Records in 2022. Most recent: inspection, 7 March 2022.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 7 March 2022
Resolved
Where the emergency source of electrical power is a generator, it shall be provided with a transitional source of emergency electrical power as specified in paragraph 4 unless an emergency generator is provided capable both of supplying the services mentioned in that paragraph and of being automatically started and supplying the required load as quickly as is safe and practicable subject to a maximum of 45s. PSCO observed starting batteries expired and crew experienced difficulties starting the emergency generator.
74SOLAS2020 cons. II-1/43.3.1.3
Action Taken: 60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 March 2022
Resolution: Reviewed and accepted Class NK report. EDG batteries replaced, and operational tests of EDG conducted
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 March 2022
Resolved
Batteries not marked with an expiration date may be used if they are replaced annually. PSCO observed the rescue boat and life boat batteries were manufactured in 2019 and have not been replaced.
74SOLAS20 III/34 LSA Code 1.2.3
Action Taken: 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2022
Resolution: Reviewed and accepted Class NK report. Lifeboat and rescue boat batteries replaced, and operational tests of equipment conducted
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 7 March 2022
Resolved
Compressed air breathing apparatus shall be fitted with an audible alarm and a visual or other device which will alert the user before the volume of the air in the cylinder has been reduced to no less than 200 l. PSCO observed no audible alarm on the compressed air breathing apparatus.
74SOLAS20 cons II-2/10.1.1 FSS Code 2.1.2.2
Action Taken: 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2022
Resolution: Reviewed and accepted Class NK report. SCBA batteries replaced, and operational tests of SCBA conducted
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 7 March 2022
Resolved
A main electric lighting system which shall provided illumination throughout those parts of the ship normally accessible to and used by passengers or crew shall be supplied from the main source of electrical power. PSCO observed multiple inoperable lights in the galley and on deck that did not provide adequate illumination.
74SOLAS20 cons. II-1/41.2.1
Action Taken: 17ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 March 2022
Resolution: Reviewed and accepted Class NK report. Galley and deck lights replcaed batteries replaced.
10 - Safety of Navigation › N/A - No Subsystem › Establishment of working language onboard
Issued 7 March 2022
Resolved
Simple operation instructions with a block diagram showing the change over procedures for remote steering gear control systems and steering gear power units shall be permanently displayed on the navigation bridge and in the steering compartment. PSCO observed instructions written in a language not understood by the crew.
74SOLAS20 cons V/26.3.1
Action Taken: 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 March 2022
Resolution: Reviewed and accepted Class NK report. Instructions in language understood by crew were provided.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 7 March 2022
Resolved
The company is responsible for ensuring that adequate resources and shore-based support are provided to enable the designated person or persons to carry out their functions. Objective evidence obtained with regards to deficiencies #1-4 indicate a failure of implementation of the ISM Code. Conduct ISM audit by relevant certificate issuing authority within 90 days. SOLAS 74 (a) 2020 cons. IX/3 ISM Code 3.3
74SOLAS20 cons IX/3 ISM Code 3.3
Action Taken: ac
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 10 March 2022
Resolution: Class NK issued a PR17. As vessel just changed flag, full audit to be conducted after 90 days IAW ISM Code.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 7 March 2022
Resolved
A vessel owner or operator required by 33CFR155.5035 to have a response plan shall conduct exercise as necessary to ensure that the plan will function in an emergency. Qualified individual notification exercises, must be conducted quarterly. PSCO observed QI notification were not conducted.
33CFR155.1060(a)(1)
Action Taken: 10c
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 7 March 2022
Resolution: PSCO observed captain conduct QI notifications during PSC exam