Records from 2023 to 2026. Most recent: inspection, 4 March 2026.
Documentation record
Registered dimensions (L × B × D)60.8 ft × 24.0 ft × 6.0 ft
Registered tonnagegross 30 / net 24
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSENTINEL BOAT COMPANY LLC · WETUMPKA, AL, UNITED STATES · built 2024
Hull materialFRP (Fiberglass)
PropulsionDiesel
Hull shapeShip
Hull configurationTwin Hull
Hailing portPENSACOLA BEACH, FL
Trade endorsementsCoastwise, unrestricted, Recreational
DocumentationValid · issued 6 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it30 - Simplified, Gross Ton
24 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 4
4 March 2026
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8319712
30 January 2026
Drydock Exam · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8304147
22 April 2025
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8117310
10 May 2023
Construction Oversight · COI Inspection · Deficiency Check · Administrative Inspection · Initial Certification · Inclining Experiment
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7871061
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 March 2026
Resolved
A self priming, power driven fire pump must be installed on each vessel Of not more than 19.8 meters (65 feet) in length that carries more than 49 passengers;
Vessels port fire pump was not operable, starboard fire pump could not operate without blowing the hose off the outlet side of the pump. Vessel is limited to 49 passenger.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 March 2026
Resolution: Witness operation test of fire pump. All Sat
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 12 May 2025
Resolved
Vessels described by 46CFR175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Vessel did not have installed interconnected fire detection system. Install system.
46 CFR 175.110 (c)
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 12 May 2025
Resolved 12 May 2025
Resolution: Received documentary evidence of approved interconnected fire detection system installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 May 2025
Resolved
All machinery must be installed in such a manner to afford protection from causing fire, explosion, machinery failure or personal injury. Spare fire pump is leaking from pump shaft. Make pump and piping leak free.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2025
Resolved 12 March 2026
Resolution: witness operational test of fire pump.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 12 May 2025
Resolved
A hatch exposed to the weather must be watertight. Multiple hatches were noted with debris and sand in the combing around the hatch cover compromising the watertight integrity of the hatches. Clean and make all hatches watertight.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2025
Resolved 12 May 2025
Resolution: Received documentary evidence of corrected deficiency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 May 2023
Resolved
An exposed hazard such as rotating machinery must be protected by a cover, guard, or rail. Marine Inspector noted the belts on front of each engine not covered. fabricate/install machinery guards.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 28 May 2024
Resolution: Objective evidence received of installed guards.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 10 May 2023
Resolved
The maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 1 inch numbers and letters at the entranceway to that deck. Marine Inspector observed the max capacity labeling missing from the upper deck. Label.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 28 May 2024
Resolution: Objective evidence received of installed signage.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 10 May 2023
Resolved
Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. Stability letter has not been issued for the vessel.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 May 2024
Resolved 4 June 2024
Resolution: Received approved stability letter from MSC.