MAURY USCG vessel records Sign in
← All vessels

KIRBY 11620

KIRBY 11620 is a 2023 tank barge. The Coast Guard has recorded 2 inspections since 2023, most recently in July 2025, along with 4 deficiencies.

Records from 2023 to 2025. Most recent: inspection, 1 July 2025.

Built
2023
Last inspected
1 July 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

1766545
Flag
UNITED STATES
—
Maury page id
psix-1766545

Inspections, by type

Years with a record 2 calendar years (2023–2025)
The 2 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Documentation record

Registered dimensions (L × B × D)200.0 ft × 35.0 ft × 13.0 ft
Registered tonnagegross 764 / net 764
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSOUTHWEST SHIPYARD LP · HOUSTON, TX, UNITED STATES · built 2023
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 21 October 2025 · expires 30 November 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it764 - Simplified, Net Ton
764 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 2

1 July 2025 Examination of Repairs · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8172401
15 February 2023 In-Service Inspection · Drydock Exam · Construction Oversight · COI Inspection · Deficiency Check · Cargo Tank Internal · Administrative Inspection · Internal Structural Exam · Deadweight Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7651852

Deficiency record · 4

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 15 February 2023 Resolved
The transfer procedures required by § 155.720 must contain a description of each transfer system on the vessel and procedures for topping off the tanks. Vessel transfer procedures did not include any details on using the nitrogen system on board the vessel. Vessel shall include specific details regarding the nitrogen system and how it should be used in conjunction with the cargo that will be carried on board the barge. 33 CFR 155.570
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 January 2024
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 15 February 2023 Resolved
Before any liquid or liquefied gas listed in Table 151.05 may be carried in an unmanned tank barge, the certificate of inspection issued to such barge shall be appropriately endorsed to show approval to transport such cargo. Cargo Authority Attachment (CAA) has not been issued yet and endorsement referencing such has not been included on COI. Vessel shall not conduct any cargo operations until CAA has been provided. 46 CFR 151.01-20(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 December 2023
Resolution: CAA Issued
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 15 February 2023 Resolved
All gauging devices and related fixtures which form a part of the cargo containment barrier shall be of suitable material and shall be designed for the pressure and temperature of the cargo. Vapor line pressure gauges measuring range was from 4 PSI to 4 in. Hg. High velocity pressure vacuum valve is set to 6 PSI. Install appropriate valve for the range of the HV pressure vacuum valve installed. 46 CFR 151.15-10(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 January 2024
Resolved 22 January 2024
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 15 February 2023 Resolved
The respective piping systems installed on ships and barges shall have the necessary pumps, valves, regulation valves, safety valves, relief valves, flanges, fittings, pressure gages, liquid level indicators, thermometers, etc., for safe and efficient operation of the vessel. Barge's nitrogen system was still missing metallic flexible hoses connections to the vapor line. Vessel shall installed missing connections to the vapor line in accordance with the drawings approved by Marine Safety Center (MSC). 46 CFR 56.01-1(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 January 2024

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.