Records from 2024 to 2025. Most recent: inspection, 8 November 2025.
Inspection history · 4
8 November 2025
COC-GAS Renew · PSC B
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8262695
8 November 2025
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8266033
11 November 2024
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8033241
27 June 2024
PSC A · Ballast Water Examination · COC-GAS Renew · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7943583
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 June 2024
Resolved
ESD valves in liquid piping systems shall close fully and smoothly within 30 seconds of actuation.
PSCO observed excessive amount of time for the control air to bleed prior to ESD activation. ESD valves time to close is approximately 1 minute.
74 SOLAS (20) VII/13.1
IGC Code (16) 18.10.2.1.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 June 2024
Resolution: Crew was using the incorrect method to activate the ESD at the manifold locations. Crew made adjustments to valve closure time.
01 - Certificates & Documentation › 013 - Documents › Endorsement of cargo booklet
Issued 28 June 2024
Resolved
The ship shall be provided with copies of suitably detailed cargo system operation manuals approved by the administration such that trained personnel can safely operate the ship with due regard to the hazards and properties of the cargoes that are permitted to be carried.
PSCO observed ship's cargo operations manual with no approval.
74 SOLAS (20) VII/13.1
IGC Code (16) 18.2.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 July 2024
Resolution: Receieved updated Cargo Operations Manual showing approval by Class. See attached document.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 28 June 2024
Resolved
General arrangement plans shall be permanently exhibited for the guidance of ships officers, showing clearly for each deck...means of access to different compartments.
PSCO observed a missing A-60 door on the fire control plan from the fire control room into the gymnasium.
74 SOLAS (20) II-2/15.2.4.1
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 5 July 2024
Resolution: Receieved updated Fire Control Plan from Class showing previously missing A-60 door leading from Fire Control Room to Gymnasium. See attached document.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 28 June 2024
Resolved
PRV's shall be set and sealed by the administration or recognized organization acting on its behalf, and a recored of this action, including the valve's set pressure, shall be retained on board the ship.
PSCO observed set and seal certificate missing cargo deck tank information.
74 SOLAS (20) VII/13.1
IGC Code (16) 8.2.6
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 July 2024
Resolution: Receieved and accepted set and seal certificate from Class. See attached document.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 28 June 2024
Resolved
Fire doors shall be self-closing and be capable of with an angle of inclination of up to 3.5° opposing closure.
PSCO observed A-60 door leading from fire locker to gymnasium unable to fully close without assistance.
74 SOLAS (20) II-2/9.4.1.1.5.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 June 2024
Resolution: Crew adjusted door return pressure and successfully corrected door closure.