Records from 2023 to 2024. Most recent: inspection, 23 December 2024.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 December 2024
No resolution recorded
Eletrical installations shall be such as to minimize the risk of fire and explosion from flammable products. PSCO observed O2 damaged explosion proof lights in heat exchanger room and 01 damaged explosion proof lights over 6S tank dome. 74 SOLAS (20) VII/10, IBC 10.1.2.1
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 January 2025 — due date passed with no resolution recorded
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 13 April 2023
No resolution recorded
Ships carrying toxic or flammable products or both shall be equipped with at least two instruments designed and calibrated for testing the specific vapours in question. If such instruments are not capable of testing for both toxic concentrations and flammable concentrations, then two separate sets of instruments shall be provided.
Vessel does not have proper tubes for detection equipment on board to be able to test for toxic vapours.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2023 — due date passed with no resolution recorded
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 April 2023
Resolved
Electrical equipment cables and wiring shall not be installed in the hazardous locations unless it conforms with the standards not inferior to those acceptable to the Organization. Electrical wiring was exposed on explosion proof light fixture above #6 starboard cargo tank.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 13 April 2023
Resolved 13 April 2023
Resolution: Vessel fixed electrical fixture.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 13 April 2023
No resolution recorded
A tank overflow control system required by this section shall come into operation when the normal tank loading procedures fail to stop the tank liquid level exceeding the normal full condition and give a visual and audible tank overflow alarm to the ships operator.
The #6 starboard tank overfill audible and visual alarm are not functioning.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 April 2023 — due date passed with no resolution recorded
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 13 April 2023
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern.
One vapor connection line on port and starboard side are missing the permanent stud.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 13 April 2023
Resolved 13 April 2023
Resolution: Vessel fixed vapor control connection to have permanent outward projecting stud.
14 - Pollution Prevention › 148 - Ballast Water › Ballast water report
Issued 13 April 2023
Resolved
The master, owner, operator, agent, or person in charge of a vessel subject to this subpart and this section must submit a ballast water report to the National Ballast Information Clearinghouse (NBIC) by electronic ballast water report format using methods specified at NBIC's Web site.
Vessel failed to submit a ballast water report to the NBIC 6 hours after entering port.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 13 April 2023
Resolved 13 April 2023
Resolution: Master submitted ballast water report to the NBIC during the exam.