AMADEUS PEARL

AMADEUS PEARL is a 2024 public freight. The Coast Guard has recorded 3 inspections in 2025, along with 10 deficiencies and 1 operational control.

Records in 2025. Most recent: inspection, 11 October 2025.

Built
2024
Last inspected
11 October 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

9995844
CQ2126
1885709
Flag
PORTUGAL
Maury page id
psix-1885709

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspections, by type

Years with a record 1 calendar year (2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Tonnage as PSIX records it2518 - Convention (Subpart B), Gross Ton
3811 - Dead Weight, Metric Ton
5048 - Displacement, Metric Ton
1423 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its Coast Guard record spans fewer than two calendar years. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 3

11 October 2025 Explosive Handling Operation-Commercial
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 8246936
4 October 2025 Deficiency Check · In-Service Inspection · PSC A · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8244212
30 September 2025 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8244166

Deficiency record · 10

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 8 October 2025 Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with additional requirements which may be established by the company. Due to the deficiencies of a technical and/or operational nature identified below which individually or collectively provides objective evidence or a serious failure, or lack of effectiveness of the ISM code, an external audit shall be conducted by the Flag Administration or the Recognized Organization (RO) before vessel will be released from its detention to determine whether vessel is operating in compliance with the ISM code. A copy of the completed external audit shall be provided for USCG review prior to departure from the port of Mobile. 74SOLAS (20) IX/3.1 ISM Code Part A/10.1
Action required: 30 - Ship detained
Due 8 October 2025
Resolved 20 October 2025
Resolution: Received internal and external ISM audit from RO and Company. Uploaded into MISLE
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 8 October 2025 Resolved
A main source of electrical power of sufficient capacity to supply all those services mentioned in SOLAS II-1/40.1.1 shall be provided. The main source of electrical power shall consist of at least two generating sets. PSCO found that the No. 2 generator set is inoperative due to a faulty logic screen. 74SOLAS(20) II-1/41.1.1
Action required: 17 - Rectify deficiencies prior to departure
Due 8 October 2025
Resolved 15 October 2025
Resolution: Witnessed operation of No.2 Auxiliary Generator under a loaded condition and found to be in good working order.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 October 2025 Resolved
Ships shall be designed constructed and maintained in compliance with the structural, mechanical and electrical requirements of a classification society. PSCO observed a PLC failure alarm for the steering system on the main alarm panel. SOLAS 74 (20) II-1/3-1
Action required: 17 - Rectify deficiencies prior to departure
Due 8 October 2025
Resolved 15 October 2025
Resolution: PSCO observed PLC failure alarm for the steering system on the main alarm panel was rectified. Witnessed steering gear test and system was found to be in good working order.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 8 October 2025 Resolved
Fire protection systems shall be kept in good order and readily available for immediate use. PSCO found fire detection faults and cargo hold smoke detection system faults on the main alarm panel. 74SOLAS(20) II-2/14.2.1.2
Action required: 17 - Rectify deficiencies prior to departure
Due 8 October 2025
Resolved 15 October 2025
Resolution: PSCO observed fire detection faults and cargo hold smoke detection system faults on the main alarm panel were rectified. Witnessed testing of fire detection and cargo hold smoke detection system and system was found to be in good working order.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 October 2025 Resolved
Ships shall be design constructed and maintained in compliance with the structural, mechanical and electrical requirements of a classification society. PSCO observed 36 communications failure alarm conditions on the main alarm panel including Modbus, Generator, Main Engine, Distribution Panels, and various sensors on the main alarm panel for the steering system on the main alarm panel on the bridge. 74SOLAS(20) II-1/3-1
Action required: 17 - Rectify deficiencies prior to departure
Due 8 October 2025
Resolved 15 October 2025
Resolution: PSCO observed 36 communications failure alarm conditions on the main alarm panel were rectified and found to be in good working order..
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 8 October 2025 Resolved
Where electrical power can normally be supplied by one generator, suitable load-shedding arrangements shall be provided to ensure the integrity of supplies to services required for propulsion and services as well as the safety of the ship. PSCO found that the generators were not capable of load shedding according to Chief Engineer as required by SOLAS II-1/53.2.1. 74SOLAS(20)II-1/53.2.1
Action required: 17 - Rectify deficiencies prior to departure
Due 8 October 2025
Resolved 15 October 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 October 2025 Resolved
MAIN AND AUXILIARY MACHINERY ESSENTIAL FOR THE PROPULSION, COTNROL, AND SAFETY OF THE SHIP SHALL BE PROVIDED WITH EFFECTIVE MEANS FOR ITS OPERATION AND CONTROL. PSCO RECEIVED NOTIFICATION FROM PILOT THAT [name withheld] TO GET MAIN ENGINE STARTED FOR AN EXTENDED PERIOD OF TIME WHILE PILOT WAS ONBOARD DURING DEPARTURE PROCEDURES.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 October 2025
Resolved 15 October 2025
Resolution: PSCO OBSERVED MAIN ENGINE WAS OPERABLE.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 October 2025 Resolved
A MAIN SOURCE OF ELECTRICAL POWER OF SUFFICIENT CAPACITY TO SUPPLY ALL THOSE SERVICES MENTIONED IN REGULATION 40.1.1 SHALL BE PROVIDED. PSCO RECEIVED NOTIFICATION FROM PILOT THAT VESSEL EXPERIENCED PARTIAL BLACKOUT WHEN BRINGING THE BOW THRUSTER ONLINE DURING DEPARTURE, CAUSING THE EDG TO START. 74SOLAS(20) II-1/41.1.1
Action required: 17 - Rectify deficiencies prior to departure
Due 6 October 2025
Resolved 15 October 2025
Resolution: PSCO OBSERVED BOW THRUSTER TO BE OPERATIONAL AND NOT AFFECTING EDG FUNCTIONS.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 4 October 2025 Resolved
Each emergency generating set arranged to be automatically started shall be equipped with starting devices approved by the administration with a stored energy capability of at least three consecutive start. A second source of energy shall be provided. Crew was unable to show secondary means of starting for emergency genset. 74SOLAS(20) II-I/44.2
Action required: 17 - Rectify deficiencies prior to departure
Due 4 October 2025
Resolved 5 October 2025
Resolution: Attended vessel to witness test of EDG. SAT
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 4 October 2025 Resolved
Oil filtering equipment shall be of a design approved by the administration and shall be such as will ensure that any oily mixture discharged into the sea after passing through the system has an oil content not exceeding 15PPM. Crew was unable to show last date the OWS as used on the devices screen. MARPOL ANNEX I/14.6
Action required: 17 - Rectify deficiencies prior to departure
Due 4 October 2025
Resolved 6 October 2025

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.