MAURY USCG vessel records
← All vessels

MONARCA I

MONARCA I is a 2005 tank ship. The Coast Guard has recorded 1 inspection in 2025, along with 13 deficiencies and 1 operational control.

Records in 2025. Most recent: operational control imposed, 15 November 2025.

Built
2005
Last inspected
15 November 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 15 November 2025
Operational controls None recorded without a removal date
Years with a record 1 calendar year (2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9460409
3E8720
1883029
Flag
PANAMA
Maury page id
psix-1883029

Documentation record

Tonnage as PSIX records it2951 - Convention (Subpart B), Gross Ton
4900 - Dead Weight, Ton
1556 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 1

15 November 2025 PSC A · Deficiency Check · COC-TVE Renew
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 8261948

Deficiency record · 13

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 15 November 2025 Resolved
The company should identify equipment and technical systems the sudden operational failure of which may result in hazardous situations. The safety management system should provide for specific measures should include the regular testing of stand-by arrangements and equipment of technical systems that are not in continuous use. The vessel provided completed weekly checklist for the emergency fire pump, but they do not document any actual testing of the pump. The emergency fire pump was inoperable. Recommend an external audit.
Action required: 30 - Ship detained
Resolved 24 November 2025
Resolution: VERIFIED CLASS REPORT AND CORRECTIONS IN PERSON.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 November 2025 Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. The emergency fire pump was inoperable.
Action required: 30 - Ship detained
Resolved 24 November 2025
Resolution: VERIFIED CLASS REPORT AND CORRECTIONS IN PERSON.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 November 2025 Resolved
Stairways and lift trunks which penetrate more than a single deck shall be surrounded by at least "A-0" class divisions and be protected by self-closing doors at all levels. The deck level stairway door was missing completely and 02 additional stairway doors were held open using hold back deices in the main stairway.
Action required: 30 - Ship detained
Resolved 24 November 2025
Resolution: Changed to code 15.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 15 November 2025 Resolved
Emergency escape breathing devices shall comply with the Fire Safety Systems Code. PSCO found 02 EEBDs in the engine room that were depleted.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 November 2025
Resolution: VERIFIED CLASS REPORT AND CORRECTIONS IN PERSON.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 15 November 2025 Resolved
Tankers shall be equipped with at least one portable instrument for measuring oxygen and one for measuring flammable vapour concentrations, together with a sufficient set of spares. PSCO observed only one portable instrument onboard and only one calibration gas bottle.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 November 2025
Resolution: Vessel acquired spare 4 gas and span gas.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 15 November 2025 Resolved
Each cargo tank of a tankship must be equipped with an intrinsically safe high level alarm and a tank overfill alarm. PSCO observed tank overfill alarms for #1 and #2 slop tanks, #1 stbd, #3 port, and #5 port cargo tanks were inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 November 2025
Resolution: VERIFIED CLASS REPORT AND CORRECTIONS IN PERSON.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 15 November 2025 Resolved
Whenever an accident occurs to a ship or a defect is discovered, either of which affects the safety of the ship or the efficiency or completeness of its life-saving appliances or other equipment, the master or owner of the ship shall report at the earliest opportunity to the Administration, the nominated surveyor or recognized organization responsible for issueing the relevant certificate, who shall cause investigations to be initiated to determine whether a survey, as required by regulations 7,8,9, or 10 is necessary. PSCO observed escape hatch in steering room overhead unable to be closed.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 November 2025
Resolution: VERIFIED CLASS REPORT AND CORRECTIONS IN PERSON.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 15 November 2025 Resolved
Whenever an accident occurs to a ship or a defect is discovered, either of which affects the safety of the ship or the efficiency or completeness of its life-saving appliances or other equipment, the master or owner of the ship shall report at the earliest opportunity to the Administration, the nominated surveyor or recognized organization responsible for issuing the relevant certificate, who shall cause investigations to be initiated to determine whether a survey, as required by regulations 7,8,9, or 10 is necessary. PSCO observed crew cabin porthole on stbd side of the ship missing external and internal cover.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 November 2025
Resolution: VERIFIED CLASS REPORT AND CORRECTIONS IN PERSON.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 15 November 2025 Resolved
All items of lifeboat equipment, shall be secure within the lifeboat by lashings, storage in lockers or compartments, storage brackets or similar mountings arrangements or other suitable means. PSCO observed the lifeboat equipment was not secured by any arrangement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2025
Resolved 24 November 2025
Resolution: VERIFIED CLASS REPORT AND CORRECTIONS IN PERSON.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 15 November 2025 Resolved
Fire Extinguishers shall be situated ready for use at easily visible places, which can be reached quickly and easily at any time in the event of a fire, and in such a way that their serviceability is not impaired by the weather, vibration, or external factors. PSCO observed the fire extinguishers in the battery room, lifeboat, rescue boat, and cargo pump room were not secured or mounted in brackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2025
Resolved 24 November 2025
Resolution: VERIFIED CLASS REPORT AND CORRECTIONS IN PERSON.
09 - Working and Living Conditions › 092 - Working Conditions › Other (working space ILO)
Issued 15 November 2025 Resolved
Cylinders used for containing hazardous ships' stores that are compressed gases must be Filled, marked, and inspected in accordance with 49 CFR 173.301 through 173.308. Cylinders must always be secured and, when not in use, they must be stowed in a rack in an upright position, with the valve protection cap in place. Lockers or housings must be vented to the open air near the top and bottom for positive circulation of vapors. Cylinders must be protected from all sources of heat which may cause the cylinders to be heated to a temperature higher than 130 °F. PSCO found two cylinders of compressed gas unsecured, missing the valves protection caps, and no markings for identification.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 November 2025
Resolved 26 November 2025
Resolution: Verified photographic evidence of installation.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 November 2025 Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. PSCO observed the main fire pump was initially inoperable, but after 30 minutes was satisfactorily tested with sufficient pressure.
Action required: 10 - Deficiency Rectified
Resolved 16 November 2025
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 November 2025 Resolved
Stairways and lift trunks which penetrate more than a single deck shall be surrounded by at least "A-0" class divisions and be protected by self-closing doors at all levels. The deck level stairway door was missing completely and 02 additional stairway doors were held open using hold back devices in the main stairway.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 17 February 2026
Resolution: Verified repairs in Class Confirmation Letter

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.