GAIL ANN is a 1981 towing vessel. The Coast Guard has recorded 22 inspections since 1987, most recently in April 2024, along with 12 deficiencies — 2 with no resolution recorded — and 3 casualty investigations between 2008 and 2011.
Records from 1987 to 2024. Most recent: inspection, 29 April 2024.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
The counts in the strip above are the same counts; this table splits the inspections by
the kind of activity recorded. A blank resolution means none was recorded in this data; it
does not establish that a deficiency is outstanding. Years with a record are calendar
years in which a record exists, not years in service.
What Maury does not do.
Documentation record
Registered dimensions (L × B × D)63.3 ft × 24.0 ft × 7.0 ft
Registered tonnagegross 148 / net 100
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderNEW ALBANY, IN, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portLOUISVILLE, KY
Trade endorsementsCoastwise, unrestricted
DocumentationCase Pending · issued 30 June 2004
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it148 - Regulatory (Subpart C or D), Gross Ton 100 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
What it gives that this page does not: the whole record in one
dated, citable document — every line with its Coast Guard activity id, the retrieval
date on the cover, built to print to PDF with its page breaks — that a surveyor can
attach and a lender can file. The same facts as this page, complete and in one file.
Every recorded inspection, 1980 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
A request, not a checkout: leave an email and Maury replies once, with
the dated document for this hull and a Stripe invoice for $299. Nothing is charged before
the document is in your hands.
Used only to answer this request.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 August 2023Resolved
A fixed fire pump must be capable of: (1) Delivering water simultaneously from the two highest hydrants, or from both branches of the fitting if the highest hydrant has a Siamese fitting, at a pitot-tube pressure of at least 344 kilopascals (kPa) (50 pounds per square inch (psi)), and a flow rate of at least 300 liters per minute (lpm) (80 gallons per minute (gpm)); and (2) Being energized remotely from a safe place outside the engine room and at the pump. Vessels fixed fire pump has low pressure, PSI gauge was broken, fire pump main breaker was not labeled and fire main could not be energized and secured at each location.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2023
Resolved 18 September 2023
Resolution: Vessels fixed fire pump, PSI gauge was replaced, fire pump main breaker hs been labeled and fire main can be energized and secured at each location.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 21 August 2023Resolved
Vessel fuel oil vent piping is restricted by rust and dirt. Clean or replace flame screens.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2023
Resolved 5 September 2023
Resolution: CLEANED WITH WIRE BRUSH
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 August 2023Resolved
Pressure vessel relief valves must be tested or replaced twice in 5 years no more than 3 years. Vessel did not have proof of testing or purchase.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2023
Resolved 18 September 2023
Resolution: Pressure vessel relief valves were replaced
Vessel needs to install a valid copy of their COD on the vessel bridge.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2023
Resolved 5 September 2023
Resolution: PLACED IN THE PILOT HOUSE
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 21 August 2023Resolved
Inspection and testing. All portable fire extinguishers, semi-portable fire-extinguishing systems, fire-detection systems, and fixed fire-extinguishing systems, including ventilation, machinery shutdowns, and fixed fire-extinguishing system pressure-operated dampers on board the vessel, must be inspected or tested at least once every 12 months. Vessel was missing their certificates.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2023
Resolved 5 September 2023
Resolution: RECEIVED FROM CINTAS AND PLACED ON VESSEL FILES
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 21 August 2023Resolved
Towing vessels must meet the communications requirements of 33 CFR part 26 and 33 CFR 164.72, as applicable. Vessel radio was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2023
Resolved 25 August 2023
Resolution: REPLACED BATTERY BACKUP FOR PORT RADIO
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 August 2023Resolved
Vessels life rings line was dry-rot, replace life line and properly secure around the body of ring.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 September 2023
Resolved 18 September 2023
Resolution: replaced life line and properly secured around the body of ring.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 9 December 2021Resolved
Capt. o/b did not have a Radio Operators permit.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2022
Resolved 14 March 2022
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 9 December 2021Resolved
Vessel did not have required 3 day/3night flares OR 3 combination flares o/b.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2022
Resolved 14 March 2022
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 9 December 2021No resolution recorded
Bridge windows had multiple cracks. Correct at next DryDock.
Action required: 705 - Other - as specified
Due 31 May 2024 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2021Resolved
Steering air system below pilothouse appears to have a leak. Verify proper function of steering air lines.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 January 2022
Resolved 14 March 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 December 2021No resolution recorded
Remote fuel shut off valve must be installed in the fuel piping directly outside of the fuel oil supply tank. The current arrangement has the shut off next to the machinery. Owner shall make repairs at next dry-dock.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 May 2024 — due date passed with no resolution recorded
6 June 2008Routine · role: Transiting Vicinity of Primary Subject · activity 3229597
21 June 2008Routine · role: Sighted in Area · activity 3243216
7 May 2011Routine · role: Sighted in Area · activity 4022058
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.