Records from 1990 to 2009. Most recent: inspection, 21 April 2009.
Documentation record
Registered dimensions (L × B × D)46.6 ft × 18.1 ft × 4.8 ft
Registered tonnagegross 13 / net 9
ITC dimensions (L × B × D)46.6 ft × 18.1 ft × 4.8 ft
ITC tonnageNot recorded
BuilderELEVATING BOATS INC · CAERNARVON, LA, UNITED STATES · built 1981
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationNo Operation - PM · issued 30 June 2004
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it13 - Regulatory (Subpart C or D), Gross Ton
9 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 28
21 April 2009
Hull Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3431463
20 March 2008
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3166405
6 January 2006
COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2560256
28 June 2004
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2113425
10 December 2003
Annual Inspection · Hull Examination
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1961762
23 August 2002
Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1665304
14 June 2001
COI Inspection · Hull Examination · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1429573
26 January 2001
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 179932
1 June 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1412107
5 August 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1360928
6 April 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 788626
30 March 1998
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1434693
16 February 1998
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 776247
24 December 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1443786
31 October 1995
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1457303
6 January 1995
Hull Examination · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1465806
23 August 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1175519
12 January 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1160754
12 November 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1439450
7 January 1993
Hull Examination · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 826458
21 October 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1415765
8 October 1992
Inclining Experiment
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 953730
29 January 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 644365
12 November 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1311737
21 October 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1254047
18 December 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 901927
19 October 1990
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 899319
23 January 1990
Hull Examination · Initial Certification
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 928812
Lifesaving › Visual Distress Signals (General) › Expired
Issued 20 March 2008
Resolved
Vessel's EPIRB has no paperwork. Vessel may not operate outside of 3 NM from the Coastline. 46 CFR 180.64
Action required: 705 - Other - as specified
Resolved 25 March 2008
Fire Fighting › Fire Pumps › Gears
Issued 20 March 2008
Resolved
Place a guard on the fire pump gears as requiredin 46 CFR 177.960
Due 27 March 2008
Resolved 25 March 2008
Construction/Loadline › Structures › Machinery Space Opening
Issued 20 March 2008
Resolved
Replace the steel around engine room entrance to regain water tight integrity as required in 46 CFR 179.360
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 March 2008
Communications › Alarms/Indicators › Bilge Alarm
Issued 20 March 2008
Resolved
Operate the hydraulic and bilge visual alarms in the pilot house as required in 46 CFR 182.530
Due 27 March 2008
Resolved 25 March 2008
Electrical › Electrical Distribution System (service)
Issued 10 December 2003
Resolved
Properly mount and support electrical power supply cable for sewage pump. LEGACY COMPONENT DESC: Wiring
Due 11 December 2003
Resolved 11 December 2003
Resolution: Installed bracket for wiring.
Engineering › Fuel Oil Storage/Transfer System
Issued 10 December 2003
Resolved
Replace flame screen on fuel tank vent. LEGACY COMPONENT DESC: Vent Pipe
Due 11 December 2003
Resolved 11 December 2003
Resolution: Replaced entire gooseneck.
Accommodation/Occupational Safety › Washroom/Toilet › Washbasin
Issued 10 December 2003
Resolved
Install hose clamps on grey water overboard discharge.
Due 11 December 2003
Resolved 11 December 2003
Resolution: Installed four hose clamps.
Construction/Loadline › Hull › Hull Plating
Issued 10 December 2003
Resolved
Crop and renew electric bilge pump overboard discharge thru hull fitting.
Due 11 December 2003
Resolved 11 December 2003
Resolution: Renewed thru hull fitting.
Construction/Loadline › Hull › Bottom Plating
Issued 10 December 2003
Resolved
Gauge and reweld fracture in hull plate, stbd side bow in way of #2 bottom longitudinal.
Condition: Damaged By Earlier Event
Due 11 December 2003
Resolved 11 December 2003
Resolution: Gauged and rewelded fracture.
Construction/Loadline › Hull › Hull Plating
Issued 10 December 2003
Resolved
Pad weld hole in side shell port side in way of frame #5.
Condition: Damaged By Earlier Event
Due 11 December 2003
Resolved 11 December 2003
Resolution: Repaired hole in side shell.
Deck/Cargo
Issued 1 June 2000
Resolved
RENEW HYDRAULIC SUPPLY HOSE ON CRANE PEDESTAL.
Condition: Unknown
Due 1 June 2000
Resolved 1 June 2000
Lifesaving
Issued 5 August 1999
Resolved
PROVIDE SATISFACTORY RESCUE BOAT AND/OR SUITABLE ALTERNATIVE AS PRESCRIBED IN [name withheld] DISTRICT POLICY LTR #16113 DATED NOVEMBER 12, 1998.
Condition: Unknown
Due 5 August 1999
Resolved 5 August 1999
Engineering
Issued 30 March 1998
Resolved
DOUBLE NUT CONTROL LINKAGE FOR MAIN ENGINE.
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Documentation
Issued 30 March 1998
Resolved
PROVIDE OUT OF SERVICE LETTER FROM 31OCT97 TO 30MAR98.
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Electrical
Issued 30 March 1998
Resolved
PROPERLY HARD WIRE ELECTRICAL CABLE FOR RANGE WITH APPROVED MARINE GRADE CABLE.
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Accommodation/Occupational Safety
Issued 30 March 1998
Resolved
INSTALL RELIEF VALVE ON HOT WATER HEATER WITH ONE OF LESS THAN 100 PSI.
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Construction/Loadline
Issued 30 March 1998
Resolved
INSTALL CHECK VALVE ON BILGE PUMP OVERBOARD DISCHARGE LINE AS PER 46 CFR 56.50-50(f).
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Navigation
Issued 30 March 1998
Resolved
INSTALL PROPER STERN LIGHT(135 ARC OF VISIBILITY).
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Electrical
Issued 30 March 1998
Resolved
PROPERLY LABEL ALL PANEL BOARDS AS PER 46 CFR 111.40-11.
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Navigation
Issued 30 March 1998
Resolved
PROVIDE CURRENT CHARTS OF OPERATING AREA.
Condition: Unknown
Due 30 March 1998
Resolved 30 March 1998
Documentation
Issued 12 November 1993
Resolved
Provide onboard stability letter and approved operating manual, no later that 12JAN94.
Condition: Unknown
Due 12 November 1993
Resolved 12 November 1993
Fire Fighting
Issued 12 November 1993
Resolved
Install discharge pressure gauge on fire pump and prove proper operation at60 psi.
Condition: Unknown
Due 12 December 1993
Resolved 16 November 1993
Documentation
Issued 23 January 1990
Resolved
PROVIDE FOR REVIEW THE FOLLOWING PLANS TO MSO NEW ORLEANS TO FORWARD TO COMMANDANT (G-MSC): GENERAL ARRANGEMENTS, INBOARD AND OUTBOARD PROFILE, LEG STRUCTURES, JACKING TOWER STRUCTURES, HYDRAULIC SYSTEMS, AND STABILITY CALCULATIONS.
Condition: Unknown
Due 23 January 1990
Resolved 23 January 1990
Documentation
Issued 23 January 1990
Resolved
PROVIDE FOR REVIEW TO MSO NEW ORLEANS AN OPERATING MANUAL TO FORWARD TO COMMANDANT (G-MSC). THIS IS TO INCLUDE LOCATIONS AND REPAIR PROCEDURES FOR ALL HIGH-TENSILE STEEL.
Condition: Unknown
Due 23 January 1990
Resolved 23 January 1990
Engineering
Issued 23 January 1990
Resolved
DEMONSTRATE PROPER OPERATION OF BILGE PUMP.
Condition: Unknown
Due 23 January 1990
Resolved 23 January 1990