Records from 2023 to 2026. Most recent: inspection, 20 January 2026.
Documentation record
Registered dimensions (L × B × D)54.5 ft × 16.5 ft × 8.3 ft
Registered tonnagegross 78 / net 63
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSCARANO BOAT BUILDING INC. · ALBANY, NY, UNITED STATES · built 2023
Hull materialAluminum
PropulsionDiesel Direct
Hull shapeShip
Hull configurationTwin Hull
Hailing portPUNTA GORDA, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 6 January 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it78 - Simplified, Gross Ton
63 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 6
20 January 2026
Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 8295752
3 November 2025
Hull Examination · Administrative Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 8258114
20 February 2025
Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 8081866
21 January 2025
In-Service Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 8068866
3 January 2024
COI Inspection · Initial Certification
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7839455
11 July 2023
COI Inspection · Construction Oversight
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7739752
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 20 February 2025
Resolved
A vessel must comply with the structural design requirements of one of the standards listed below for the hull material of the vessel. Aluminum hull vessels:(1) Lloyd's Yachts and Small Craft; or(i) For a vessel of more than 30.5 meters (100 feet) in length: ABS Aluminum Vessel Rules (incorporated by reference, see 46 CFR 175.600); or(ii) For a vessel of not more than 30.5 meters (100 feet) in length: ABS Steel Vessel Rules (<61 Meters), with the appropriate conversions from the ABS Aluminum Vessel Rules; or(2) ABS High Speed Craft.
Identified a cracked weld on the aft transverse structural frame in the port steering void & a missing weld on the aft transverse structural frame in the starboard steering void.
Make permanent repairs to the satisfaction of the attending CG Marine Inspector.
46CFR177.300
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 February 2025
Resolution: Permanently repaired a cracked weld on the aft transverse structural frame in the port steering void & a missing weld on the aft transverse structural frame in the starboard steering void.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 20 February 2025
Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight.
Identified (2) non-sealed watertight bulkhead penetrations in the fuel tank void, and (2) non-sealed watertight bulkhead penetrations in the steering compartment due to deteriorated seal material. Make the watertight bulkhead penetrations watertight.
46CFR179.320
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 February 2025
Resolution: Made the watertight bulkhead penetrations watertight.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 20 February 2025
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition.
The hot water heater pressure relief valve does not have an attached flexible hose or piping to direct potential discharge to the bilge. Install a means to direct potential hot water heater relief valve discharge to the bilge.
46CFR176.830
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 February 2025
Resolution: The hot water heater pressure relief valve now has an attached flexible hose to direct potential discharge to the bilge.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 July 2023
Resolved
Marine employers shall establish programs for the chemical testing for dangerous drugs on a random basis of crew members on inspected vessels. vessel does not have a DAPI program.
46 CFR 16.230(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 January 2024
Resolution: Marine employer established chemical testing program (DAPI).
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 11 July 2023
Resolved
A vessel which, under § 178.310 of this part, complies with requirements in sub chapter S of this chapter, must have stability details on the vessel's Certificate of Inspection, a stability letter issued by the cognizant Officer in Charge, Marine Inspection (OCMI) or the Commanding Officer, Marine Safety Center, or an approved stability booklet. Vessel did not have any stability information. Conducted an incline stability test awaiting letter from MSC.
46 CFR 178.210(b)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2023
Resolution: Vessel received and posted a Stability Letter issued by MSC (H1-2304396), dated 21DEC2023.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 11 July 2023
Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Vessel is a new construction and has not conducted drills.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 January 2024
Resolution: Vessel conducted all required drills IAW 46CFR185.520.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 11 July 2023
Resolved
Stations in the maritime service must be licensed by the FCC either individually or by fleet. Vessel did not have a FCC license or a call sign. Vessel is expected to get call sign and license when in Florida.
47 CFR 80.13(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 December 2023
Resolution: Received objective evidence from O/O that vessel was issued an FCC Station License on 01DEC2023. Added call sign WDP3260 to the vessel's general information section in MISLE.