Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)34.4 ft × 15.4 ft × 5.5 ft
Registered tonnagegross 27 / net 18
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderLEE TOWING CO, INC · ORANGE, TX, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portBATON ROUGE, LA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 5 May 2026 · expires 31 May 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it27 - Regulatory (Subpart C or D), Gross Ton 18 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 17 inspections, each with its date, unit and type; 12 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 17
10 April 2026Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 8345858
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 January 2024Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be installed and be operable from a safe place outside the space where the valve is installed. The remote fuel shutoff was inoperable. Repair remote fuel shutoff.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 January 2024
Resolution: Remote valve repaired and tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 January 2024Resolved
Fuel hose, if designed for use with clamps, must be installed with two hose clamps at each end of the hose. Some of the fuel hoses over barbed fittings on the generators were not double-hose-clamped. Install additional hose clamps on all fuel hoses or otherwise make hoses comply with 46 CFR 143.265(d)(2)(v).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2024
Resolved 9 January 2024
Resolution: Fuel hoses clamped.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 January 2024Resolved
Piping for flammable/combustible liquid, seawater cooling, or firefighting systems must be fitted with valves that are clearly marked by labeling or color coding that enables the crew to identify its function. Color code or label applicable piping in engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2024
Resolved 5 February 2024
Resolution: Piping color-coded.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 January 2024Resolved
Each towing vessel must carry at least one appropriately-sized life jacket (meeting approval series) for each person onboard, with additional life jackets available at each watch station. Vessel was missing 01 life jacket required by the vessel's COI. Acquire and properly outfit missing life jacket.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2024
Resolved 9 January 2024
Resolution: Life jacket installed onboard.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 5 January 2024Resolved
Each inland towing vessel must be equipped with navigation lights in accordance with 33 CFR part 84. Stern navigation light was inoperable. Repair light.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2024
Resolved 9 January 2024
Resolution: Light repaired.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 5 January 2024Resolved
Each hose assembly used for transferring oil must be tested annually to 1.5 times max allowable working pressure and must be marked with test pressure and test date. Ensure fuel transfer hose is properly pressure tested and labeled as described above.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2024
Resolved 12 February 2024
Resolution: Hoses were tested and properly labeled.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 June 2023Resolved
Repairs and minor alterations to existing towing vessels that are not "replacements-in-kind" must comply with the requirements of Subpart C of Part 143. As per 46 CFR 143.510, verification of compliance with machinery design standards is obtained by following provisions in 46 CFR 144.135 through 144.145. As per 46 CFR 144.135, new installations must undergo verification before a new installation is performed.
New engines that were installed onboard vessel did not undergo design verification prior to installation. Ensure design verification is completed for the new engine installation by a registered professional engineer or an authorized class society (see 46 CFR 144.140).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 July 2023
Resolved 11 August 2023
Resolution: Design verification complete. Document scanned into MISLE.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 January 2022Resolved
Electrical systems and equipment must minimize system failures and fire and shock hazards. Electrical systems must be suitably installed to prevent them from coming loose through vibration. Electrical meters on generator and engine room light fixture have vibrated loose from their permanent mounts, causing an electrical hazard. Properly mount meters and light fixture.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 February 2022
Resolved 20 January 2022
Resolution: Received photo evidence of deficiency corrections.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 29 April 2013Resolved
M&P Barge was not conducting drug testing background checks in accordance with 49 CFR 40.25.
Due 29 May 2013
Resolved 6 May 2013
Resolution: Conducted drug testing background check on most recent employee hired who is still employed with M&B Barge. M&P Barge has hired 02 personnel in the last two years and only one is still employed with M&P Barge.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 29 April 2013Resolved
M&P Barge had no documentation that current employees has proper EAP training.
Due 29 May 2013
Resolved 6 May 2013
Resolution: All employees attended viewed Moxie Media employee training video, and proof of training signed by each employee was provided to the Coast Guard.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 29 April 2013Resolved
M&P Barge did not have documentation that supervisory EAP training was conducted.
Due 29 May 2013
Resolved 6 May 2013
Resolution: Moxie Media supervisor training video was watched by supervisors and signed proof of training was provided to the Coast Guard.
Operations/Management › Drug and Alcohol Testing › Testing, Random
Issued 29 April 2013Resolved
Random drug screening was conducted last year, but it was not evenly spread throughout the year. All randoms were administered at the end of the year between November and December of 2012.
Due 29 May 2013
Resolved 29 April 2013
Resolution: Went over requirement for testing to be spread equally throughout the year with Boyd Verret, owner of M&P Barge.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.