Records from 2025 to 2026. Most recent: inspection, 20 January 2026.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2026
Resolved
The closing time of the bunkering station liquid fill valve shall close at no greater than 5 seconds. Valve closed in 10 seconds. 74 SOLAS (20) II-1/57; IGF Code (2016) 16.7.3.7
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2026
Resolved 25 January 2026
Resolution: PSCO received Class Report accepting the extended closing time of the bunker valve based on pressure surge considerations IAW IGF Code 8.5.8.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2026
Resolved
The bunkering station shall be located on open deck so that sufficient natural ventilation is provided. Closed or semi-closed bunkering stations shall be subject to special consideration within the risk assessment. Vessel has a semi-enclosed bunker station that is not addressed in the risk assessment. 74 SOLAS (20) II-1/57; IGF Code (2016) 8.3.1.1
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 February 2026
Resolved 20 January 2026
Resolution: PSCO received Class Risk Assessment for LNG fueled Pure Car Carrier addressing the hazards associated with a semi-enclosed bunker station.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2026
Resolved
If the fuel supply is shutoff due to activation of an automatic valve, the fuel supply shall not be opened until the reason for diconnection is ascertained. A readily visible notice giving instruction to this effect shall be placed at the operating station for the shutoff valves in the fuel machinery space. Ship does not have sign posted. 74 SOLAS (20) II-1/57; IGF Code (2016) 15.11.1
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2026
Resolved 20 January 2026
Resolution: PSCO received Class Survey Report and photographs confirming the notices regarding fuel supply shutoff by an automatic valve have been permanently posted in the ECR, E/R, and GPR entrance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2026
Resolved
If a fuel leak leading to a fuel supply shutdown occurs, the fuel supply shall not be operated until the leak has been found and dealt with. Instructions to this effect shall be placed in a prominent position in the machinery space. Ship does not have sign posted. 74 SOLAS (20) II-1/57; IGF Code (2016) 15.11.2
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2026
Resolved 20 January 2026
Resolution: PSCO received Class Survey Report and photographs confirming the notices regarding fuel supply shutoff by a fuel leak have been permanently posted in the ECR, E/R, and GPR entrance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2026
Resolved
A caution placard to signboard shall be permanently fitted in the machinery space containing gas-fueled engines stating that heavy lifting, implying danger of damage to the fuel pipes, shall not be done when the engine(s) is running. Ship does not have sign posted. 74 SOLAS (20) II-1/57; IGF Code (2016) 15.11.3
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2026
Resolved 20 January 2026
Resolution: PSCO received Class Survey Report and photographs confirming heavy lifting caution placards have been permanently posted in the ECR, E/R, and GPR entrance.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 January 2026
Resolved
A fuel system schematic/piping and instrumentation diagram (P&ID) shall be reproduced and permanently mounted in the ship's bunkering control station and at the bunker station. P&ID is not posted at the bunkering control station. 74 SOLAS (20) II-1/57; IGF Code (2016) 18.4.2.2
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 January 2026
Resolved 20 January 2026
Resolution: PSCO received Class Survey Report confirming the P&ID is permanently mounted at the bunkering control station (ECR).