Records from 1985 to 1997. Most recent: inspection, 5 November 1997.
Documentation record
Registered dimensions (L × B × D)50.0 ft × 13.7 ft × 5.0 ft
Registered tonnagegross 23 / net 19
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPETERSON BOAT WORK · DOUGLAS, MI, UNITED STATES · built 1980
Hull materialSteel
PropulsionGasoline Engine
Hull shapeShip
Hull configurationMonohull
Hailing portDOUGLAS, MI
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationNo Operation - PM · issued 26 July 1982 · expires 30 April 1998
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it23 - Simplified, Gross Ton
19 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 26
5 November 1997
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1117548
14 January 1997
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1099016
6 August 1996
Examination of Repairs
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1363745
27 February 1996
Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1414574
24 May 1995
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 872548
24 April 1995
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1449811
4 October 1994
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1181609
29 June 1994
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1180496
5 May 1994
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1423941
23 April 1993
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 839136
1 May 1992
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1268224
10 July 1991
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 934719
21 May 1991
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 926623
16 April 1991
Hull Examination
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 926624
11 May 1990
Re-Inspection · Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1241348
8 May 1989
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1208151
18 May 1988
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1198666
20 April 1987
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1002325
14 April 1987
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1310722
12 May 1986
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1310958
20 February 1986
Credit Drydock
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1297259
11 December 1985
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 989293
2 December 1985
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1303185
10 June 1985
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1293431
16 May 1985
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 977976
16 May 1985
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1295272
Navigation
Issued 24 April 1995
Resolved
UPDATE LOCAL AREA CHART AND PROVIDE NAVIGATION RULE BOOK ON BOARD.
Condition: Unknown
Due 24 April 1995
Resolved 24 April 1995
Engineering
Issued 24 April 1995
Resolved
PROVIDE MACHINERY GUARDS FOR MOVING PARTS OF MAIN ENGINE AND STEERING CABLEIN ENGINE ROOM.
Condition: Unknown
Due 24 April 1995
Resolved 24 April 1995
Construction/Loadline
Issued 24 April 1995
Resolved
REPLACE EXISTING PLASTIC BILGE PIPE WITH RIGID METALLIC PIPE.
Condition: Unknown
Due 24 April 1995
Resolved 24 April 1995
Construction/Loadline
Issued 24 April 1995
Resolved
PROVIDE OPERABLE BILGE PUMP IN AFT VOID COMPARTMENT.
Condition: Unknown
Due 24 April 1995
Resolved 24 April 1995
Construction/Loadline
Issued 5 May 1994
Resolved
REPAIR OR REPLACE GASKET AND SAFETY LATCH ON WATERTIGHT SCUTTLE TO FORE PEAK TANK.
Condition: Unknown
Due 5 May 1994
Resolved 5 May 1994
Engineering
Issued 5 May 1994
Resolved
PROVIDE CLEAN BILGE OR DRIP PANS FOR BOTH ENGINES IN ENGINE ROOM.
Condition: Unknown
Due 5 May 1994
Resolved 5 May 1994
Engineering
Issued 5 May 1994
Resolved
PROVIDE FUEL TANK VENTS IN ACCORDANCE WITH 46 CFR 182.15-35.
Condition: Unknown
Due 5 May 1994
Resolved 5 May 1994
Electrical
Issued 5 May 1994
Resolved
PROVE OPERATION OF GENERATOR AND FIREPUMP.
Condition: Unknown
Due 5 May 1994
Resolved 5 May 1994
Engineering
Issued 21 May 1991
Resolved
DEMONSTRATE OPERATION OF FOREPEAK BILGE PUMP.
Condition: Unknown
Due 21 May 1991
Resolved 21 May 1991
Navigation
Issued 21 May 1991
Resolved
PLACE GREAT LAKES VOLUME OF COAST PILOT ABOARD VESSEL.
Condition: Unknown
Due 21 May 1991
Resolved 21 May 1991
Engineering
Issued 21 May 1991
Resolved
EXTEND EXHAUST VENTILATION DUCTING TO BILGE AREA UNDER ENGINE.
Condition: Unknown
Due 21 May 1991
Resolved 21 May 1991
Lifesaving
Issued 21 May 1991
Resolved
PLACE PFD'S AND PFD LOCKERS ABOARD VESSEL PRIOR TO CARRYING PASSENGERS AND_x001C_IN NO CASE LATER THAN 31MAY91.
Condition: Unknown
Due 21 May 1991
Resolved 21 May 1991
Engineering
Issued 11 May 1990
Resolved
DEMONSTRATE OPERATION OF REMOTE FUEL SHUTOFF PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 11 May 1990
Resolved 11 May 1990
Engineering
Issued 11 May 1990
Resolved
DEMONSTRATE OPERATION OF FOREPEAK AND LAZARETTE BILGE PUMPS PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 11 May 1990
Resolved 11 May 1990
Engineering
Issued 11 May 1990
Resolved
ELIMINATE LEAK IN JOINT IN THE FUEL LINE TO THE MAIN ENGINE PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 11 May 1990
Resolved 11 May 1990
Documentation
Issued 11 May 1990
Resolved
PROVIDE VESSEL CERTIFICATE OF DOCUMENTATION AND PLACE ABOARD THE VESSEL.
Condition: Unknown
Due 11 May 1990
Resolved 11 May 1990