MAURY USCG vessel records Sign in
← All vessels

S-TROTTER

S-TROTTER is a 2000 tank ship. The Coast Guard has recorded 41 inspections since 2001, most recently in October 2017, along with 10 deficiencies and 12 operational controls.

Records from 2001 to 2017. Most recent: inspection, 2 October 2017.

Built
2000
Last inspected
2 October 2017
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9216547 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
LIBERIA
—
Maury page id
psix-20639

Inspections, by type

…with no type recorded16
Years with a record 14 calendar years (2001–2017)
The 41 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 9 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it19936 - Convention (Subpart B), Net Ton
68467 - Dead Weight, Metric Ton
81464 - Displacement, Metric Ton
39085 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 41

2 October 2017 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6279822
25 September 2017 COC-TVE Renew · Deficiency Check · ISPS II Exam · In-Service Inspection · Administrative Inspection · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6271156
8 April 2017 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6121609
25 November 2016 COE-Administrative
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6047375
9 September 2016 Ballast Water Examination · COC-TVE Annual · ISPS II Exam · COE-Dockside
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5988670
8 September 2016 Type not recorded
No type recorded · Station Port Aransas · USCG Heartland District (CGD-H) · Activity 5995943
1 September 2016 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5989880
14 July 2016 COE-Administrative
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5941034
6 September 2015 COC-TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5236775
21 August 2014 Administrative Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4965310
12 August 2014 Ballast Water Examination · ISPS II Exam · COC-TVE Annual
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4945004
7 August 2014 Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 4947250
29 July 2012 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 4394265
11 June 2012 COC-TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4329709
24 December 2011 COE-Administrative
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4213550
23 September 2011 COE-Administrative
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4152408
22 September 2011 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4152206
31 August 2011 COE-Offshore
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4123927
8 May 2009 MARPOL Annex VI Survey · COC-TVE Renew · MARPOL Annex I Examination · MARPOL Annex V Examination · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3460473
19 October 2007 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3083002
28 September 2007 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3068137
4 May 2007 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2922865
30 April 2007 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2919232
17 April 2007 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2909188
17 April 2007 ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2909665
16 April 2007 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2908813
22 July 2006 COC-TVE Renew · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2721045
14 April 2005 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2332896
11 January 2005 Ballast Water Examination · ISPS II Exam · COC-TVE Annual
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2271913
10 November 2004 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2238760
31 July 2004 Ballast Water Examination · ISPS II Exam · NPV Safety Exam
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2149125
6 June 2004 Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 2124993
23 March 2004 Re-Inspection · Ballast Water Examination
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2029812
22 March 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2029883
7 January 2004 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1978138
2 December 2003 Certificate of Compliance · Ballast Water Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1957780
2 June 2003 Security Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1807670
13 September 2002 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1675073
30 November 2001 Tank Vessel Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 295998
5 April 2001 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 288682
1 April 2001 Tank Vessel Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1062077

Deficiency record · 10

Deck/Cargo › Inert Gas System › Boiler Uptake
Issued 25 September 2017 Resolved
1899-Vessel's boilers are inoperable rendering the Inert Gas System inoperable. As a result, crew began purging all cargo tanks and were unable to inert tanks. All tanks now showing pressure levels between -5mmHG and +5mmHg, normal procedure is to maintain +200mmHg tank pressure. 60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 September 2017
Resolution: SEC HOU-GAL PSC Branch received a class report satisfying the requirements
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 25 September 2017 Resolved
0799-Foam analysis certificate for low and high expansion foam show wrong data for tests conducted in 2017. Engine room foam certificate states it is low expansion, fluoroprotein, and deck foam states it is high expansion with no sample data entered. 60ac
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 September 2017
Resolution: SEC HOU-GAL PSC Branch received a class report satisfying the requirements
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 25 September 2017 Resolved
0799-The foam room, at deck foam tank, contained no instructions on how to operate the system. 60ac
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 September 2017
Resolution: SEC HOU-GAL PSC Branch received a class report satisfying the requirements
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 25 September 2017 Resolved
1160- Pressor sensor on cargo tank 6S was reading -78mmHg, indicating a faulty sensor. 60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 27 September 2017
Resolution: SEC HOU-GAL PSC Branch received a class report satisfying the requirements
Construction/Loadline › Markings › Load Line Mark
Issued 12 August 2014 Resolved
The ring lines and letters shall be painted in white or yellow on a dark background or in black on a light background and plainly visible. Starboard load line paint has been completely rubbed off and not of a contrasting color. ICLL Part 2, Annex I/Ch.I Reg 8. 40ac.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 21 August 2014
Resolution: Load line was painted on both sides of the ship.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 12 August 2014 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Deck water seal has soft patches. 74 SOLAS (09 Cons) I/11(a). 40ac.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 August 2014
Resolution: Deck water seal drain pipe was replaced.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type 1
Issued 12 August 2014 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. MSD was found to have holes in the top cover plate. 74 SOLAS (09 Cons) I/11(a). 40ac.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 21 August 2014
Resolution: MSD was repaired.
Construction/Loadline › Penetrations › Weld
Issued 12 August 2014 Resolved
The condition of the ship & its equipment shall be maintained to conform with the provisions of the present regs to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. Weld around foam line as it exits the fwd bulkhead of the pump room was found to be undercut/cracked allowing water to enter space. 74 SOLAS (09 Cons) I/11(a). 40ac.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 21 August 2014
Resolution: Area was re-welded and tested.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 12 August 2014 Resolved
The purpose of this regulation is to prevent the ignition of combustible materials of flammable liquids. Means shall be provided to control leaks of flammable liquids. The cut-off valve on the emergency generator's fuel oil tank was found to be leaking. 74 SOLAS (09 Cons) II-2/1.1. 10c.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 12 August 2014
Resolution: Crew tightened valve and cleaned up oil leak.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 17 April 2007 Resolved
Vessel must provide a valid copy of the Vessel Response Plan and CG approval letter prior to cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 April 2007
Resolution: Vessel provided a valid Vessel Response Plan and CG approval letter

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.