MAURY USCG vessel records Sign in
← All vessels

RIDLEY

RIDLEY is a 1980 passenger vessel (inspected). The Coast Guard has recorded 23 inspections since 1992, most recently in June 2021, along with 29 deficiencies and 1 casualty investigation in 2007.

Records from 1992 to 2021. Most recent: inspection, 14 June 2021.

Built
1980
Last inspected
14 June 2021
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDA5149
185631
Flag
UNITED STATES
366817010, 367584470 (licence lapsed)
Maury page id
psix-185631

Inspections, by type

…with no type recorded5
Years with a record 13 calendar years (1992–2021)
The 23 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 5 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)54.6 ft × 16.1 ft × 7.3 ft
Registered tonnagegross 33 / net 22
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTHOMPSON TRAWLERS,INC · TITUSVILLE, FL, UNITED STATES · built 1980
Hull materialFRP (Fiberglass)
PropulsionNot recorded
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORT ISABEL, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 3 December 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formunknown (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it33 - Regulatory (Subpart C or D), Gross Ton
22 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDG9115MMSI 367584470 · expired · compulsorily equipped · granted 24 July 2013, cancelled 23 September 2023
WDA5149MMSI 366817010 · expired · compulsorily equipped · granted 28 June 2001, cancelled 3 September 2011
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

CROWN STAR Towing Vessel · MISLE 195941 · 21 March 2007 · activity 2893010LONESTAR GYPSY Commercial Fishing Vessel · MISLE 242299 · 13 May 1992 · activity 44571

Inspection history · 23

14 June 2021 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7225083
22 August 2014 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4965813
19 January 2012 Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4224556
22 August 2011 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4095179
16 February 2010 Plan Review "T" Boat
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3685217
26 January 2010 Hull Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3664399
25 February 2009 Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3423645
5 August 2008 Simplified Stability Test
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3269896
8 April 2008 Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3180108
28 January 2008 Hull Examination
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 3137687
5 September 2007 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3050104
1 May 2007 Deficiency Check
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2919668
6 April 2007 Administrative Inspection · COI Inspection · Simplified Stability Test
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2905331
22 March 2007 Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2892993
21 March 2007 Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2893010
14 March 2007 Simplified Stability Test · Annual Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2888127
27 February 2006 COI Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2594748
10 February 2006 Hull Examination
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2580765
11 August 2004 Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2162878
13 July 2001 Initial Certification
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1471436
2 November 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 662117
9 June 1992 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 662118
13 May 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 44571

Deficiency record · 29

Engineering › Fuel Oil Service System › Valve
Issued 22 August 2011 Resolved
Replace fuel shut-off valve.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 August 2011
Resolved 24 August 2011
Resolution: Replaced to the satisfaction of the attending Marine Inspector.
Engineering › Diesel Engine (propulsion-electric) › Crankshaft
Issued 22 August 2011 Resolved
Install machinery guard on engine and generator.
Action required: 705 - Other - as specified
Due 6 September 2011
Resolved 19 January 2012
Resolution: Guard installed.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (air intake)
Issued 22 August 2011 Resolved
Cap generator intake to the hull.
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 August 2011
Resolved 24 August 2011
Resolution: Properly capped to the satisfaction of the attending Marine Inspector.
Engineering › Fuel Oil Service System › Filter
Issued 22 August 2011 Resolved
Provide a flame sheild on the lube oil filter.
Action required: 705 - Other - as specified
Due 6 September 2011
Resolved 19 January 2012
Engineering › Fuel Oil Service System › Gauge
Issued 22 August 2011 Resolved
Provide/install protective rods for fuel tank sight glass.
Action required: 705 - Other - as specified
Due 6 September 2011
Resolved 19 January 2012
Resolution: Protective covering provided.
Engineering › Fuel Oil Service System › Hose
Issued 22 August 2011 Resolved
Cap oil drainage hose.
Action required: 705 - Other - as specified
Due 7 September 2011
Resolved 24 August 2011
Resolution: Capped.
Electrical › Electrical Distribution System (service) › Fuse
Issued 22 August 2011 Resolved
Install protective covers on all fuse boxes.
Action required: 705 - Other - as specified
Due 6 September 2011
Resolved 28 February 2012
Resolution: Plastic cover installed.
Engineering › Diesel Engine (propulsion-electric) › Air-flex Clutch
Issued 22 August 2011 Resolved
Repair intake leak on engine.
Action required: 705 - Other - as specified
Due 6 September 2011
Resolved 24 August 2011
Resolution: Repaired.
Lifesaving › Buoyant Apparatus › Lifeline
Issued 22 August 2011 Resolved
Replace lines, reflective tape, and battery on life ring and light.
Action required: 705 - Other - as specified
Due 6 September 2011
Resolved 19 January 2012
Resolution: All replaced satisfactorily.
Navigation › Piloting/Steering › Marine Charts
Issued 22 August 2011 Resolved
Provide updated charts and publications.
Action required: 705 - Other - as specified
Due 6 September 2011
Resolved 19 January 2012
Resolution: Updated publications.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Automatic Heat Detectors
Issued 22 August 2011 Resolved
Properly test Fireboy system in the presence of a Marine Inspector.
Action required: 705 - Other - as specified
Due 6 September 2011
Resolved 19 January 2012
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 25 February 2009 Resolved
Install machinery guard on shaft.
Action required: 705 - Other - as specified
Resolved 11 March 2009
Resolution: Installed.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 25 February 2009 Resolved
Provide current publications for tides and currents.
Action required: 705 - Other - as specified
Resolved 11 March 2009
Resolution: Provided.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 14 March 2007 Resolved
Prove crew/company are part of a chemical testing program.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 January 2008
Resolution: Compnay able to prove chemical testing requirements.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 14 March 2007 Resolved
Post original COI
Action required: 705 - Other - as specified
Due 1 April 2007
Resolved 21 March 2007
Resolution: Original COI posted
Communications › Radio Communications › VHF Radiotelephone
Issued 14 March 2007 Resolved
Provide valid FCC safety certificate.
Action required: 705 - Other - as specified
Due 1 April 2007
Resolved 21 March 2007
Resolution: Vsl has submitted to and rcvd the FCC Safety Radio Installation cert.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 14 March 2007 Resolved
Properly mark vsl (stern markings) as per COD requirements.
Action required: 705 - Other - as specified
Due 1 April 2007
Resolved 28 January 2008
Resolution: Properly marked
Stability › Incline Test › General
Issued 14 March 2007 Resolved
Remove canopy while carrying passengers or provide stability letter adding the new canopy and a protected route. Updated: Vsl failed simplified stability test. Provide Naval Architect Incline Stability results to MSC for a "Partially Protected" route stability letter. Vsl not to carry passengers until approve stability ltr has been received and cleared by USCG resident insp.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 January 2008
Resolution: MSU Galveston accepted Stability Test with a reduced route and conditions.
Engineering › Bilge Water Management System › Valve
Issued 14 March 2007 Resolved
Install positive shutoff valve for all overboard bilge discharges.
Action required: 705 - Other - as specified
Due 1 April 2007
Resolved 21 March 2007
Resolution: Visually verified by MI
Construction/Loadline › Hull › Side Shell
Issued 14 March 2007 Resolved
Make permanent repairs to damaged aft stbd stern area at deck & below deck line, 1 ft above water line. Prior to carrying passengers.
Action required: 705 - Other - as specified
Resolved 10 April 2007
Resolution: Proper repairs were made to damaged areas.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 14 March 2007 Resolved
Prove proper operation of all eng throttles. Prior to carrying passengers.
Action required: 705 - Other - as specified
Resolved 10 April 2007
Resolution: Proper operation to eng throttles were proved.
Engineering › Sea-water System (primary cooling) › Piping
Issued 27 February 2006 Resolved
Renew saltwater supply hose for engine exhaust cooling.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 17 March 2006
Resolution: New hose installed
Engineering › Sea-water System (primary cooling) › Piping
Issued 27 February 2006 Resolved
Double clamp all saltwater supply hoses.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 17 March 2006
Resolution: Clamps
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 27 February 2006 Resolved
Provide strainers for propulsion engine cooling water supply.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 17 March 2006
Resolution: New strainers installed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 27 February 2006 Resolved
Provide liners for battery boxes.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 17 March 2006
Resolution: Operator installed standard battery boxed inside existing wood frames
Engineering › Fuel Oil Service System › Valve, Control
Issued 27 February 2006 Resolved
Properly secure fuel shutoff reach rod with metallic material.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 17 March 2006
Electrical › Electric Supply System (service) › Cable
Issued 27 February 2006 Resolved
Provide metallic hangers for all electic cables and hoses.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 17 March 2006
Resolution: Required hangers installed
Engineering › Bilge Water Management System › Pump
Issued 27 February 2006 Resolved
Provide required bilge system.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 17 March 2006
Resolution: Bilge pump installed in aft ice hold. Waiver request is being submitted for forward hold.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 27 February 2006 Resolved
Install vertical filament lights in all navigational screens IAW Inland Navigational Rules Annex I, Reg 84.09.
Action required: 705 - Other - as specified
Due 21 March 2006
Resolved 17 March 2006
Resolution: New light installed

Casualty record · 1

21 March 2007Routine · role: Involved in a Marine Casualty · activity 2893010
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

KARMA (2007). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.