MAURY USCG vessel records
← All vessels

BLUEFIN

BLUEFIN is a 1980 freight ship. The Coast Guard has recorded 25 inspections since 2016, most recently in March 2026, along with 90 deficiencies, 1 operational control and 2 casualty investigations between 2002 and 2005.

Records from 2002 to 2026. Most recent: inspection, 24 March 2026.

Built
1980
Last inspected
24 March 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the recorded names, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 24 March 2026
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8036586
WDC7379
183670
Flag
UNITED STATES
Maury page id
psix-183670

Documentation record

Registered dimensions (L × B × D)164.2 ft × 38.0 ft × 26.8 ft
Registered tonnagegross 496 / net 358
ITC dimensions (L × B × D)164.2 ft × 38.0 ft × 26.8 ft
ITC tonnagegross 1,080 / net 407
BuilderBENDER WELDING & MACHINE · MOBILE, AL, UNITED STATES · built 1980
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSEATTLE, WA
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 19 November 2025 · expires 31 December 2026
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it358 - Regulatory (Subpart C or D), Net Ton
407 - Convention (Subpart B), Net Ton
496 - Regulatory (Subpart C or D), Gross Ton
1080 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

25 inspections, each with its date, unit and type; 90 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; 1 other recorded name, with years; 2 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 25

24 March 2026 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8331467
23 February 2026 Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8305924
1 December 2025 Vessel Attendance · Internal Structural Exam · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8261570
28 March 2025 Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8101539
24 January 2025 Annual Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8069583
23 October 2024 Administrative Inspection · Deficiency Check · Re-Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8023603
8 May 2024 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7908723
25 January 2024 Annual Inspection · MARPOL Annex VI Survey · MTSA/ISPS Verification · MARPOL Annex I Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7855863
13 December 2023 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7835919
1 February 2023 MTSA/ISPS Verification · MARPOL Annex VI Survey · COI Inspection · MARPOL Annex I Examination
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7623834
14 September 2022 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7559145
12 July 2022 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7504598
7 March 2022 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 7407415
1 February 2022 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7390028
25 October 2021 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7339465
20 October 2021 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7368539
3 August 2021 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7275793
17 February 2021 MTSA/ISPS Verification · MARPOL Annex VI Survey · MARPOL Annex I Examination · COI Inspection · MARPOL Annex IV Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7136570
1 January 2021 Hull Examination · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7121243
20 February 2020 Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6909454
17 October 2018 Internal Structural Exam · Administrative Inspection · Annual Inspection · Drydock Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6559503
28 February 2018 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6363313
11 December 2017 Annual Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6320942
12 December 2016 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6056460
24 February 2016 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5819638

Deficiency record · 90

04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 28 January 2025 Resolved
Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he or she deems necessary to be assured of the seaworthiness of the vessel. Vessel was unable to preform fire, man overboard, and abandon ship drill due to crew availability. 46CFR 91.27-15
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2025
Resolved 20 March 2025
Resolution: Vessel satisfactorily demonstrated crew competency for required MOB, Abandon ship, and Fire Drill. All Sat
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 28 January 2025 Resolved
Fire plans and booklets shall be kept up to date, any alterations being recorded theron as soon as practicable. The fire control plan did not correlate with the arrangements on board the vessel. SOLAS (74) II-2 Reg 4
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2025
Resolved 20 March 2025
Resolution: Vessel provided updated Fire Control Plan and updated placement of EEBD to provide access to crew birthing fwd of the galley space.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 January 2025 Resolved
Each panel board switching unit must have a circuit directory that has the circuit designation of each circuit. The switchboard panel on bridge was not updated to the current circuit arrangement. 46CFR 111.40-11
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2025
Resolved 12 March 2025
Resolution: Updated switchboard panel circuit directory.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 28 January 2025 Resolved
Ships shall carry a line throwing appliance of an approved type. The appliance shall include not less than four projectiles and four lines. Only 1 charge was observed on board the vessel at time of inspection. SOLAS (74) III Reg 23
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2025
Resolved 12 March 2025
Resolution: Verfied satisfactory arrangement (04) of line throwing appliances.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 28 January 2025 Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls, alarms, power sources, transfer override arrangements, interlocks, and safety controls. Systems addressed must include fire detection and extinguishing, flooding safety, propulsion, maneuvering, electric power generation and distribution, and emergency internal communications. The testing procedure to verify back up power was in use for the fire detection system needs to be updated to correspond with system. 46CFR 61.40-6
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2025
Resolved 20 March 2025
Resolution: Conducted testing for loss of power alarm to the fire detection system. System indicated a loss of power approximately 4 mins after breaker was powered off, IAW manufacture spec. All Sat.
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage
Issued 28 January 2025 Resolved
Each discharge to sea or to a reception facility shall be promptly recorded in the garbage record book and the entry for each discharge or incineration shall include the date and time, position of the ship, category of the garbage and the estimated amounted discharged or incinerated. The garbage record book entries did not correlate with the garbage receipts from the reception facility that received the garbage on 01JUL2024. Approx. 2 cubic meters of garbage was unaccounted for in the garbage record book and the date of discharge was different from what the garbage receipt indicated. MARPOL (2017 cons) Annex V Reg 10.3.1.2
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 28 January 2025
Resolved 28 January 2025
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 24 January 2025 Resolved
Each operation described in paragraph 2 of this regulation shall be fully recorded without delay in the Oil Record Book Part I, so that all entries in the book appropriate to that operation are completed. Vessel did not record accurate entries.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 28 January 2025
Resolved 28 January 2025
Resolution: Deficiency rectified after informing Chief Engineer and Master of correct procedures for recording entries.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 January 2025 Resolved
Manual alternate control systems must - be readily accessible and operable. Emergency stop on STBD Aux Gen inoperable.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2025
Resolved 20 March 2025
Resolution: Tested emergency stop on STBD Aux Generator. All Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 January 2025 Resolved
All vessels except unmanned barges must be provided with a satisfactory bilge pumping plant capable of pumping from and draining any watertight compartment except for ballast, oil, and water tanks. The bilge pumping system must be capable of operation under all practicable conditions after a casualty whether the ship is upright or listed. Bilge pump in E/R leaking at seal when operated. Repair to satisfactory condition.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 28 February 2025
Resolved 12 March 2025
Resolution: Pump seal replaced and verified satisfactory pump operation.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 24 January 2025 Resolved
In a space described in § 113.25-9(a), where the general emergency alarm signal cannot be heard over the background noise, there must be a red-flashing light or rotating beacon, in addition to the general emergency alarm signal, that: Is activated whenever the general emergency alarm signal in the space are activated. Red-flashing light or rotating beacon not activated when general emergency alarm is activated.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2025
Resolved 12 March 2025
Resolution: Witnessed satisfactory operation of general emergency alarm in E/R.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 January 2025 Resolved
The door of each panel board enclosure that is accessible to any passenger must have a locking device. 02 panel boards in E/R utilizing unauthorized securing devices.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2025
Resolved 12 March 2025
Resolution: Verfied satisfactory securing devices on panel doors.
09 - Working and Living Conditions › 092 - Working Conditions › Obstruction/slipping, etc.
Issued 24 January 2025 Resolved
Nothing in this subpart shall be construed as limiting the inspector from making such tests or inspections as he or she deems necessary to be assured of the safety and seaworthiness of the vessel. Loose deck plating in E/R creating unsafe tripping hazard. 46 CFR 91.25-50(a)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 February 2025
Resolved 12 March 2025
Resolution: Verified secured deck plating in E/R.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 January 2025 Resolved
Each pressure vessel, other than one exempted by this section, must be subjected to a hydrostatic test at a pressure of 1 1/4 times the maximum allowable working pressure twice within any five-year period, except that no more than three years may elapse between any test and its immediate predecessor. Unable to satisfactorily examine pressure vessels (02) internally.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 February 2025
Resolved 12 March 2025
Resolution: Conducted satisfactory hydrostatic tests of 02 pressure vessels to 125% of MAWP.
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 25 January 2024 Resolved
All ships of 150GT and upwards shall be fitted with a daylight signaling lamp, or other means, to communicate by light during the day. Vessel does not have a daytime signaling lamp. SOLAS 74 (2020) CH. 5 Reg 2.2.2
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 20 February 2024
Resolution: Provided objective evidence of signal lamp purchase
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 25 January 2024 Resolved
Each vessel must have suitable pilot boarding equipment available for use on each side of the vessel with a pilot ladder approved under 46 CFR 163.003. The vessel did not have suitable pilot boarding equipment or a pilot ladder of an approved type.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 7 February 2024
Resolution: Received objective evidence that a pilot ladder has been ordered.
01 - Certificates & Documentation › 011 - Ships Certificates › Continuous synopsis record
Issued 25 January 2024 Resolved
Every ship to which Chapter I applies shall be issued a Continuous Synopsis Record. The vessel's CSR lists them as having a Class Society when they are not a classed vessel. SOLAS 74 (2020) CH XI-I, Reg 5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 March 2024
Resolved 20 February 2024
Resolution: Updated CSR to reflect that vessel is not classed
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 January 2024 Resolved
Complete but simple instructions for the operations of systems must be located in a conspicuous place. The instructions for the machinery space CO2 system are incorrectly written.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 20 February 2024
Resolution: Provided objective evidence that CO2 instructions were written correctly for the system.
11 - Life Saving Appliances › N/A - No Subsystem › Marine Evacuation System
Issued 25 January 2024 Resolved
Every inflatable liferaft shall be serviced at intervals not exceeding 12 months. Annual servicing was improperly marked on life raft. Servicing label extends beyond 12 months since service date. SOLAS 74 (2020) CH III, Reg 8.1.1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 7 February 2024
Resolution: Life raft servicing reflects 12 month period.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 25 January 2024 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work. The vessel does not have an up-to-date general arrangement plan, subdivision and stability plan, fire control plan, marine engineering plan, electrical engineering plan, embarkation plan, or navigation bridge visibility plan.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2024
Resolved 23 October 2024
Resolution: Reviewed approval letter for general arrangements from MSC. Walked plan in it's entirety to confirm accuracy.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 January 2024 Resolved
Update automation test procedures to capture the additional required alarm and safeties for approval.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2024
Resolved 23 October 2024
Resolution: Reviewed MSC approval letter for fire alarms. Visually inspected alarms to confirm accuracy.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 January 2024 Resolved
Detectors, manual alarm stations, control panels, alarms, and other notifying devices must be of approved types. Vessel's detectors, manual alarm stations, control panels, and alarms are not approved by MSC.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 April 2024
Resolved 23 October 2024
Resolution: Reviewed MSC approval letter for alarms. Inspected and walked the system to confirm installations.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 25 January 2024 Resolved
Each circuit that supplies a device on a switchboard must have overcurrent protection. Amperage mismatch on aft distribution panel for aft flood light.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 20 February 2024
Resolution: Provided objective evidence that the deficiency was rectified.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 January 2024 Resolved
Each opening through which a conductor enters must be closed. Overhead junction box has conductors protruding out of enclosure.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 24 February 2024
Resolved 12 February 2024
Resolution: Junction box properly mounted.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 January 2024 Resolved
Each outlet or junction box must be securely attached to its mounting and be affixed so as to maintain its designated degree of protection. Junction box found to be hanging above port ladder well in engine space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 12 February 2024
Resolution: Junction box properly mounted.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 25 January 2024 Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Fuel pressure sensor on #1 SSDG needs to be repaired in accordance with manufacturer's specifications.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 12 February 2024
Resolution: Replaced fuel pressure gauge
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 25 January 2024 Resolved
Oil filtering equipment shall be provided with alarm arrangements to indicate oil content does not exceed 15 parts per million (PPM) when this level cannot be maintained. During testing of oil filtering equipment, only an indicating light was noted when simulating the equipment exceeding 15 PPM. There was no alarm. MARPOL I/14.7
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 February 2024
Resolved 20 February 2024
Resolution: Attending inspectors witnessed successful test of the audio alarm.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 February 2023 Resolved
Detectors, manual alarm stations, control panels, cabinets, alarms, and other notifying devices must be of approved types. Vessel's detectors, manual alarm stations, control panels, cabinets, alarms, and other notifying devices have not been approved by MSC. In addition, current system does not match the vessel's alarm checklist IAW 46 CFR 95.05-1 which sends you to 46 CFR 76.27-5(a).
Action required: 705 - Other - as specified
Resolved 26 January 2024
Resolution: Clearing legacy deficiency and adding to new inspection.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 1 February 2023 Resolved
On CO2 systems in which the CO2 cylinders are not within the protected space, these instructions must also include a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate. Vessel does not have a schematic diagram of the system and instructions detailing alternate methods of discharging the system should the manual release or stop valve controls fail to operate next to its CO2 system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2023
Resolved 25 January 2024
Resolution: Vessel has appropriate CO2 diagrams.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Technical files and if applicable, monitoring manual
Issued 1 February 2023 Resolved
Every marine diesel engine installed on board a ship shall be provided with a Technical File. The Technical File shall be prepared by the engine manufacturer and approved by the Administration, and required to accompany an engine throughout its life on board ships. IAW MARPOL Annex VI Reg 13.8 and NOx Technical Code 2008.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2023
Resolved 23 October 2024
Resolution: Reviewed technical files and EIAPP for applicable engines.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Ozone-depleting substances
Issued 1 February 2023 Resolved
Each ship subject to reg 6.1 that has rechargeable systems that contain ozone-depleting substances shall maintain an ozone-depleting substances record book.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2023
Resolved 28 March 2025
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 1 February 2022 Resolved
There are multiple wire penetrations throughout vessel in bulkheads intended to be watertight. Rectify penetrations identified throughout vessel to make watertight IAW the vessel's stability booklet.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 February 2022
Resolution: Verified all watertight bulkhead penetrations were properly made watertight.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 1 February 2022 Resolved
Except as provided in paragraph (d) of this section, after loading and prior to departure and at all other times necessary to assure the safety of the vessel, the master or person in charge shall determine that the vessel complies with all applicable stability requirements in the vessel's trim and stability book, stability letter, Certificate of Inspection, and Load Line Certificate, as the case may be. Prior to next intended voyage, illustrate stability calculations to an attending CG Marine Inspector as per the vessel's stability book.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2022
Resolution: Crew demonstrated stability calculations for the vessel with the current load and explained how they will account for added cargo during intended voyage.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 1 February 2022 Resolved
Fire, man overboard, and abandon ship drills to be conducted prior to next intended voyage with the attendance of a CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 February 2022
Resolution: Conducted fire, MOB, and abandon ship drills to the satisfaction of attending MI's.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 1 February 2022 Resolved
Each alleyway, stairway, and exit giving access to a muster and embarkation station must be adequately illuminated by lighting that is capable of having its power supplied by the vessel's emergency source of electrical power. Provide emergency lighting in way of embarkation location.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 22 February 2022
Resolution: Lighting was installed at each embarkation station.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 1 February 2022 Resolved
Replace fire hose located in engine room.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 3 February 2022
Resolution: Hose replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 1 February 2022 Resolved
Rescue boat navigation light detached. Repair as appropriate IAW 46 CFR 160.156.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 22 February 2022
Resolution: Navigation light was installed and functioning on rescue boat.
09 - Working and Living Conditions › 091 - Living Conditions › Ventilation (Accommodation)
Issued 1 February 2022 Resolved
All enclosed spaces within the vessel shall be properly vented or ventilated. Means shall be provided to close off all vents and ventilators. Vents in accommodation spaces are missing vent covers and ability to close.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 22 February 2022
Resolution: Proper vent covers were installed in each accommodation space.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 1 February 2022 Resolved
Prove the proper operation of the pilothouse steering control system. Jarring and erratic rudder movement was noted during the operational test from the pilothouse full followup control.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 February 2022
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 1 February 2022 Resolved
Prove the accuracy of the rudder angel indicating system. The pilot house indicator had a deviation of more than 10 degrees from the rudder position.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 February 2022 Resolved
Prove the proper operation of the bilge and ballast system. The fixed system was unable to obtain suction from all areas served. IAW 46 CFR 56.50-50, 55, 57
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 February 2022
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 February 2022 Resolved
Prove the proper operation of the sea chest's skin valve. It was seized in an open position.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 February 2022 Resolved
Replace all nonmetallic piping in way of the fuel oil supply and transfer system in excess of 30" and not installed for flexibility.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 February 2022 Resolved
Replace the failed pressure relief for the center start air tank. The relief failed to reset after testing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 February 2022
Resolved 22 February 2022
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 February 2022 Resolved
Remove the temporary hose installed on the A-frame case drain into the HPU located in the aft machinery space and provide permanent piping and proper penetrations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 February 2022
Resolved 22 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 1 February 2022 Resolved
Replace the deteriorated bilge strainer located in the centerline forward engine room.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 22 February 2022
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 17 February 2021 Resolved
Domestic oceans/coastwise vessels of more than 400 GRT must have an approved OWS. The installed OWS continually failed in an alarm condition. Prove proper operation of the OWS and provide proof of the 5-year OCM calibration. 33 CFR 155.360
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 18 February 2021
Resolved 26 February 2021
Resolution: Vessel was able to provide an operational test of the OWS
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil fuel tank protection
Issued 17 February 2021 Resolved
Repair and prove the proper operation of the inoperative STBD day-tank F/O shut-off valve. 46 CFR 56.50-75
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 18 February 2021
Resolved 26 February 2021
Resolution: F/O shut-off valve now operates correctly
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 17 February 2021 Resolved
The 1FEB2016 to Present Oil Record Book was missing weekly soundings of the sludge tank (last 9JUN2017), disposal of oily waste was entered under the part II (J) designation for cargo and no reception facility receipts were available. 33 CFR 151
Condition: Invalid
Action required: 30 - Ship detained
Due 18 February 2021
Resolved 26 February 2021
Resolution: Vessel has new ORB and made all required entries
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 February 2021 Resolved
The electronic propulsion control system is feed from a single 24vdc power source. The secondary means is a AC to DC power supply/charge however the main feeder panel is feed solely from the battery bank. Failure of the secondary source (batteries) resulted in a lost of propulsion while the primary system was available. Prove independent operation of the primary and secondary power system. 46 CFR 58.05-10 46 CFR 62.30(c)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 26 February 2021
Resolution: System tested and operates as intended
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 17 February 2021 Resolved
Repair the cavitating No.2 steer gear hydraulic pump. 46 CFR 58.25-10
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 26 February 2021
Resolution: New steering pump installed and tested.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 17 February 2021 Resolved
Repair the faulted electric engine order telegraph system. 46 CFR 113.35-7
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 22 February 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 17 February 2021 Resolved
Secure and properly support the e-lighting batteries located above the engine room egress ladder. 46 CFR 111.15-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2021
Resolved 28 May 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 17 February 2021 Resolved
Conspicuously place a “discharge of oil prohibited” placard at the bilge water overboard discharge outlets and pump controls. 33 CFR 155.450
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2021
Resolved 28 May 2021
Resolution: Placard installed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 17 February 2021 Resolved
Provide an updated circuit designation to include equipment served and rating of each over current device on the main switch board. 46 CFR 111.40-11
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2021
Resolved 28 May 2021
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 17 February 2021 Resolved
Each emergency communication system (sound power phone) in the machinery space must be in a type 2 NEMA or IP 22 enclosure. The head set in the main machinery space was stored openly and headset was missing out of the auxiliary machinery space (steering gear room). A booth or other equipment must be provided in a noisy location to permit reliable voice communication. No sound dampening device was installed in way of the steering gear hydraulic control unit located in the main machinery space. Each sound power phone connection box must be type 4 or 4X NEMA or IP 56. The current installation consists of a single cable with terminals. 46 CFR 113.30-25
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 22 February 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 February 2021 Resolved
Each diesel engine must be provided with overspeed and low lube oil safety auto-shutdowns. The provided technician exclaimed the Cummins (2008) MDEs were not set-up. 46 CFR 58.05-10
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 3 February 2022
08 - Alarms › N/A - No Subsystem › Steering gear alarm
Issued 17 February 2021 Resolved
An audible and visual alarm indicating a loss of phase, motor overload, and low oil for the steering system is required in the machinery space. Provide alarms. 46 CFR 58.25-25
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 13 December 2021
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 17 February 2021 Resolved
Access to the steering compartment is through a duct tunnel and not readily accessible and the steering gear hydraulic units are located in the main machinery space. Steering gear compartments must be readily accessible and the steering gear hydraulic units are required to be installed outside the main machinery space. 46 CFR 58.25-40
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 13 December 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 17 February 2021 Resolved
Provide a means to process bilge water from the forward bow thruster compartment and the after steering gear compartment through the OWS or a means to discharge oily water from these compartments to a reception facility. The OWS only takes suction from the main machinery space and the common bilge system only provides overboard discharge. 33 CFR 155.360
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2021
Resolved 28 May 2021
Resolution: OWS installed in forward space.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 February 2021 Resolved
Update automation test procedures to capture the additional required alarm and safeties for approval. 46 CFR 15.825
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 26 January 2024
Resolution: Clearing legacy deficiency and adding to new inspection with updated timeline.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 17 February 2021 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work except as modified by 46CFR91.45-1. The general scope of the plans shall be noted in 91.55-5. The vessel does not have a up to date General Arrangement Plan, Subdivision and stability Plan, Fire Control Plan (to include HALON activation and shutdowns procedures), Marine Engineering Plan, Electrical Engineering Plan, Lifesaving Equipment (Embarkation plan) and Crew Accommodations or Navigation Bridge Visibility. 46 CFR 91.55-5a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 25 September 2024
Resolution: Clearing legacy deficiency and adding to new inspection with updated timelines. See MISLE activity 7855863.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Hospital accommodation (Sickbay)
Issued 17 February 2021 Resolved
Each vessel which in the ordinary course of its trade makes voyages of more than 3 days duration between ports and which carries a crew of 12 or more, must be provided with a hospital space. 46 CFR 92.20-35 a
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2021
Resolved 28 May 2021
Resolution: Vessel does not carry a crew of 12 or more IAW COI.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 17 February 2021 Resolved
Each watertight door which is in a required subdivision bulkhead, an indicator light must be installed in the pilothouse and at each other vessel operating station from which the door is not visible. WTDs do not have any indicator to show if they are open of closed. 46 CFR 170.270 e
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 20 October 2021
Resolution: This damage stability requirements are not applicable IAW 46 CFR Subpart J.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 17 February 2021 Resolved
Each Class 1 door must have a quick action closing device operative from both sides of the door. All WTD require 6 dogs to be secured. 46 CFR170.270 a
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 20 October 2021
Resolution: This damage stability requirements are not applicable IAW 46 CFR Subpart J.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 February 2021 Resolved
Electric installations on vessels must (1)ensure maintenance of services necessary for safety under normal and emergency conditions and (2) the protection of passengers, crew and other persons from electrical hazards. Inspectors noted countless dead end cables, improper plastic brackets, missing supports, improper installations of junction box and cable penetrations. 46 CFR 111.01-1 a
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 March 2021
Resolved 28 May 2021
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 17 February 2021 Resolved
The items listed in 46CFR160.041-4(b) shall be in the first-aid kit. Random medicine kits on board were found to have expired meds. Eye was stations were found to have expired eyewash. 46 CFR 160.041-4 b
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 26 February 2021
Resolution: New med kits on board
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 17 February 2021 Resolved
Each vessel must have an amplifier-type announcing system that will supplement the general emergency alarm. If a decentralized-type system is used, its overall performance must not be affected by the failure of a single call station. Vessels laud hailer has not operated in years. 46 CFR 113.50-5 a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 March 2021
Resolved 22 February 2022
Resolution: Vessel has installed a public address system.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 17 February 2021 Resolved
Each launching station, or each two adjacent launching stations, must have an embarkation ladder as follows: (1) Each embarkation ladder must be approved under approval series 160.117 or be a rope ladder approved under approval series 160.017.(2) Each embarkation ladder must extend in a single length from the deck to the waterline with the vessel in its lightest seagoing condition under unfavorable conditions of trim and with the vessel listed not less than 15 degrees either way. 3) Provided that there is at least one embarkation ladder on each side of the vessel, the OCMI may permit additional embarkation ladders to be other approved devices that provide safe and rapid access to survival craft in the water. (4) The OCMI may accept other safe and effective means of embarkation for use with a life raft required under § 199.261(e). Vessel does not have sufficient embarkation ladders. 46 CFR 199.110 f
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 26 February 2021
Resolution: Vessel has 02 new embarkation ladders
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 17 February 2021 Resolved
After loading and prior to departure and at all other times necessary to assure the safety of the vessel, the master or person in charge shall determine that the vessel complies with all applicable stability requirements in the vessel's trim and stability book, stability letter, Certificate of Inspection, and Load Line Certificate, as the case may be. The vessel may not depart until it is in compliance with these requirements. Crew has not been ensuring the vessel's stability prior to sailing, as per the stability book. 46 CFR 97.15-7
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 27 February 2021
Resolution: Vessel was able to provide an accurate sability calc.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 February 2021 Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order. The pull tab on the fire blanket, located in the galley was found unattached. 46 CFR 199.190 a
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 26 February 2021
Resolution: Vessel has new fire blanket
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 17 February 2021 Resolved
Each vessel must carry not less than 12 rocket parachute flares, stowed on or near the bridge. Vessel did not have the correct Distress signals on the bridge. 46 CFR 199.60 c
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 26 February 2021
Resolution: Vessel has required flares
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 17 February 2021 Resolved
Lifesaving appliances and arrangements are subject to Initial inspection test in 199.45 a, whenever a wire fall for a launching appliance is replaced or turned end to end. The rescue boat's falls were renewed and must be tested (110%) prior to getting underway. 46 CFR 199.60 C 1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 18 February 2021
Resolved 18 February 2021
Resolution: Received certicate of test from Arxcis, attesting to the dynamic and static load test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 January 2019 Resolved
Both generators must be fitted with nameplates made of corrosion resistant material that contain all of the information required in ABS Steel Vessel Rules section 4-8-3. This eficiency must be rectified in 45 days.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 February 2019
Resolved 6 February 2019
Resolution: received picture of new nameplate
Operations/Management › Drills/Instruction › Not Conducted
Issued 11 December 2017 Resolved
Complete drills, security, and other remaining inspection items with Coast Guard inspector. 46 CFR 91.27-1.
Action required: 705 - Other - as specified
Due 15 January 2018
Resolved 12 January 2018
Resolution: Drills conducted to the satisfaction of Marine Inspector.
Lifesaving › Lifebuoys › Serviceable
Issued 11 December 2017 Resolved
Replace 05 ring buoys, as well as the O-rings and lines as needed. 74 SOLAS III/31.
Due 15 January 2018
Resolved 12 January 2018
Resolution: Life buoys replaced to the satisfaction of Marine Inspector.
Construction/Loadline › Structures › Deck Plating
Issued 11 December 2017 Resolved
6" penetration from reefer room into office requires boundary (space protected by CO2). Remove wire and repair/fill as necessary. 46 CFR 92.07-10.
Due 15 January 2018
Resolved 12 January 2018
Resolution: Repaired to the satisfaction of Marine Inspector.
Fire Fighting › International Shore Connection › Not on Board
Issued 11 December 2017 Resolved
Acquire International Shore Connection. Apply correct placard and stencil. FSS Code 2.2.2.
Action required: 705 - Other - as specified
Due 15 January 2018
Resolved 12 January 2018
Resolution: Installed to the satisfaction of Marine Inspector.
Engineering › Fuel Oil Storage/Transfer System › Manifold
Issued 11 December 2017 Resolved
Acquire Standard Discharge Connection.
Due 15 January 2018
Resolved 12 January 2018
Resolution: Installed to the satisfaction of Marine Inspector.
Electrical › Electrical Distribution System (emergency) › Cable
Issued 11 December 2017 Resolved
Replace/repair cables as needed for the Emgcy Light Batteries in focsle. 74SOLAS97 II-1/5.3.
Due 15 January 2018
Resolved 12 January 2018
Resolution: Repaired to the satisfaction of Marine Inspector.
Construction/Loadline › Hull › Transverse Frame
Issued 11 December 2017 Resolved
Repair cracked frame on STBD side near stairwell in lowerhold. 46 CFR 98.01-10.
Due 15 January 2018
Resolved 12 January 2018
Resolution: Repaired to the satisfaction of Marine Inspector.
Stability › Freeing Ports › General
Issued 11 December 2017 Resolved
Rework freeing port flaps, allowing proper drainage.
Due 15 January 2018
Resolved 12 January 2018
Resolution: Repaired to the satisfaction of Marine Inspector.
Navigation › Piloting/Steering › Deviation Table/Graph
Issued 11 December 2017 Resolved
Update Deviation Table. 46 CFR 96.17.
Due 15 January 2018
Resolved 12 January 2018
Resolution: Compass swung to the satisfaction of Marine Inspector.
Engineering › Lubricating Oil Service System › Hose
Issued 11 December 2017 Resolved
Installed nonmetallic flexible hose for lube oil on generators is not in accordance with SAE J1942. Replace with hose that is in accordance with SAE J1942. 46 CFR 56.60-25.
Due 15 January 2018
Resolved 12 January 2018
Resolution: Installed to the satisfaction of Marine Inspector.
Communications › Internal Communications System › Engine Order Telegraph System
Issued 11 December 2017 Resolved
Install Engine Order Telegraph in accordance with Sub J requirements. 46 CFR 96.05-1. 46 CFR 113.35.
Action required: 705 - Other - as specified
Due 15 February 2018
Resolved 16 April 2018
Resolution: Wiring Diagram approved by MSC. All sat.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 12 December 2016 Resolved
Make deck watertight between galley and bow thruster corridor in way of drain from ice machine and wood around the two pipes into the space, prior to sailing.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 19 December 2016
Resolved 30 December 2016
Resolution: The deck was made watertight between the galley and bow thruster in way of the ice machine drain by installing a collar around cabling and sealing with fire rated packing.
Electrical › Lighting (service) › Lighting Fixture
Issued 12 December 2016 Resolved
Provide proper duel light source for navigation lights, prior to sailing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 December 2016
Resolution: New duel light source navigation lights were installed and tested. All Sat.
Documentation › Certificates/Documents › Annex VI Statement of Voluntary Compliance
Issued 12 December 2016 Resolved
Provide a Ship Efficiency Management Plan, prior to sailing foreign. MARPOL Annex VI Reg. 22.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 19 December 2016
Resolution: Vessel's Rep provided a Ship Energy Efficiency Management Plan.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 12 December 2016 Resolved
Make cable penetrations in the forward E/R bulkhead in way of door watertight, prior to sailing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 December 2016
Resolution: Cable penetrations in the forward E/R bulkhead were made watertight by sealing with fire rated packing.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 12 December 2016 Resolved
Provided OWS oil content meter calibration certificate, prior to sailing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 December 2016
Resolution: Chief Engineer provided meter calibration certificate for newly installed OWS unit.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 12 December 2016 Resolved
perform operational test of OWS in the presence of USCG Marine Inspector, prior to sailing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 December 2016
Resolution: Chief Engineer performed satisfactory operational test of the OWS system.

Casualty record · 2

26 December 2002Routine · role: Involved in a Marine Casualty · 1 injured · activity 1729861
9 February 2005Routine · role: Involved in a Marine Casualty · 1 injured · activity 2296451
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

SALLY J (2002). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.