) On a vessel of more than 19.8 meters (65 feet) in length, the public address system must be a fixed installation and be audible during normal operating conditions throughout the accommodation spaces and all other spaces normally manned by crew members. (c) A vessel with more than one passenger deck and a vessel with overnight accommodations must have the public address system operable from the operating station. (d) On a vessel of not more than 19.8 meters (65 feet) in length, a battery powered bullhorn may serve as the public address system if audible throughout the accommodation spaces of the vessel during normal operating conditions. The bullhorn's batteries are to be continually maintained at a fully charged level by use of a battery charger or other means acceptable to the cognizant OCMI. (e) On a vessel of not more than 19.8 meters (65 feet) in length carrying not more than 49 passengers, a public address system is not required if a public announcement made from operating station without amplification can be heard throughout the accommodation spaces of the vessel during normal operating conditions, to the satisfaction of the cognizant OCMI. New vessel crew forgot how to operate the PA system. Provide training and show the PA system is working on both decks, fwd & aft. 46 CFR 184.610
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 May 2023
Resolution: Operator figured out how to use PA system and provided training to all crew members and tested - all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 11 May 2023 Resolved
Protection against hot piping. Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. Port and Stbd engine rooms there is an exposed bracket that exceeds 150 deg F that needs to be properly insulated to protect the crew from being burned.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 May 2023
Resolution: Operator installed insulation on exhaust hanger brackets - all sat.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 11 May 2023 Resolved
Emergency instructions. (a) The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. (b) Except when in the judgment of the cognizant OCMI the operation of a vessel does not present one of the hazards listed, the emergency instruction placard should contain at least the applicable portions of the “Emergency Instructions” listed in § 185.512. The emergency instructions must be designed to address the particular equipment, arrangement, and operation of each individual vessel. (c) If the cognizant OCMI determines that there is no suitable mounting surface aboard the vessel, the emergency instructions need not be posted but must be carried aboard the vessel and be available to the crew for familiarization. Update vessels emergency instructions to cover fixed fire systems onboard and provide meanes to recover a MOB onto the vessels main deck, only able to bring victim to the aft swim step. 46 CFR 185.510
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 May 2023
Resolution: Operator updated emergency procedures for fire and MOB - all sat.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.