Records from 1989 to 2007. Most recent: inspection, 26 April 2007.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 26
26 April 2007
Hull Examination · Administrative Inspection · Annual Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2916364
3 August 2005
Hull Examination · COI Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2450633
29 January 2004
Periodic Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1996258
2 January 2004
Examination of Repairs
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1973738
26 November 2002
Hull Examination · Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1710859
8 November 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1370412
10 October 2000
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1399462
9 March 2000
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 816328
6 January 2000
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1372856
28 December 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 809401
9 October 1998
Examination of Repairs · COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431990
16 February 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1111828
23 January 1997
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1404301
12 December 1995
COI Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1441018
15 November 1994
Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1439567
8 September 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1174597
19 October 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1387411
19 November 1992
Hull Examination · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 963184
12 November 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1253822
21 October 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 941688
19 December 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1218923
29 November 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1230859
8 November 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 912703
1 November 1990
Deficiency Check · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1223003
1 November 1989
Initial Certification · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1237586
11 October 1989
Inclining Experiment
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 911175
Lifesaving
Issued 6 January 2000
Resolved
PROVIDE AND PROVE SATISFACTORY RESCUE BOAT AND/OR SUITABLE ALTERNATIVE AS PRESCRIBED IN [name withheld] POLICY LETTER #16113 DATED NOVEMBER 12, 1998.
Condition: Unknown
Due 6 January 2000
Resolved 6 January 2000
Deck/Cargo
Issued 9 October 1998
Resolved
CROP AND RENEW 3 GUSSETS ON P/S SPUD BEAMS.
Condition: Unknown
Due 9 October 1998
Resolved 9 October 1998
Electrical
Issued 12 December 1995
Resolved
PROVIDE DRAIN PLUG FOR OIL DRAIN LINE ON GENERATOR.
Condition: Unknown
Due 14 December 1995
Resolved 15 December 1995
Construction/Loadline
Issued 12 December 1995
Resolved
CLEAN BILGES OF ALL EXCESSIVE OIL PRODUCTS.
Condition: Unknown
Due 14 December 1995
Resolved 15 December 1995
Accommodation/Occupational Safety
Issued 12 December 1995
Resolved
FASTEN LADDER TO DECK IN ENGINEROOM.
Condition: Unknown
Due 14 December 1995
Resolved 15 December 1995
Accommodation/Occupational Safety
Issued 12 December 1995
Resolved
MAKE PERMANENT REPAIRS TO DAMAGED RAILINGS, BROKEN WELDS ON HOUSE STRUCTUREAND IN ENGINE ROOM (UNDERDECK LONGS TO DECK, SIDE LONGS TO SIDE PLATING)
Condition: Unknown
Due 14 December 1995
Resolved 15 December 1995
Electrical
Issued 12 December 1995
Resolved
PROVIDE GUARD OVER ROTATING SHAFT OF GENERATOR.
Condition: Unknown
Due 14 December 1995
Resolved 15 December 1995
Fire Fighting
Issued 12 December 1995
Resolved
REPLACE BROKEN FIRE AX.
Condition: Unknown
Due 12 December 1995
Resolved 13 December 1995
Construction/Loadline
Issued 12 December 1995
Resolved
CROP/RENEW AREA IN PILOTHOUSE WITH HOLE IN SIDE PLATING.
Condition: Unknown
Due 14 December 1995
Resolved 15 December 1995
Deck/Cargo
Issued 12 December 1995
Resolved
REPAIR ALL HYDRAULIC LEAKS ON DECK AND IN ENGINEROOM.
Condition: Unknown
Due 14 December 1995
Resolved 15 December 1995
Deck/Cargo
Issued 12 December 1995
Resolved
Remove electrical tape over hydraulic hose connection at PTU unit, make permanent repairs to hose connection.
Condition: Unknown
Due 14 December 1995
Resolved 15 December 1995
Construction/Loadline
Issued 15 November 1994
Resolved
Replace wasted engine room deck vent.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Deck/Cargo
Issued 15 November 1994
Resolved
Remove by-pass circuit from hydraulic jacking system deadman switch so thatjacking system may not be operated unless deadman switch is engaged.
Condition: Unknown
Due 1 December 1994
Resolved 18 November 1994
Construction/Loadline
Issued 15 November 1994
Resolved
Renew wasted shell and deck plating.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Engineering
Issued 15 November 1994
Resolved
Replace plastic fuel cut off connectors with metal screws/wire.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Engineering
Issued 15 November 1994
Resolved
Provide a guard for rotating engine machinery.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Fire Fighting
Issued 15 November 1994
Resolved
Show proof of servicing within last year for all fire extinguishers.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Navigation
Issued 15 November 1994
Resolved
Repair steering cable and double clamp.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Electrical
Issued 15 November 1994
Resolved
Replace or tighten all engine room globes as necessary.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Navigation
Issued 15 November 1994
Resolved
Wire all steering gear turnbuckles.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Navigation
Issued 15 November 1994
Resolved
Straighten bent nav light screens.
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Deck/Cargo
Issued 15 November 1994
Resolved
Renew crane access gasket
Condition: Unknown
Due 15 December 1994
Resolved 18 November 1994
Deck/Cargo
Issued 15 November 1994
Resolved
Prove proper operation of deadman switch.
Condition: Unknown
Due 1 December 1994
Resolved 18 November 1994
Fire Fighting
Issued 12 November 1991
Resolved
SUBMIT FOR APPROVAL A FIRE/SAFETY PLAN TO THE THE COGNIZANT [name withheld] OF SUBCHAPTER "I', 46 CFR 97.36-1
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Documentation
Issued 1 November 1990
Resolved
MAKE APPLICATION FOR AND PLACE ON BOARD VESSEL FCC RADIO STATION LICENSE FOR VHF-FM RADIO AND PLACEC COPY ON BOARD.
Condition: Unknown
Due 1 November 1990
Resolved 1 November 1990
Fire Fighting
Issued 1 November 1990
Resolved
FURNISH FIRE HOSE W/ ACCEPTABLE BRASS OR BRONZE NOZZLE.
Condition: Unknown
Due 1 November 1990
Resolved 1 November 1990
Engineering
Issued 1 November 1990
Resolved
COMPLETE PERMENANT REPAIRS TO PROPULSION ENGINE EXHAUST SYSTEM AT WASTED LOCATIONS; (1) 'L' ELBOW AT THRU DECK PIPING (2) SMALL HOLE ON OUTBOARD SIDE OF MUFFLER
Condition: Unknown
Due 1 November 1990
Resolved 1 November 1990
Construction/Loadline
Issued 1 November 1990
Resolved
COMPLETE PERMENANT REPAIRS TO THE WORK DECK AREAS (3) AS MARKED. (NOTE; ALLINSERTS REQUIRED TO BE 18"X18" W/ROUNDED CORNERS)
Condition: Unknown
Due 1 November 1990
Resolved 1 November 1990
Construction/Loadline
Issued 1 November 1990
Resolved
COMPLETE PERMENANT REPAIRS TO UNDERDECK LONGITUDINALS, FWD OF THE CRANE FOUNDATION WHERE CRACKED, ALSO REPAIR CRACKED SIDE SHELL LONG. ADJACENT TO PROPULSION ENGINE EXHAUST, PORT SIDE, AFT.
Condition: Unknown
Due 1 November 1990
Resolved 1 November 1990
Documentation
Issued 1 November 1989
Resolved
PROVIDE A COMPLETE OPERATING MANUAL IN ACCORDANCE WITH 46 CFR 109.121 FOR REVIEW TO MSO NEW ORLEANS TO FORWARD TO COMMANDANT (G-MSC). OPERATING MANUAL WILL ALSO ADDRESS USE OF HIGH-TENSILE STEELS IN CONSTRUCTION.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Documentation
Issued 1 November 1989
Resolved
PROVIDE FOR REVIEW THE FOLLOWING PLANS TO MSO NEW ORLEANS TO FORWARD TO COMMANDANT (G-MSC): GENERAL ARRANGEMENTS, INBOARD AND OUTBOARD PROFILES, STABILITY CALCULATIONS, LEG STRUCTURES, JACKING TOWER STRUCTURES, AND HYDRAULIC SYSTEMS.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Lifesaving
Issued 1 November 1989
Resolved
PROVIDE AN APPROVED RESCUE BOAT OR DEMONSTRATE AN ALTERNATIVE THAT IS ACCEPTABLE TO THE COGNIZANT OCMI.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Lifesaving
Issued 1 November 1989
Resolved
PROVIDE AN INSTANTLY-ACCESSIBLE MEANS OF EMERGENCY ESCAPE FOR THE CREW WHILE IN THE JACKED-UP CONDITION.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
PROVIDE AND DEMONSTRATE A "DEAD MAN" STOPPING FEATURE TO THE JACKING GEAR CONTROLS.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Fire Fighting
Issued 1 November 1989
Resolved
PROVIDE A PERMANENT "HARD-PIPED" INSTALLATION FOR FIREPUMP SUCTION, INCLUDING A STRAINER AND FOOT-VALVE. THIS INSTALLATION MUST ALSO ALLOW FIREPUMP SUCTION TO BE TAKEN FROM A SUCTION HOSE WHILE IN THE JACKED-UP CONDITION.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
PROVIDE A SOUND-PRODUCING BELL AS REQUIRED BY THE COLREGS.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
GAUGE BOTTOM PLATING FORWARD OF FUEL AND WATER TANKS AND PROVIDE A COPY OF EXAMINATION. PROPOSE PERMANENT REPAIRS TO HULL PLATING WASTED BEYOND ACCEPTABLE LIMITS.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Electrical
Issued 1 November 1989
Resolved
INSTALL ELECTRIC GENERATOR MAIN DISCONNECT BREAKER SWITCH AND SUPPORT CABLEUNDER DECK IN MACHINERY SPACE. ALSO PROVIDE EMERGENCY LIGHTING FOR MACHINERY SPACE.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Lifesaving
Issued 1 November 1989
Resolved
PROVIDE WEAK-LINK (CG APPROVED) FOR PRIMARY LIFE SAVING LIFEFLOAT.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Accommodation/Occupational Safety
Issued 1 November 1989
Resolved
INSTALL ASME APPROVED HOT WATER HEATER RELIEF VALVE.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Engineering
Issued 1 November 1989
Resolved
PROVIDE A 2-INCH FUEL TANK VENT WITH A FLAME SCREEN (30 X 30 MESH) FOR BOTHFLO TANKS.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
REPAIR TO ORIGINAL DESIGN THE UNDER DECK LONGITUDINAL WHERE BROKEN (FORWARDPORT).
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Engineering
Issued 1 November 1989
Resolved
PROVIDE A PERMANENTLY-MOUNTED, INSTANTLY-OPERABLE BILGE PUMP WITH STRAINER.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
PROVIDE AUDIBLE AND VISUAL ALARMS FOR JACKING GEAR FAILURE.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989