Records from 1984 to 1993. Most recent: inspection, 9 February 1993.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 41
9 February 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 826714
6 August 1991
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1252666
5 April 1991
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1220944
1 February 1991
Re-Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1241854
31 July 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 902497
31 July 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1212674
20 June 1990
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 925410
13 June 1990
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1226655
26 March 1990
Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 909847
2 March 1990
Drydock Extension · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1244310
20 February 1990
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 922198
2 June 1989
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1200606
28 April 1989
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1044148
22 February 1989
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1042202
27 July 1988
Hull Examination · Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1346620
1 May 1988
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1198268
30 March 1988
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1037847
28 February 1988
COI Inspection · Drydock Extension
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 994349
30 September 1987
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1319546
21 September 1987
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1008590
31 July 1987
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1334122
20 May 1987
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1335883
31 March 1987
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1329096
10 March 1987
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1016586
22 January 1987
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1015111
18 May 1986
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1295156
15 April 1986
Credit Drydock
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 989928
24 March 1986
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 989622
7 March 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 989533
7 March 1986
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1304761
7 March 1986
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1306371
7 February 1986
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 991126
28 January 1986
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1305175
31 October 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1304757
25 October 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 995399
28 August 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 992381
23 April 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1290858
18 March 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1287945
14 February 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 976578
24 January 1985
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1290145
10 December 1984
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1283962
Construction/Loadline
Issued 1 February 1991
Resolved
Conduct examination of 18 inch fracture in gusset attachment on bow leg spud can to determine rate of propagation or confirmation that no further worsening of the fracture has occurred._x001C_
Condition: Unknown
Due 1 September 1991
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Accommodation/Occupational Safety
Issued 1 February 1991
Resolved
Prove proper operation of Marine Sanitation Device.
Condition: Unknown
Due 1 September 1991
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 1 February 1991
Resolved
Crop/renew all wasted brackets and knees in pre load tanks Nos. 38 & 39, various locations within the tanks. Replace wasted pipe supports and holedsection of shale shaker drain pipe in tank No. 38.
Condition: Unknown
Due 1 September 1991
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 1 February 1991
Resolved
Make permanent repair to 18 inch fracture in gusset attachment on bow leg spud can.
Condition: Unknown
Due 2 March 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Fire Fighting
Issued 1 February 1991
Resolved
Hydro test the six CO2 pilot cylinders for the Halon fixed fire extinguishing system.
Condition: Unknown
Due 1 September 1991
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 26 March 1990
Resolved
PROVIDE FLOOD LIGHTS FOR ILLUMINATION OF LIFEBOATS AND LIFERAFTS LAUNCHING AS REQUIRED BY 46 CFR 111.75-16.
Condition: Unknown
Due 26 March 1990
Resolved 26 March 1990
Unknown
Issued 26 March 1990
Resolved
REPAIR AND PROVE OPERATION OF THE FIRE DAMPER AT THE STAIR ENTRANCE TO THE CONTROL ROOM.
Condition: Unknown
Due 26 March 1990
Resolved 26 March 1990
Construction/Loadline
Issued 26 March 1990
Resolved
PROVIDE 30 X 30 MESH FLAME SCREEN ON THE EMERGENCY GENERATOR FUEL OIL DAY TANK VENT.
Condition: Unknown
Due 26 March 1990
Resolved 26 March 1990
Electrical
Issued 26 March 1990
Resolved
PROVIDE AN EXTERIOR MEANS TO SECURE THE PAINT LOCKER VENT FAN IN EVENT OF FIRE.
Condition: Unknown
Due 26 March 1990
Resolved 26 March 1990
Electrical
Issued 26 March 1990
Resolved
PROVIDE PROPER EYE FITTINGS ON THE JUNCTION BOX IN THE PAINT LOCKER.
Condition: Unknown
Due 26 March 1990
Resolved 26 March 1990
Unknown
Issued 26 March 1990
Resolved
PROVIDE FLAME SHIELD ON THE EMERGENCY GENERATOR RACOR FUEL FILTERS.
Condition: Unknown
Due 26 March 1990
Resolved 26 March 1990
Unknown
Issued 26 March 1990
Resolved
PROVIDE A MEANS FOR ACCURATLY DETERMINING GENERATOR OVERSPEED RPM.
Condition: Unknown
Due 26 March 1990
Resolved 26 March 1990
Unknown
Issued 26 March 1990
Resolved
PROVIDE DOCUMENTATION THAT THE PAINT LOCKER VENT FAN AND BLADES ARE SUITABLE FOR THE HAZARDIOUS LOCATION.
Condition: Unknown
Due 26 March 1990
Resolved 26 March 1990
Engineering
Issued 2 March 1990
Resolved
REPAIR THE BILGE HIGH LEVEL ALARMS FOR THE STBD FORWARD GENERATOR ROOM.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
PROVIDE DOCUMENTATION THAT THE PAINT LOCKER VENT FAN AND BLADES ARE SUIT- ABLE FOR THE HAZARDIOUS LOCATION. PROVIDE A MEANS TO SECURE THE FAN OUTSIDEOF THE SPACE IN THE EVENT OF A FIRE AND THE HALON IS TO BE DISCHARGED AND PROVIDE PROPER EYE FITINGS ON THEJUNCTION BOX LOCATED IN THE PAINT LOCKER.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Fire Fighting
Issued 2 March 1990
Resolved
REPAIR AND PROVE OPERATION OF THE HALON GENERATOR ENGINE SHUTDOWN FOR ANY MODE OF OPERATION EITHER ON THE LINE OR IDLE.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
AFTER COMPLETION OF THE OVERHAUL ON #1 GENERATOR ENGINE TEST OVERSPEED TRIPPARALAL OPERATION, REVERSE POWER TRIP, LOW LUBE OIL PRESSURE ALARM, AND HIGH JACKET WATER TEMPERATURE ALARM.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
PROVIDE FLOOD LIGHTS FOR ILLUMINATION OF LIFEBOATS AND LIFERAFTS LAUNCHING AS REQUIIRED BY 46 CFR 111.75-16.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Fire Fighting
Issued 2 March 1990
Resolved
REPAIR AND PROVE OPERATION OF THE FIRE DAMPER AT THE STAIR ENTRANCE TO THECONTROL ROOM.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Lifesaving
Issued 2 March 1990
Resolved
SECURE THE LIFERAFT REMOTE PULL CABLE FORWARD OF 2 LIFERAFTS.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Lifesaving
Issued 2 March 1990
Resolved
PROVIDE 2 ADDITIONAL COAST GUARD APPROVED AND SERVICED 25 MAN DAVIT LAUNCH-ED LIFERAFTS, OR REDUCE THE TOTAL NUMBER OF PERSONS ON BOARD TO 50.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Fire Fighting
Issued 2 March 1990
Resolved
PROVIDE COPY OF THE FOAM ANALYSIS REPORT.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Fire Fighting
Issued 2 March 1990
Resolved
REMOVE THE RUBBER VIBRATION DAMPER FLEXIBLE COUPLINGS FROM BOTH THE SUCTIONAND DISCHARGE SIDE OF BOTH FIRE PUMPS AND INSTALL A STEEL VIBRATION BELLOWON STEEL FLANGED SECTION OF PIPE.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Lifesaving
Issued 2 March 1990
Resolved
PROVIDE A REMOTE RELEASE MECHANISM FOR THE TWO RING BUOYS ON EITHER SIDE FITTED WITH WATER LIGHT, LINE AND SMOKE SIGNAL TO ALLOW RELEASE FROM A NORMALLY MANNED SPACE SUCH AS THE CONTROL ROOM.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Lifesaving
Issued 2 March 1990
Resolved
FOR THE STBD LIFEBOAT PROVIDE 11 ADDITIONAL 1/2 QUART BAGS OF WATER, 38 ADDITIONAL PROVISIONS PACKAGES, COMPASS LITE STICKS.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Lifesaving
Issued 2 March 1990
Resolved
FOR THE PORT LIFEBOAT PROVIDE 9 ADDITIONAL 1/2 QUART BAGS OF WATER, 34 ADDITIONAL PROVISIONS, COMPASS LITE STICKS, REPAIR THE WASTED SECTION OF THE PROVISION LOCKER STBD SIDE IN WAY OF AFT DOOR AND PROVIDE BOAT HOOK AND NEW BAILER.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE LOSS OF VENTRATION ALARM FOR THE MUD PIT VENTILATION SYSTEM.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE REMOTE EMERGENCY GENERATOR SHUTDOWN SWITCHES, TO CAUSE THE EMERGENCY GENERATOR TO SECURE WHEN ANY OF THE SWITCHED ARE ACTIVATED.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
CORRECT CABLE RUNS IN THE SHALE SHAKER AREA AND DRILL FLOOR TO COMPLY WITH IEEE 45, REPAIR THE PURGE SYSTEM ON THE DRILLER'S CONSOLE, AND REPLACETHE GENERAL ALARM CONTACT MAKER ON THE DRILL FLOOR AND INSTALL AN APPROVED TYPE SUITABLE FOR HAZARDIOUS LOCATIONS.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Engineering
Issued 2 March 1990
Resolved
PROVIDE FLAME SHIELD ON THE EMERGENCY GENERATOR RACOR FUEL FILTERS AND PROVIDE 30 X 30 MESH FLAME SCREEN ON THE EMERGENCY GENERATOR FUEL OIL DAY TANK VENT.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
PROVIDE HAND TACHOMETER OR MOUNT TACHOMETERS ON ALL 3 GENERATOR DIESEL ENGINES TO PROVIDE AN INDICATION OF ENGINE RPM.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
PROVIDE FUEL TANK VENTS WITH 30 X 30 MESH FLAME SCREENS ON BOTH CEMENT UNITDIESEL FUEL OR DAY TANKS.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
REPAIR THE EMERGENCY GENERATOR ALARM PANEL TO HAVE IT PROVIDE AN INDICATIONFOR ALARM CONDITION OR TRIP FOR OVERSPEED TRIP, HIGH JACKET WATER TEMPERATURE ALARM AND LOW LUBE OR PRESSURE ALARM.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Electrical
Issued 2 March 1990
Resolved
INSTALL ADDITIONAL GENERAL ALARM BELL ON THE MAIN DECK LEVEL PORT SIDE OF THE CANTILEVER IN WAY OF THE COOLING UNITS.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Fire Fighting
Issued 2 March 1990
Resolved
CLEARED
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Accommodation/Occupational Safety
Issued 2 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE STBD MUD PIT ROOM DOOR TO THE MOD PUMP ROOM TO ALLOW IT TO BE CLOSED AT ALL TIMES.
Condition: Unknown
Due 2 March 1990
Resolved 2 March 1990
Fire Fighting
Issued 22 February 1989
Resolved
MAKE GAS DETECTION SYSTEM COMPLETELY OPERATIONAL. SENSORS MALFUNCTIONING IN PORT PIT, STBD PIT, AND NIPPLE AREA.
Condition: Unknown
Due 22 February 1989
Resolved 22 February 1989
Documentation
Issued 22 February 1989
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 22 February 1989
Resolved 22 February 1989
Unknown
Issued 27 July 1988
Resolved
REPLACE HELIDECK FOAM SYSTEM SPRINKLER HEADS WITH ONES DESIGNED FOR FOAM USE. TEST SYSTEM IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 27 July 1988
Resolved 27 July 1988
Deck/Cargo
Issued 28 February 1988
Resolved
REPAIR THE BILGE PUMP LOCATED IN THE DIESEL PUMP ROOM.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Lifesaving
Issued 28 February 1988
Resolved
PROVIDE A SECOND SMOKE SIGNAL FOR THE UNITS RING BUOYS.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Fire Fighting
Issued 28 February 1988
Resolved
RENEW 2 LENGTHS OF 2 1/2" X 50' FIRE HOSE.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Fire Fighting
Issued 28 February 1988
Resolved
SUBMIT A COPY OF THE HELO DECK FOAM ANALYSIS REPORT.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Fire Fighting
Issued 28 February 1988
Resolved
PROVIDE FOR THE ANNUAL SERVICING OF THE UNITS FIXED, SEMI-PORTABLE, AND PORTABLE FIRE FIGHTING SYSTEMS.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Fire Fighting
Issued 28 February 1988
Resolved
COMPLY WITH USCG MTH-4 LETTER DATED 21JAN88. THIS LETTER REQUIRES TESTING OF THE HELO DECK FOAM SYSTEM IN THE PRESENCE OF A UL INSPECTOR WITH RESULTING DATA SUBMITTED TO MTH-4.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Fire Fighting
Issued 28 February 1988
Resolved
HYDROSTATICALLY TEST ANY SEMI-PORTABLE OR PORTABLE FIRE EXTINGUISHER WHICH HAS NOT BEEN TESTED WITHIN THE LAST FIVE YEARS.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Deck/Cargo
Issued 28 February 1988
Resolved
MAKE AVAILABLE FOR INTERNAL INSPECTION THE UNITS 8 BULK TANKS.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Lifesaving
Issued 28 February 1988
Resolved
PROVIDE AN AUXILIARY LINE OF 3" CIRCUMFERENCE X 1500' MANILA FOR THE UNIT'SLINE-THROWING GUN.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Lifesaving
Issued 28 February 1988
Resolved
INSTALL FLOAT-FREE LOCKING PINS FOR THE STARBOARD SIDE DAVIT LAUNCHED LIFERAFTS.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Lifesaving
Issued 28 February 1988
Resolved
TEST THE PORT AND STARBOARD LIFERAFTS RELEASE HOOKS.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Fire Fighting
Issued 28 February 1988
Resolved
RENEW THE HEAT DEFLECTOR ABOVE THE NUMBER 2 MAIN ENGINE.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Electrical
Issued 28 February 1988
Resolved
REPAIR AND TEST THE EMERGENCY GENERATOR LUBE OIL ALARM AND TRIP.
Condition: Unknown
Due 28 February 1988
Resolved 28 February 1988
Unknown
Issued 31 July 1987
Resolved
SUBMIT FOLLOWING PLANS TO CG MARINE SAFETY CENTER, WASHINGTON, DC, FOR APPROVAL: (A) FIRE DETECTION/ALARM SYSTEM (B) HELO DECK FOAM SYSTEM (C) HELO REFUELING SYSTEM
Condition: Unknown
Due 31 July 1987
Resolved 31 July 1987
Unknown
Issued 18 May 1986
Resolved
INSTALL A REMOTE TRIP SWITCH FOR THE HELO REFUELING PUMP AT EACH ACCESS TO THE HELO DECK. BOTH SWITCHES ARE TO BE INSTALLED PRIOR TO USE OF THE SYSTEM AND NO LATER THAN 18 JULY 1986
Condition: Unknown
Due 18 May 1986
Resolved 18 May 1986
Unknown
Issued 15 April 1986
Resolved
SUBMIT FOLLOWING PLANS TO CG 12MMT FOR APPROVAL: (A) FIRE DETECTION/ALARM SYSTEM, (B) GAS DETECTION/ALARM SYSTEM, (C) HELO DECK FOAM SYSTEM, (D) HELOREFUELING SYSTEM, (E) STRUCTURAL FIRE PROTECTION PLAN SHOWING MODIFICATIONSIN ACCOMMODATION SPACES,(F) FIRE CONTROL PLAN.
Condition: Unknown
Due 15 April 1986
Resolved 15 April 1986
Fire Fighting
Issued 7 March 1986
Resolved
PROVIDE FOR GENERATOR SHUTDOWN PRIOR TO HALON RELEASE
Condition: Unknown
Due 7 March 1986
Resolved 7 March 1986
Construction/Loadline
Issued 7 March 1986
Resolved
COMPLETE AGREED UPON WORKLIST ITEMS.
Condition: Unknown
Due 7 March 1986
Resolved 7 March 1986
Electrical
Issued 7 March 1986
Resolved
PROVIDE EMERGENCY SHUTDOWN FOR EMERGENCY DIESEL.
Condition: Unknown
Due 7 March 1986
Resolved 7 March 1986
Fire Fighting
Issued 7 March 1986
Resolved
INSTALL GENERAL ALARM IN MUD PIT ROOM
Condition: Unknown
Due 7 March 1986
Resolved 7 March 1986
Fire Fighting
Issued 7 March 1986
Resolved
SERVICE/RECHARGE HALON FIXED EXTINGUISHING SYSTEM
Condition: Unknown
Due 7 March 1986
Resolved 7 March 1986
Electrical
Issued 7 March 1986
Resolved
DEMONSTRATE REVERSE POWER TRIPS ON ALL GENERATORS (3)
Condition: Unknown
Due 7 March 1986
Resolved 7 March 1986