Records from 2014 to 2026. Most recent: inspection, 26 February 2026.
Inspection history · 16
26 February 2026
Administrative Inspection · Vessel Attendance · COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8306870
18 September 2025
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8237039
20 May 2024
Administrative Inspection · In-Service Inspection · Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7913847
4 March 2024
Internal Structural Exam · Deficiency Check · Administrative Inspection · Drydock Exam · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7873560
16 February 2024
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7866591
30 January 2023
COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7629322
10 January 2022
Deficiency Check
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7378176
5 October 2021
Internal Structural Exam · Deficiency Check · COI Inspection · Drydock Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7326863
9 April 2020
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6937385
1 March 2019
Annual Inspection · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6635019
7 January 2019
Internal Structural Exam · Hull Examination · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6606274
6 August 2018
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6502681
19 January 2018
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6340221
10 November 2016
Administrative Inspection · Periodic Inspection · Deficiency Check
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6039075
31 October 2016
Internal Structural Exam · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6032514
16 February 2016
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5816208
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 30 January 2023
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. Certificate of Documentation not onboard.
46 CFR 67.313 (a)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2023
Resolution: COD onboard
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 30 January 2023
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Multiple leaks found in hydraulic controls in machinery rooms, excessive oil in bilge and on machinery.
46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2023
Resolution: Replaced hydraulic controls in machinery rooms.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 30 January 2023
Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. Exhaust lagging missing in stbd side machinery space.
46 CFR 177.970
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2023
Resolution: Replaced lagging
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 January 2023
Resolved
Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all spaces located below the main deck. Emergency light INOP in port side machinery space.
46 CFR 183.432
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2023
Resolution: Emergency lights replaced and functioning properly.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 30 January 2023
Resolved
Each hatch exposed to the weather must be weathertight. Port side cabin porthole cracked.
46 CFR 171.124 (a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 March 2023
Resolution: Port side cabin porthole replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 January 2023
Resolved
The rated load test of the crane must be performed after repairs or alterations to any structural component of the crane and must be witnessed by a U.S. Coast Guard. Deficiency items found from annual inspection report. Repair and load test crane prior to crane operations.
46 CFR 107.260
Action required: 705 - Other - as specified
Resolved 10 March 2023
Resolution: Witnessed load test.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 10 January 2022
Resolved
All vessels shall be provided with not less than two avenues of escape from all general areas accessible to the passengers or where the crew may be quartered or normally employed,
so located that if one is not available the other may be. Both port and stbd E/R escape hatches were sealed closed with sealant preventing hatch from being openened. Crew instructed to remove sealant and reinstall hatch.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 10 January 2022
Resolved 10 January 2022
Resolution: Port Captain provided pictures of both hatch covers removed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 October 2021
Resolved
46 CFR 176.610 (a): All accessible parts of the hull to be examined to include propellers, shafts, bearings, rudders; Vessel to replace/ repair starboard skeg and stern tube due to excessive deterioration and damage.
Action required: 705 - Other - as specified
Due 5 October 2021
Resolved 25 October 2021
Resolution: Witnessed during topside inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 April 2020
Resolved
Fuel oil lines must meet SAEJ-1942. Fuel oil line on the port MDE was wasted.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 April 2020
Resolved 14 April 2020
Resolution: Verified F/O line replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 April 2020
Resolved
Electrical mats shall be placed in front of switchboards. Carperts placed in front of switchboards are not electrical mats are oil soaked.
Action required: 10 - Deficiency Rectified
Due 17 April 2020
Resolved 9 April 2020
Resolution: Master acquired rubber mats and placed in front of switchboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 April 2020
Resolved
Protection must be provided for hot surfaces of 150F or more. Exhaust lagging not in place on starboard MDE.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 April 2020
Resolved 14 April 2020
Resolution: lagging put in place.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 9 April 2020
Resolved
Guards shall be provided at rotating machinery. Guards were not placed around both shafts.
Action required: 10 - Deficiency Rectified
Due 17 April 2020
Resolved 9 April 2020
Resolution: Master installed protective guards aruond both shafts.
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 9 April 2020
Resolved
EPRIB test shall be conducted and logged monthly. Monthly tests have not been logged since February 2019.
Action required: 10 - Deficiency Rectified
Due 17 April 2020
Resolved 9 April 2020
Resolution: Witnessed master test EPIRB onboard during inspection and verify expiration dates for registration, battery life, and hydrostatic release.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 19 January 2018
Resolved
Voltmeter gauge inpoerable on generator pannelbpoard. Replace/ fix and provide proof to OCMI.
Action required: 705 - Other - as specified
Due 26 January 2018
Resolved 19 January 2018
Resolution: Vessel rep sent photo of repaired voltmeter
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 10 November 2016
Resolved
Machinery guard was missing on propulsion shafting. Required vessel rep to provide satisfactory machinery guards.
Due 17 November 2016
Resolved 10 November 2016
Resolution: New guard installed over propulsion shafting
Operations/Management › Mandatory Ship Reporting Systems › Entry Report
Issued 16 February 2016
Resolved
Prove proper operation of tilt alarm.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 16 February 2016
Resolved 24 February 2016
Resolution: Tested tilt alarm. all sat
Engineering › Bilge Water Management System › Pump
Issued 16 February 2016
Resolved
Prove proper operation of bilge pump.
Action required: 17 - Rectify deficiencies prior to departure
Due 16 February 2016
Resolved 24 February 2016
Resolution: witnessed proper operation of pump. all sat.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 16 February 2016
Resolved
Reepair electrical box on aft rail.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 24 February 2016
Resolution: replaced broken electrical box and rewired.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 16 February 2016
Resolved
Install blanks in breaker box under console in pilot house.
Condition: Improper/Lack of Maintenance
Due 23 February 2016
Resolved 24 February 2016
Resolution: breakers installed in electrical box.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 16 February 2016
Resolved
Install plug on the 110V outlet on bridge. (to cover hole in the side of outlet box)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 24 February 2016
Resolution: plug was installed into outlet.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 16 February 2016
Resolved
Repair E-light in engine room.
Condition: Improper/Lack of Maintenance
Due 23 February 2016
Resolved 24 February 2016
Resolution: E-light was renewed and tested sat.
Engineering › Bilge Water Management System › Strainer
Issued 16 February 2016
Resolved
Install strainers to all bilge suction points.
Condition: Improper/Lack of Maintenance
Due 23 February 2016
Resolved 24 February 2016
Resolution: bilge suction strainers have been installed on all suction pipes.
Electrical › Electric Generation Source (service) › Generator
Issued 16 February 2016
Resolved
Degrease port generator windings.
Condition: Improper Installation
Due 23 February 2016
Resolved 24 February 2016
Resolution: Generator windings has been cleaned.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 16 February 2016
Resolved
Repair stuffing tube to port generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 24 February 2016
Resolution: stuffing tube was replaced.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 16 February 2016
Resolved
Remove or terminate cable going to port generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 24 February 2016
Resolution: Cable was installed into a junction box.
Lifesaving › Buoyant Apparatus › Float-free Link
Issued 16 February 2016
Resolved
Properly attach weak link to life float and vessel.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 16 February 2016
Resolved 24 February 2016
Resolution: vessel attached weak link to vessel instead of line housing.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 16 February 2016
Resolved
Replace hydrostatic link to EPIRB with a valid one (not expired).
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 16 February 2016
Resolved 24 February 2016
Resolution: replaced with new hydrostatic release.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 February 2016
Resolved
Replace plastic wire ties with metal on STBD side of pilot house.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 23 February 2016
Resolved 24 February 2016
Resolution: plastic wire ties replaced and metal restraints have been installed.