← All vessels
MAPLE WISDOM
MAPLE WISDOM is a 2023 freight ship. The Coast Guard has recorded 1 inspection in 2024, along with 2 deficiencies — 1 with no resolution recorded —.
Records in 2024. Most recent: inspection, 10 December 2024.
- Built
- 2023
- Last inspected
- 10 December 2024
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 2 recorded · 1 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9964663 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
VRVS8
1810915
Flag
HONG KONG
—
Maury page id
psix-1810915
Inspections, by type
Years with a record
1 calendar year (2024)
The 1 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it44560 - Convention (Subpart B), Gross Ton
27152 - Convention (Subpart B), Net Ton
27152 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Inspection history · 1
10 December 2024
PSC A
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8045504
Deficiency record · 2
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 December 2024
No resolution recorded
If a steam pipe or fitting may receive steam from any source at a higher pressure than that for which it is designed a suitable reducing valve, relief valve and pressure guage shall be fitted. PSCO observed a steam leak from the cascade tank temperature control valve sensor. 74SOLAS20 II-1/33
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 December 2024
Resolved
The purpose of this regulation is to contain a fire in the space of origin. For this purpose, the following functional requirements shall be met; the fire integrity of the divisions shall be maintained at openings and penetrations. PSCO observed door 214, leading into the galley, was not self closing, limiting the fire integrity of the ship. 74SOLAS20 II-2/9.1.3
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.