WECO PISCES

WECO PISCES is a 2022 tank ship. The Coast Guard has recorded 3 inspections since 2022, most recently in March 2025, along with 1 deficiency.

Records from 2022 to 2025. Most recent: inspection, 3 March 2025.

Built
2022
Last inspected
3 March 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 3 March 2025
Operational controls None recorded without a removal date
Years with a record 3 calendar years (2022–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9923932
9V7113
1717156
Flag
SINGAPORE
Maury page id
psix-1717156

Documentation record

Tonnage as PSIX records it49999 - Dead Weight, Metric Ton
29671 - Convention (Subpart B), Gross Ton
13723 - Convention (Subpart B), Net Ton
60251 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 3

3 March 2025 PSC B · COC-CHEM & TVE Renew
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8085171
10 September 2023 PSC B · Ballast Water Examination · COC-CHEM & TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7788580
9 June 2022 PSC A · COC-CHEM & TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7472155

Deficiency record · 1

09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 3 March 2025 Resolved
Every steam pipe and every fitting connected there to through which steam may pass shall be so designed, constructed, and installed as to withstand the maximum working stresses to which it may be subjected. PSCO observed aft condensation drain valve cracked, for deck water seal. Crew found additional drain valve cracked. Crew replaced 02 drain valves to sat of PSCO. 74 SOLAS 20 II-1 33.1
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 3 March 2025
Resolved 3 March 2025
Resolution: Crew replaced 02 valves to satisfaction of PSCO.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.