Documentation record
Registered dimensions (L × B × D)64.0 ft × 24.0 ft × 4.4 ft
Registered tonnagegross 90 / net 81
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderELEVATING BOATS INC · CARNARVON, LA, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW ORLEANS, LA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 10 June 2026 · expires 30 June 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it90 - Regulatory (Subpart C or D), Gross Ton
81 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 2 inspections, each with its date, unit and type; 9 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Construction/Loadline › Hull › Bottom Plating
Issued 23 September 2016
Resolved
Repair hull structure under generator via crop and renew IAW high strength steel welding procedures.
Action required: 17 - Rectify deficiencies prior to departure
Due 23 September 2016
Resolved 21 October 2016
Resolution: witnessed satisfactory repairs
Construction/Loadline › Structures › Deck Plating
Issued 23 September 2016
Resolved
Repair STBD hatch coming and provide satisfactory NDT
Action required: 17 - Rectify deficiencies prior to departure
Due 23 September 2016
Resolved 21 October 2016
Resolution: witnessed satisfactory repairs
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 23 September 2016
Resolved
Provide alcohol testing capability.
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 5 October 2016
Resolution: witnessed satisfactory alcohol test strips
Electrical › Electric Supply System (service) › Cable
Issued 23 September 2016
Resolved
Replace and secure wire connection in STBD engine room.
Due 30 September 2016
Resolved 5 October 2016
Resolution: witnessed satisfactory installation onboard.
Accommodation/Occupational Safety › Heating › Piping
Issued 23 September 2016
Resolved
Provide satisfactory lagging.
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 21 October 2016
Resolution: witnessed satisfacoty lagging installation
Navigation › Piloting/Steering › Notices to Navigation
Issued 23 September 2016
Resolved
Provide chart correction kit.
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 5 October 2016
Resolution: witnessed satisfactory chart correction kit and charts for AOR, as well as well as means to log updates. vessel did not have an area of operation because it is stacked therefore did not winess fully updated charts.
Engineering › Steering Gear System › Hydraulic Hose
Issued 23 September 2016
Resolved
Repair hydraulic oil leak.
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 5 October 2016
Resolution: witnessed satisfactory repair. vessel hydraulics operated without leaking hydraulic fluid
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 23 September 2016
Resolved
Provide permanent vessel crew. Note: vessel does not meet warm stack requirements per local policy.
Action required: 705 - Other - as specified
Due 23 October 2016
Resolved 5 October 2016
Resolution: cleared due to vessel meeting local warm stack policy requirments.
Operations/Management › Vessel Activity › Other
Issued 30 August 2016
Resolved
Properly man vessel in accordance with COI, conduct drills and complete required maintenance prior to sail.
Vessel has been unmanned for approximately 1 year. The vessel is not incompliance with MSUMCINST 16711.1A "Warm stack and lay-up policy for OSV's and SPV's"
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2016
Resolution: Cleared via satisfactory implementation of Warm stack program onboard and correct first set of required log entries.