← All vessels
VALIANT SAPPHIRE
VALIANT SAPPHIRE is a 2023 freight ship. The Coast Guard has recorded 1 inspection in 2026, along with 2 deficiencies.
Records in 2026. Most recent: inspection, 10 February 2026.
- Built
- 2023
- Last inspected
- 10 February 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 2 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9969716 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
9V8996
1819338
Flag
SINGAPORE
—
Maury page id
psix-1819338
Inspections, by type
Years with a record
1 calendar year (2026)
The 1 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it35908 - Convention (Subpart B), Gross Ton
63646 - Dead Weight, Metric Ton
75277 - Displacement, Metric Ton
21205 - Convention (Subpart B), Net Ton
63646 - Dead Weight, Metric Ton
75277 - Displacement, Metric Ton
21205 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. Reports.
Inspection history · 1
10 February 2026
PSC A · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8305229
Deficiency record · 2
11 - Life Saving Appliances › N/A - No Subsystem › Stowage of rescue boats
Issued 10 February 2026
Resolved
74SOLAS III/14.1
Rescue boats shall be stowed in a state of continuous readiness for launching in not more than 5 minutes. PSCO identified unsafe launching procedure due to crew competency with rescue boat davit/hooks. Crew was unable to launch boat within 5 minutes.
74 SOLAS (CONS)
III/14.1
PTD
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Resources and personnel
Issued 10 February 2026
Resolved
The company should establish procedures to ensure that the ship is maintained in accordance with the provisions of the relevant rules and regulations established by the company. The operational nature of the deficiency noted above provides objective evidence of a serious failure of the implementation of the ISM Code. An internal audit report satisfactory to the OCMI must be submitted within 90 days.
74 SOLAS IX/3 ISM Code 10.1
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.