← All vessels
GULF HUWAYLAT
GULF HUWAYLAT is a 2008 tank ship. The Coast Guard has recorded 9 inspections since 2024, most recently in July 2026, along with 3 deficiencies.
Records from 2024 to 2026. Most recent: inspection, 31 July 2026.
- Built
- 2008
- Last inspected
- 31 July 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 3 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9359870 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
3ERY5
1816668
Flag
PANAMA
—
Maury page id
psix-1816668
Inspections, by type
The 9 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it56206 - Displacement, Ton
29791 - Convention (Subpart B), Gross Ton
45967 - Dead Weight, Ton
12086 - Convention (Subpart B), Net Ton
29791 - Convention (Subpart B), Gross Ton
45967 - Dead Weight, Ton
12086 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 9
31 July 2026
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8451238
28 June 2026
PSC B · COC-CHEM & TVE Renew
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8412204
4 May 2026
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8361393
23 March 2026
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8330427
12 March 2026
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8325461
22 August 2025
PSC B · COC-CHEM & TVE Annual
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8212448
24 October 2024
Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8025222
14 July 2024
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7957669
21 June 2024
COC-CHEM & TVE Renew · PSC A
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7937627
Deficiency record · 3
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 28 June 2026
Resolved
The protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the requirements of the FSS Code. The operation of the first non-return device shall be automatically executed. PSCO observed operation of valve was only available in manual mode.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 24 October 2024
Resolved
To discharge ballast water into the waters of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a), use an AMS as described in 151.2025(a)(3), or ballast
with water from a U.S. public water system, according to the schedule in paragraph (b) of this section.
Subject vessel, of keel laid date 12AUG2008 and ballast water capacity of 23154 m3, is past its compliance date per the implementation schedule in 33 CFR 151.2035 (b). Currently, vessel’s installed BWTS is inoperative.
Vessel is not authorized to discharge untreated ballast into the waters of the U.S. without prior written authorization from the local Captain of the Port under the provisions of 33 CFR 151.2040 (b).
33CFR151.2035
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 21 June 2024
Resolved
Each vapor connection flange must have a permanent stud projecting outword, located at the top of the flange face, midway between boltholes and in line with the bolthole pattern. PSCO observed required stud missing from both of the vessels vapor lines. 46 CFR 39.2001(j)
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.