Records from 2022 to 2024. Most recent: inspection, 26 February 2024.
Inspection history · 4
26 February 2024
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7870388
26 May 2023
Damage Survey · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7701280
24 May 2023
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7754478
2 September 2022
Initial Certification · Drydock Exam · Internal Structural Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7549350
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 November 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of person onboard under normal and emergency conditions. Prove proper operation of the port generator to the attending marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2022
Resolved 2 December 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 October 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Demonstrate proper operation of the main engines and generators for its intended service and route to the satisfaction of the attending class surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 November 2022
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 17 October 2022
Resolved
Each towing vessel must have either a self-priming, power driven, fixed fire pump, a fire main, and hoses and nozzles capable of delivering water simultaneously from the two highest hydrants of at least 344 kpa or 50 psi. Demonstrate remote start/stop of the fixed fire pump and proper operation to the satisfaction of the attending class surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 November 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 October 2022
Resolved
Essential systems or equipment must be regularly and examined. Tests and examinations must verify the system or equipment functions as designed. Demonstrate proper operations of the steering system to the satisfaction of the attending class surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 November 2022
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 17 October 2022
Resolved
Each towing vessel must carry the survival craft specified in Table 141.305 of this section, as appropriate for the towing vessel, in an aggregate capacity to accommodate the total number of individuals onboard. Install a CG approved inflatable liferaft with a free free arrangement to the satisfaction of the attending class surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 November 2022
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 17 October 2022
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. Demonstrate audible and visual alarm in the pilot house for engine room's port and starboard bilge high levels to the satisfaction of the attending class surveyor.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 November 2022
10 - Safety of Navigation › N/A - No Subsystem › Revolution counter
Issued 17 October 2022
Resolved
Each towing vessel must have a means to monitor and control the amount of thrust, rudder angle, and (if applicable) direction of thrust, at each operating station. Replace missing port engine rpm meter in the pilot house and demonstrate proper operation to the satisfaction of the attending class surveyor.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 December 2022
Resolved 3 December 2022