Records from 1992 to 2026. Most recent: inspection, 22 July 2026.
Documentation record
Registered dimensions (L × B × D)60.4 ft × 24.0 ft × 9.8 ft
Registered tonnagegross 136 / net 93
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNICHOLS BOAT & BARGE BUILDERS INC · VANCOUVER, WA, UNITED STATES · built 1979
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORTLAND, OR
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 21 July 2026 · expires 31 July 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it93 - Regulatory (Subpart C or D), Net Ton
136 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
22 July 2026
COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8444771
8 June 2026
Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8395187
29 July 2025
Annual Inspection · DAPI Audit
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8196869
11 September 2024
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8001012
11 September 2024
Type not recorded
No type recorded · Station Cape Disappointment · USCG Northwest District (CGD-NW) · Activity 8001367
18 June 2024
Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7937895
14 May 2024
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7912391
22 March 2024
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7884756
6 November 2023
Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7820971
30 October 2023
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7816512
30 August 2023
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7781236
5 June 2023
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7703975
28 June 2022
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7485893
7 July 2021
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7248270
15 June 2021
Deficiency Check · Initial Certification
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7173917
2 March 2019
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6635170
9 June 2017
Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6175097
28 April 2014
Plan Review (Other than "T")
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4852703
8 April 2010
Deficiency Check
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3711493
7 January 2010
Industry Initiated Exam · Deficiency Check · MTSA Verification
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3659715
14 October 2002
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1690961
8 January 1997
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 5228
20 October 1992
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 118428
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 13 July 2026
No resolution recorded
46 CFR 137.300(b)(2)(3) - The cognizant OCMI may require additional examinations of the vessel whenever he or she discovers or suspects damage or deterioration to hull plating or structural members that may affect the seaworthiness or fitness for the route or service of a vessel. These examinations may include a drydock examination, including: A removal of the vessel from service to assess the extent of the damage and to affect permanent repairs or an adjustment of the drydock examination intervals to monitor the vessel's structural condition. Deep pitting was discovered behind all four keel coolers during the June / July 2026 drydock examination. Temporary clad weld repairs were performed on the deepest pits found during the gauging survey behind all four non-integral keel coolers. Dry dock interval is reduced to two years with the requirement to make permanent steel insert repairs removing all excessive corrosion and conduct a full credit drydock / internal structural examination by the next required dates on the current Certificate of Inspection to the satisfaction of the attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 July 2028
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 14 May 2024
Resolved
Each exhaust pipe from an internal combustion engine which is within reach of personnel must be insulated or otherwise guarded to prevent burns. Marine Inspector observed exhaust piping missing lagging in reach of personnel. Vessel make appropriate corrections and observation by certified marine inspector.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2024
Resolved 18 June 2024
Resolution: Vessel owner/operator installed heat guard on the exposed exhaust piping. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 June 2023
Resolved
Each exhaust pipe from an internal combustion engine which is within reach of personnel must be insulated or otherwise guarded to prevent burns. Marine Inspector observed exhaust piping missing lagging in reach of personnel. Vessel make appropriate corrections and observation by certified marine inspector.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 13 August 2023
Resolved 6 November 2023
Resolution: Received picture evidence regarding the new lagging installation on the exhaust, all sat.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 15 June 2021
Resolved
The following list of items must be recorded in the TVR or official logbook: (1) Personnel records; (6) Navigation assessment. Vessel has not been recording personnel records or navigation assessments in the official logbook. Vessel must provide record of satisfactory log entries in 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2021
Resolved 7 July 2021
Resolution: Received and reviewed official logs with required entries, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 June 2021
Resolved
Pressure vessels over 5 cubic feet in volume and over 15 psi MAWP must be equipped with one or more spring-loaded relief valves. Port start air compressor and associated piping is able to be isolated via closure valve and does not have a means of pressure relief. Vessel must install pressure relieving device or provide proof of internal bypass capabilities of the compressor.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2021
Resolved 17 June 2021
Resolution: Vessel installed a pressure relief valve on the compressor.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 June 2021
Resolved
Pressure vessel relief valves must be tested twice every 5 years, with no more than 3 years elapsing since last test. Port and starboard start air tank and starboard start air compressor relief valves were last tested in 2015. Vessel must provide proof of current test or installation of new relief valves.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 July 2021
Resolved 17 June 2021
Resolution: Vessel provided videos of pressure relief valves reliving at the rated pressure while running the start air tanks up to pressure with the installed compressors.